Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Thu Apr 19, 2018 17:46:37 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback

Blog Entry# 3190058
Posted: Mar 10 2018 (13:18)

7 Responses
Last Response: Mar 10 2018 (14:16)
  
Rail News
0 Followers
412 views
Other News
Mar 10 2018 (10:32)   Say goodbye to late trains! Indian Railways taking these 10 steps to ensure punctuality

16229🔹Mysuru↔️Varanasi Express🔹16230^~   2230 news posts
Entry# 3190058   News Entry# 331116         Tags   Past Edits
Indian Railways’ new plan to ensure punctuality of trains is likely to cheer frequent rail travellers who complain about delays in journey. Focus on punctuality of trains is a welcome move, and one that will go a long way in helping Indian Railways improve its service standards. Piyush Goyal-led Indian Railways has come up with a two-stage plan to make sure that trains are punctual; this entails grading/giving points to trains on the basis of the minutes by which they have been delayed and tracking this indicator on a daily basis to come up with an average score. A report by Railway Board, seen by FinancialExpress.com, has details of the multi-pronged strategy that all divisions of Indian Railways have been asked to adopt for improving punctuality of trains.
For
...
more...
a long-distance train that is late by less than 10 minutes the highest grade of A (Excellent) will be awarded, implying a score of 5. A delay between 10-20 minutes would earn a grade of B (Very Good) with a score of 4; between 20-40 minutes delay is grade C (Good) with 3 points; 40-120 minutes is D (Fair) with 2 points. While a delay of over 2 hours would get the train E grade (Bad) and a score of 1, cancellation would also earn E, but with 0 points. For short distance trains, the criteria is stricter; A grade (5 points) for delay of less than 5 minutes; B grade (4 points) for delay of less than 15 minutes; ; C grade (3 points) for delay of less than 30 minutes; ; D grade (2 points) for delay of less than 45 minutes; and E grade for less than and beyond 90 minutes (1 point for 90 minutes). The final percentage of punctuality will be arrived at by multiplying the number of days with respective points for those days, adding each up, dividing by the total number of days and multiplying by 100.
Apart from grading each train, the second stage of the crucial plan has a list of short-term and long-term measures that various divisions have to implement – the instructions for which have been issued by the Railway Board. In the short-term to increase the punctuality of trains, Indian Railways proposes to do the following:
1. Cordon off tracks with the help of fencing to prevent cattle, humans and vehicles from trespassing
2. Eliminate surface and unmanned level crossings
3. Curtailment of halt timings
4. Using dataloggers for automatic feed of train numbers and timings in the control office application
5. In case a train does not meet a set occupancy rate, then it will be cancelled and the passengers adjusted in other trains. This would help in better capacity utilisation of existing tracks
6. Along the golden quadrilateral route, slow moving passenger trains will be replaced with MEMU/DEMU
7. There will be standard composition and formation of similar category of trains namely; Shatabdi, Rajdhani, Mail Express and passenger trains.
8. In congested sections, locos will be changed instead of reversal. Maintenance of rakes and assets will be man-hour based.
9. Line box will not be used any more so that the handing or taking over time will be reduced
10. Adequate number of spare parts for both ICF and LHB-type coaches should be made made available to avoid delays due to maintenance related issues.
In the long-term, Indian Railways hopes to put in place automatic signalling instead of ‘Absolute Block System’; have separate corridors for main and suburban lines; also separate corridors for goods and passenger trains; expedite the process of right powering of coaches and goods trains; and maintain a speed of 30 kmph and above for crossovers. Additionally Indian Railways plans to develop capability that allows for locos to be maintained in any shed of the network instead of only the home shed. Indian Railways has also decided that electric-cum-diesel locomotives should be developed for sections that have OHE (Over-head equipment) and those that don’t.

2 posts - Sat Mar 10, 2018

  
1275 views
Mar 10 2018 (14:05)
gvvnjr   473 blog posts   92 correct pred (74% accurate)
Re# 3190058-3            Tags   Past Edits
Lethargic attitude of some IR employees must also be taken into account.

  
1333 views
Mar 10 2018 (14:09)
16535❤GolGumbaz Express❤16536~   3254 blog posts   281 correct pred (53% accurate)
Re# 3190058-4            Tags   Past Edits
Thats what I mentioned regarding grading should be on Controllers instead of Trains...

  
1314 views
Mar 10 2018 (14:11)
gvvnjr   473 blog posts   92 correct pred (74% accurate)
Re# 3190058-5            Tags   Past Edits
Not only controller and LP sir many other departments also should be introspected

  
1305 views
Mar 10 2018 (14:12)
Obi Wan has taught you well~   3768 blog posts   1666 correct pred (74% accurate)
Re# 3190058-6            Tags   Past Edits
1 compliments
lol..
their grading system is laughable
a delay of 40 minutes is 'good', and that of 120 minutes is 'fair' :P
this is nothing more than yet another lame attempt to fool public
never seen the ministry to be this publicity hungry ever!!!
also,
...
more...
when it comes to meeting set occupancy targets, they'll probably have to cancel almost 75% of the trains introduced during both his and his predecessors tenure, like HS, many antyodaya, premium/suvidha special etc :P good luck doing that without making a fool of yourself :D

  
1288 views
Mar 10 2018 (14:16)
16535❤GolGumbaz Express❤16536~   3254 blog posts   281 correct pred (53% accurate)
Re# 3190058-7            Tags   Past Edits
Hhm Many other Department can also be looked but the train running dept is the one which relates more for this delays i think..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 29
Trains with ARP 15 Dep on: Fri May 4
Trains with ARP 30 Dep on: Sat May 19
Trains with ARP 120 Dep on: Fri Aug 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.