Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sat Jun 23 14:17:15 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3190058
Posted: Mar 10 (13:18)

7 Responses
Last Response: Mar 10 (14:16)
  
Rail News
0 Followers
488 views
Other News
Mar 10 (10:32)   Say goodbye to late trains! Indian Railways taking these 10 steps to ensure punctuality

16591🔹Hampi Express🔹16592^~   2516 news posts
Entry# 3190058   News Entry# 331116         Tags   Past Edits
Indian Railways’ new plan to ensure punctuality of trains is likely to cheer frequent rail travellers who complain about delays in journey. Focus on punctuality of trains is a welcome move, and one that will go a long way in helping Indian Railways improve its service standards. Piyush Goyal-led Indian Railways has come up with a two-stage plan to make sure that trains are punctual; this entails grading/giving points to trains on the basis of the minutes by which they have been delayed and tracking this indicator on a daily basis to come up with an average score. A report by Railway Board, seen by FinancialExpress.com, has details of the multi-pronged strategy that all divisions of Indian Railways have been asked to adopt for improving punctuality of trains.
For
...
more...
a long-distance train that is late by less than 10 minutes the highest grade of A (Excellent) will be awarded, implying a score of 5. A delay between 10-20 minutes would earn a grade of B (Very Good) with a score of 4; between 20-40 minutes delay is grade C (Good) with 3 points; 40-120 minutes is D (Fair) with 2 points. While a delay of over 2 hours would get the train E grade (Bad) and a score of 1, cancellation would also earn E, but with 0 points. For short distance trains, the criteria is stricter; A grade (5 points) for delay of less than 5 minutes; B grade (4 points) for delay of less than 15 minutes; ; C grade (3 points) for delay of less than 30 minutes; ; D grade (2 points) for delay of less than 45 minutes; and E grade for less than and beyond 90 minutes (1 point for 90 minutes). The final percentage of punctuality will be arrived at by multiplying the number of days with respective points for those days, adding each up, dividing by the total number of days and multiplying by 100.
Apart from grading each train, the second stage of the crucial plan has a list of short-term and long-term measures that various divisions have to implement – the instructions for which have been issued by the Railway Board. In the short-term to increase the punctuality of trains, Indian Railways proposes to do the following:
1. Cordon off tracks with the help of fencing to prevent cattle, humans and vehicles from trespassing
2. Eliminate surface and unmanned level crossings
3. Curtailment of halt timings
4. Using dataloggers for automatic feed of train numbers and timings in the control office application
5. In case a train does not meet a set occupancy rate, then it will be cancelled and the passengers adjusted in other trains. This would help in better capacity utilisation of existing tracks
6. Along the golden quadrilateral route, slow moving passenger trains will be replaced with MEMU/DEMU
7. There will be standard composition and formation of similar category of trains namely; Shatabdi, Rajdhani, Mail Express and passenger trains.
8. In congested sections, locos will be changed instead of reversal. Maintenance of rakes and assets will be man-hour based.
9. Line box will not be used any more so that the handing or taking over time will be reduced
10. Adequate number of spare parts for both ICF and LHB-type coaches should be made made available to avoid delays due to maintenance related issues.
In the long-term, Indian Railways hopes to put in place automatic signalling instead of ‘Absolute Block System’; have separate corridors for main and suburban lines; also separate corridors for goods and passenger trains; expedite the process of right powering of coaches and goods trains; and maintain a speed of 30 kmph and above for crossovers. Additionally Indian Railways plans to develop capability that allows for locos to be maintained in any shed of the network instead of only the home shed. Indian Railways has also decided that electric-cum-diesel locomotives should be developed for sections that have OHE (Over-head equipment) and those that don’t.

7 Public Posts - Sat Mar 10, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jul 3
Trains with ARP 15 Dep on: Sun Jul 8
Trains with ARP 30 Dep on: Mon Jul 23
Trains with ARP 120 Dep on: Sun Oct 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3555168
    Jun 20 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
  • Entry# 3444356
    May 23 2018 (12:09PM)


    @all: With the introduction of the pre-moderation scheme for new IDs described here Blog Entry# 3443990-1 and Entry# 3441062 , following is a summary of Forum Guidelines in effect: . 1. Blog Posts by new IDs appear in public ONLY AFTER scrutiny and approval by FMs. A member may create as many Fake IDs as...
  • Entry# 3441062
    May 22 2018 (12:51PM)


    The system detailed here Blog Entry# 3440635 will be rolled out soon. Meanwhile, immediately, to curb the menace of fake IDs, starting tomorrow, all blog posts from New Members will be "PRE-moderated". . What this means is that, UNTIL the member acquires at least 10 public positive Ratings - Great/Thanks, etc. . 1. ALL posted blogs...
  • Entry# 3440635
    May 22 2018 (10:04AM)


    To curb the proliferation of duplicate IDs in IRI, we shall soon be requiring SMS-based authentication to post blogs. . Members will be required to provide a mobile phone number to authenticate their accounts. An OTP will be sent to the number. Upon entering the OTP, the account will be associated with that...
  • Entry# 3416383
    May 14 2018 (12:40PM)


    This an advance announcement of some important changes coming to our Groups. . Pl. read Entry# 2136570 posted more than a year ago. Subsequent to this, some long-pending changes will be introduced in the coming weeks. . At this point, we have many Groups with hundreds of dormant/inactive members who may have left the site...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy