Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Mon Dec 17 10:45:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3196440
Posted: Mar 12 (14:08)

3 Responses
Last Response: Mar 12 (15:08)
  
Rail News
0 Followers
947 views
Other News
CMRL/Chennai Metro
Mar 12 (14:04)   CMRL Publishes Official Phase 2 Map of Chennai Metro Project

16591🔹Hampi Express🔹16592^~   3042 news posts
Entry# 3196440   News Entry# 331210         Tags   Past Edits
So last month, Chennai Metro Rail Ltd. (CMRL) published nine separate notices inviting bids from companies for the appointment of detailed design consultants (DDC) and geotechical engineering firms as part of the pre-construction activities for developing a 50 km portion of Chennai Metro’s new Line-3 and Line-5 under the 108 km Phase 2 project.
Within one of those notices, CMRL has published an official map of the project – the first to ever be released by the organization – which will comprise of 3 new lines with 104 stations
Here’s a list of
...
more...
all proposed stations. Note that these 3 lines provide interchange connectivity with not just one another but also with the 54 km Phase-1’s Line-1 (Airport – Wimco Nagar) & Line-2 (St. Thomas Mount – Central), something which will be unique to Chennai if these get built as-is.
• Line-3 (shown in Green) Madhavaram – SIPCOT (45.81 km) with 50 stations at Madhavaram Milk Colony (interchange with Line-5), Thapal Petti, Murari Hospitial, Moolakadai, Sembiyam, Perambur Market, Perambus Metro, Ayanavaram, Otteri, Pattalam, Perambur Barracks Road, Purasaiwakkam High Road, Kelley’s, KMC (interchange with Line-2), Chetpet Metro, Sterling Road Junction, Nungambakkam, Gemini, Thousand Lights (interchange with Line-1), Royapettah Govt Hospital, Radhakrishnan Salai Junction, Thirumayilai Metro (interchange with Line-4), Madaiveli, Greenways Road Metro, Adyar Junction, Adyar Depot, Indira Nagar, Thiruvanmiyur, Taramani Link Road, Nehru Nagar, Kandhanchavadi, Perungudi, Thoralpakkam, Mettukuppam, PTC Colony, Okkiyampet, Karapakkam, Okkiyam Thoralpakkam, Sholinganallur (interchange with Line-5), Sholinganallur Lake, Sri Ponniamman Temple, Sathyabama University, St Joseph College, Seemancheri, Gandhi Nagar, Nayalur, Siruseri, Sipcot 1 and Sipcot 2.
• Line-4 (shown in Navy Blue) – CMBT – Lighthouse (17.12 km) with 20 stations at Light House, Forehore Estate Road, Kutchery Road, Thirumayilai Metro (interchange with Line-3), Alwarpet, Bhararthidasan Road, Adyar Gate Junction, Nandanam (interchange with Line-1), Natesan Park, Panagal Park, Kodambakkam Metro, Meenakshi College, Power House, Vadapalani, Avichi School, Elango Nagar, Sai Nagar, Grain Market and CMBT (interchange with Line-2 and Line-5).
Note – A supplementary DPR for a 15 km extension of Line-4 to Poonamallee is currently being prepared, which will increase Phase 2’s route length to 123 km.
• Line-5 (shown in Red) – Madhavaram – Sholinganallur (44.66 km) with 46 stations at Madhavaram Milk Colony (interchange with Line-3), Venugopal Nagar, Assissi Nagar, Manjambakkam, Velmurugan Nagar, MMBT, Shastri Nagar, Terreri, Kolathur, Srinivasa Nagar, Villivakkam Metro, Villivakkam Bus Terminus, Nadhamuni, Anna Nagar Depot, Thirumangalam, Kendriya Vidyalaya Anna Nagar, Kallamman Koli Street, CMBT (interchange with Line-2, Line-4), Kannlamman Nagar, Nerkundram, Madhuravoyal, Ganga Nagar, Valasaravakkam, Alwarthirunagar, Suresh Nagar, Ramapuram, Sathya Nagar, Chennai Trade Centre, Butt Road, Alandur (interchange with Line-1 and Line-2), St Thomas Mount (interchange with Line-2), Adambakkam MRTS, Vanuvampet, Puzhuthivakkam, Madipakkam Koot Road, Kilkattalai, Echangadu, Kovilabakkam, Vellakkal, Medavakkam Koot Road, Medavakkam Junction, Perumbakkam, Global Hospitals, Elcot and Sholinganallur (interchange with Line-3).
Station Information
Also within the three DDC notices are the following tables which list out the approximate distance between each station, type (elevated versus underground) and their basic layout (island versus side platforms). Each and every figure can possibly change by the time detailed designs are prepared and civil construction bids are invited, but these can be taken as a good benchmark.
Note – the scope of the tender notices were restricted to an approximately 50 km portion of Line-3 and Line-5 covering 60 stations, so data is missing for the rest 44 stations spread across all 3 new lines.

Line-3 Station Info
• Underground: Mahavaram Milk Colony – Taramani Road Junction (approx. 25.718 km)
• Elevated – Taramani Road Junction – Sholinganallur Lake (approx. 10.571 km)
Line-5 Station Info
• Underground/At-Grade: Madhavaram Milk Colony – Venugopal Nagar (approx .87 km)
• Elevated: Venugopal Nagar – Shastri Nagar (approx 5.276 km)
• Underground: Shastri Nagar – CMBT (approx 10.039 km)
All elevated stations have been designed to be 140 meters long, and as such can accommodate a max of 6-coach trains. CMRL might be attempting to follow DMRC’s Phase 3 strategy of saving money by reducing station footprint and will make up for it by operating trains at a high frequency to maintain roughly the same passengers per hour per direction (pphpd) capacity as a system with 8-coach trains.
Phase 2’s Current Status
As stated earlier, Phase 2 has been estimated to cost Rs. 85,000 crore and its detailed project report (DPR) is currently being revised to conform with the new Metro Rail Policy of 2017 after which it’ll be placed before the central government’s cabinet for approval. RITES submitted their environmental impact assessment (EIA) report to the Japan International Cooperation Agency (JICA) in November 2017, but there’s still no clarity on whether they will provide another loan or not.

3 Public Posts - Mon Mar 12, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Dec 27
Trains with ARP 15 Dep on: Tue Jan 1
Trains with ARP 30 Dep on: Wed Jan 16
Trains with ARP 120 Dep on: Tue Apr 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4073462
    Dec 06 (12:50PM)


    There are some minor changes to the PNR Forum: 1. The main PNR feed will only show UN-predicted (by you) PNRs which are coming in. However, if there are replies, the PNR will show and will bubble to the top. Once you predict the PNR, it will go away from the main...
  • Entry# 4003283
    Nov 14 2018 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy