Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Thu Apr 26, 2018 17:04:17 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3189613
Posted: Mar 10 2018 (11:24)

2 Responses
Last Response: Mar 15 2018 (22:18)
  
★  General Travel
0 Followers
2695 views
Mar 10 2018 (11:24)   ACOI/Allahabad Chheoki Junction (3 PFs)

mksald123~   844 blog posts   8 correct pred (57% accurate)
Entry# 3189613            Tags   Past Edits
Platform 1 (after increasing of height and increase of length for 26 boggies and shed making)
Earlier this platform had only station board before 2014-15
No platform height(concreting), no shed, no toilets, no shopstalls etc
When after 2014-15, many trains started diverting from here, this platform was ignored and platform 2-3 was constructed that time in south side.
But
...
more...
now it is being renovated to increase height and for 26 bogie type.
But I think railway didn't plan well. In North there are two lines, up and down for main line (ndls hwh)
Then this platform 1 having opening only to recieve train towards one end (south end)
North side line (Up line mentioned above) is two metres far from the platform.
Then there are six loop lines towards its south.
Then platform 2-3 combined.
I think if railway ne centre wali 6 loop lines me se do lines hatakar platform banaya hota to platform ke dono side ka utilisation ho jaata
But now only one side is used
Pic 1: Platform 1 seen from FOB
Pic 2: Allahabad Chheoki stn from road side
Pic 3: Platform 2-3 seen from FOB
Pic 4: New escalator at ACOI stn
Pic 5: New approach road decreasing distance of ACOI from Ald by 1 km (900 metres exactly)

  
1824 views
Mar 15 2018 (15:28)
Darth Vader~   1416 blog posts   7 correct pred (33% accurate)
Re# 3189613-1            Tags   Past Edits
Are appropriate facilities there like Cloakroom, Food Stalls, Waiting Hall etc. ?
What are the future plans for this Station ?
New Platform, Food Court, yards etc. ?
Awesome coverage BTW

  
1594 views
Mar 15 2018 (22:18)
mksald123~   844 blog posts   8 correct pred (57% accurate)
Re# 3189613-2            Tags   Past Edits
1 compliments
Really useful info, thanks ☺
Cloakroom No plan
Waiting room: Open walled and very small
Food stalls: Many dhaba just outside station on Allahabad Mirzapur NH 76E, Refreshments Stall on platform 2-3
No new platform planned
03 are sufficient for
...
more...
passing trains and only one passenger train originating (ACOI ET passenger)
No Yard planned
After DFC Commissioning in end 2019 between bhaupur and mughalsarai, the six(06) loop lines between platform 1 and platform 2-3 will be free as Yard type as they caters only for looping goods train now
But also there is space towards south side for making 3-4 line Yard which in future can be utilised

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun May 6
Trains with ARP 15 Dep on: Fri May 11
Trains with ARP 30 Dep on: Sat May 26
Trains with ARP 120 Dep on: Fri Aug 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.