Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Thu Apr 26, 2018 17:10:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3196440
Posted: Mar 12 2018 (14:08)

3 Responses
Last Response: Mar 12 2018 (15:08)
  
Rail News
0 Followers
358 views
Other NewsCMRL/Chennai Metro  -  
Mar 12 2018 (14:04)   CMRL Publishes Official Phase 2 Map of Chennai Metro Project

16229🔹Mysuru↔️Varanasi Express🔹16230^~   2316 news posts
Entry# 3196440   News Entry# 331210         Tags   Past Edits
So last month, Chennai Metro Rail Ltd. (CMRL) published nine separate notices inviting bids from companies for the appointment of detailed design consultants (DDC) and geotechical engineering firms as part of the pre-construction activities for developing a 50 km portion of Chennai Metro’s new Line-3 and Line-5 under the 108 km Phase 2 project.
Within one of those notices, CMRL has published an official map of the project – the first to ever be released by the organization – which will comprise of 3 new lines with 104 stations
Here’s a list of
...
more...
all proposed stations. Note that these 3 lines provide interchange connectivity with not just one another but also with the 54 km Phase-1’s Line-1 (Airport – Wimco Nagar) & Line-2 (St. Thomas Mount – Central), something which will be unique to Chennai if these get built as-is.
• Line-3 (shown in Green) Madhavaram – SIPCOT (45.81 km) with 50 stations at Madhavaram Milk Colony (interchange with Line-5), Thapal Petti, Murari Hospitial, Moolakadai, Sembiyam, Perambur Market, Perambus Metro, Ayanavaram, Otteri, Pattalam, Perambur Barracks Road, Purasaiwakkam High Road, Kelley’s, KMC (interchange with Line-2), Chetpet Metro, Sterling Road Junction, Nungambakkam, Gemini, Thousand Lights (interchange with Line-1), Royapettah Govt Hospital, Radhakrishnan Salai Junction, Thirumayilai Metro (interchange with Line-4), Madaiveli, Greenways Road Metro, Adyar Junction, Adyar Depot, Indira Nagar, Thiruvanmiyur, Taramani Link Road, Nehru Nagar, Kandhanchavadi, Perungudi, Thoralpakkam, Mettukuppam, PTC Colony, Okkiyampet, Karapakkam, Okkiyam Thoralpakkam, Sholinganallur (interchange with Line-5), Sholinganallur Lake, Sri Ponniamman Temple, Sathyabama University, St Joseph College, Seemancheri, Gandhi Nagar, Nayalur, Siruseri, Sipcot 1 and Sipcot 2.
• Line-4 (shown in Navy Blue) – CMBT – Lighthouse (17.12 km) with 20 stations at Light House, Forehore Estate Road, Kutchery Road, Thirumayilai Metro (interchange with Line-3), Alwarpet, Bhararthidasan Road, Adyar Gate Junction, Nandanam (interchange with Line-1), Natesan Park, Panagal Park, Kodambakkam Metro, Meenakshi College, Power House, Vadapalani, Avichi School, Elango Nagar, Sai Nagar, Grain Market and CMBT (interchange with Line-2 and Line-5).
Note – A supplementary DPR for a 15 km extension of Line-4 to Poonamallee is currently being prepared, which will increase Phase 2’s route length to 123 km.
• Line-5 (shown in Red) – Madhavaram – Sholinganallur (44.66 km) with 46 stations at Madhavaram Milk Colony (interchange with Line-3), Venugopal Nagar, Assissi Nagar, Manjambakkam, Velmurugan Nagar, MMBT, Shastri Nagar, Terreri, Kolathur, Srinivasa Nagar, Villivakkam Metro, Villivakkam Bus Terminus, Nadhamuni, Anna Nagar Depot, Thirumangalam, Kendriya Vidyalaya Anna Nagar, Kallamman Koli Street, CMBT (interchange with Line-2, Line-4), Kannlamman Nagar, Nerkundram, Madhuravoyal, Ganga Nagar, Valasaravakkam, Alwarthirunagar, Suresh Nagar, Ramapuram, Sathya Nagar, Chennai Trade Centre, Butt Road, Alandur (interchange with Line-1 and Line-2), St Thomas Mount (interchange with Line-2), Adambakkam MRTS, Vanuvampet, Puzhuthivakkam, Madipakkam Koot Road, Kilkattalai, Echangadu, Kovilabakkam, Vellakkal, Medavakkam Koot Road, Medavakkam Junction, Perumbakkam, Global Hospitals, Elcot and Sholinganallur (interchange with Line-3).
Station Information
Also within the three DDC notices are the following tables which list out the approximate distance between each station, type (elevated versus underground) and their basic layout (island versus side platforms). Each and every figure can possibly change by the time detailed designs are prepared and civil construction bids are invited, but these can be taken as a good benchmark.
Note – the scope of the tender notices were restricted to an approximately 50 km portion of Line-3 and Line-5 covering 60 stations, so data is missing for the rest 44 stations spread across all 3 new lines.

Line-3 Station Info
• Underground: Mahavaram Milk Colony – Taramani Road Junction (approx. 25.718 km)
• Elevated – Taramani Road Junction – Sholinganallur Lake (approx. 10.571 km)
Line-5 Station Info
• Underground/At-Grade: Madhavaram Milk Colony – Venugopal Nagar (approx .87 km)
• Elevated: Venugopal Nagar – Shastri Nagar (approx 5.276 km)
• Underground: Shastri Nagar – CMBT (approx 10.039 km)
All elevated stations have been designed to be 140 meters long, and as such can accommodate a max of 6-coach trains. CMRL might be attempting to follow DMRC’s Phase 3 strategy of saving money by reducing station footprint and will make up for it by operating trains at a high frequency to maintain roughly the same passengers per hour per direction (pphpd) capacity as a system with 8-coach trains.
Phase 2’s Current Status
As stated earlier, Phase 2 has been estimated to cost Rs. 85,000 crore and its detailed project report (DPR) is currently being revised to conform with the new Metro Rail Policy of 2017 after which it’ll be placed before the central government’s cabinet for approval. RITES submitted their environmental impact assessment (EIA) report to the Japan International Cooperation Agency (JICA) in November 2017, but there’s still no clarity on whether they will provide another loan or not.

  
1600 views
Mar 12 2018 (14:08)
16229🔹Mysuru↔️Varanasi Express🔹16230^~   4039 blog posts   17 correct pred (94% accurate)
Re# 3196440-1            Tags   Past Edits
Chennai Metro Phase 2 map and Line - 3 & Line - 5 station Info
Source: click here

  
1250 views
Mar 12 2018 (15:07)
BDCR KOVVUR New Line~   176 blog posts   7386 correct pred (69% accurate)
Re# 3196440-3            Tags   Past Edits
good move.. But not sure when it will get into reality.. Still metro from Guidy to Central is waiting to be opened..

  
1229 views
Mar 12 2018 (15:08)
Trip to Rameshwaram on Boat Mail on 28th~   2085 blog posts   765 correct pred (54% accurate)
Re# 3196440-4            Tags   Past Edits
Metro has 2 be finished soon and not delayed thus preventing traffic jams which are prevalent in areas of chennai where metro construction is going on.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun May 6
Trains with ARP 15 Dep on: Fri May 11
Trains with ARP 30 Dep on: Sat May 26
Trains with ARP 120 Dep on: Fri Aug 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.