Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Thu Jan 24 00:02:47 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3199499
Posted: Mar 13 2018 (14:55)

2 Responses
Last Response: Mar 13 2018 (15:00)
  
Rail News
0 Followers
2935 views
Other News
SWR/South Western
Mar 13 2018 (13:33)   Electric trains to Mysuru may not chug for now

16591🔹Hampi Express🔹16592^~   3048 news posts
Entry# 3199499   News Entry# 331310         Tags   Past Edits
It has been nearly a month since Prime Minister Narendra Modi inaugurated the electrification works of Bengaluru-Mysuru double line. But, railways will not be able to run electric trains for at least six months, thanks to delay in power supply.
The state government and the railways spent Rs 218 crore for electrification work. However, the Yeliyur sub-station, which has to supply power to half of the 138-km line in Mysuru and Mandya section, is yet to be connected to the Karnataka Power Transmission Corporation Limited's (KPTCL) power grid. "Railway officials came to us in January seeking power to Yeliyur sub-station with a peak load of 5000 kVA. Tenders for drawing lines from Tubinakere Industrial Area to the sub-station have been finalised and
...
more...
the letter of intent (LoI) will be given to the contractor within a day or two," KPTCL MD Jawaid Akhtar told DH.
Sources in the Railways said they initially planned to carry out the work themselves before approaching KPTCL. An official said the industrial area is situated nearly 3 km away from Yeliyur sub-station and the powerline has to go through agriculture fields.
"There were several issues with farmers, which have been settled recently. We believe that the work will be completed within six months after the contractor gets LoI," the official said. The South Western Railway, which had plans to replace diesel locomotives with electric ones for at least six trains by the first quarter of 2018, has now put off the plans. At present, only Shatabdi Express (Daily), Darbhanga (Weekly) and Chennai-Mysuru Weekly Express, run with electric locomotive as powering trains from Bidadi sub-station, resulting in high wastage.
A conventional locomotive requires about 700 litres of diesel for one-way trip between Mysuru and Bengaluru, the route that sees an average of 22 trains running in each direction. Railways believes that electrification will reduce annual consumption by
1.2 crore litres, at a time when it procures the fuel by paying Rs 57.20 per litre. Conversion of all the trains is expected to save Rs 20 crore annually.
Railway activist T P Lokesh said the delay shows the lack of planning on the part of railways. "For a work executed over the last two years, electrification is poorly planned. It shows the negligence of railway officials. How can they declare work as completed when a sub-station is not connected to the grid," he asked.

2 Public Posts - Tue Mar 13, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Feb 3
Trains with ARP 15 Dep on: Fri Feb 8
Trains with ARP 30 Dep on: Sat Feb 23
Trains with ARP 120 Dep on: Fri May 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4205675
    Yesterday (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
  • Entry# 4188821
    Jan 06 (02:19AM)


    @all: At this time, the PNR Forum is functioning again, albeit at a greatly reduced volume and efficiency. Refreshing PNRs is a very cumbersome affair. We may expect this to end as well, eventually, as the Govt. tightens these controls further. At IRI, we CANNOT waste any more time on this fruitless...
  • Entry# 4187635
    Jan 05 (01:47AM)


    The following changes are being introduced to keep the PNR Forum functioning. . 1. A "bookmarklet" called "PNR Refresh" has been created. Just Copy/Paste a small piece of text into your browser bookmarks. The bookmarklet will be available by morning. . 2. When you click on Post/Update/Refresh PNR, you will be taken to the Official...
  • Entry# 4180488
    Jan 02 (11:57AM)


    @all: The PNR Forum as we know it is OVER. The official website has unilaterally decided to thoroughly block and shut down all access to PNR info. We had put in MANY, many years of PAINSTAKING effort to develop the PNR Prediction infrastructure, and our Sr. Legendary Members have helped countless people...
  • Entry# 4135478
    Dec 22 2018 (12:58PM)


    Starting Monday, we shall be starting the slow Test rollout of our new app - called RailFan. . What is RailFan? It is expected that RailFan will be the future of the IRI site for mobile phones. A full dedicated offline-capable messaging/blogging app, encompassing all the features of the IRI site. The RailFan app...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy