Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Apr 25, 2018 04:11:00 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3204918
Posted: Mar 15 2018 (10:27)

3 Responses
Last Response: Mar 15 2018 (14:36)
  
Rail News
0 Followers
345 views
New Facilities/Technology
Mar 15 2018 (10:26)   Alstom Completes Most Powerful All-Electric “Make In India” Locomotive And Announces Contract Wins Worth €75 million In India

karbang~   554 news posts
Entry# 3204918   News Entry# 331449         Tags   Past Edits
Alstom has announced the on schedule completion of its first all-electric locomotive from its state-of-the-art locomotive facility at Madhepura in the State of Bihar. In line with the Indian government’s target towards 100% electrification and sustainable mobility, these new locomotives will not only bring down operating costs for the national rail operator, but will significantly cut down greenhouse gas emissions as well.
This first locomotive is part of a €3.5 billion order comprising 800 electric double-section locomotives signed in 2015, which contributes to the Ministry of Railways’ public-private partnership programme to modernise the country’s rail infrastructure. This agreement remains the largest Foreign Direct Investment in the railways sector to date and has a strategic role in creating a multiplier effect on the
...
more...
economy. This contract is also one of the biggest contracts in the history of Alstom.
“Our operations in India are paramount to our business globally and we continue to stay committed to developing India’s infrastructure needs, improving the quality of services to citizens and investing in the nation’s economy,” said Henri-Poupart Lafarge, Chairman and CEO, Alstom.
Commenting further on the completion of the first electric locomotive, he added, “This project stands as a shining example of Alstom’s commitment to ‘Make in India’. Apart from creating thousands of jobs directly and indirectly, we have created a strong localised supply chain for this project, with 90% of the components for the prototype sourced locally.”
Thanks to its 12,000 horsepower, each double section locomotive, part of Alstom’s Prima locomotives family, has a hauling capacity of 6,000 tonnes and speed of 120km/h, allowing faster and safer movement of heavier freight trains across the country, thereby reducing congestion for passenger train services and freight. Equipped with IGBT based propulsion technology, these locomotives will be compliant with Indian standards of freight transport and will have the ability to endure tough Indian climate and conditions.
The locomotives were developed with the support of 6 Alstom sites in France: Belfort for the 6 first car bodyshells, and Ornans for the motors, Tarbes for the traction, Le Creusot for bogies, Villeurbanne for the train control monitoring systems and Saint-Ouen for the design.
In another significant development, Alstom also announced three new contracts worth approximately €75 million – a power supply contract from the Mumbai Metro Rail Corporation Ltd (MMRCL), a contract for new train sets from Chennai Metro Rail Corporation and another power supply contract from Jaipur Metro Rail Corporation. This development shows Alstom’s growing footprint in the country, in both the urban space as well as the mainline space.
Additionally, phase 1 in the construction of the electric locomotive facility at Madhepura and the depot at Saharanpur is complete and work is progressing as per the contractual timelines. To give skilling and local hiring an impetus, focused efforts towards nurturing young minds in communities in and around Madhepura have been initiated. With the help of local NGOs, Alstom Foundation is working to foster better health care, education and dignified livelihood in the area.

  
1141 views
Mar 15 2018 (10:27)
karbang~   322 blog posts   3 correct pred (75% accurate)
Re# 3204918-1            Tags   Past Edits
1 compliments
Beautiful

  
1001 views
Mar 15 2018 (10:49)
karbang~   322 blog posts   3 correct pred (75% accurate)
Re# 3204918-2            Tags   Past Edits
Yes it is!!
Very Beautiful

  
651 views
Mar 15 2018 (14:36)
DhnEcr~   6355 blog posts
Re# 3204918-3            Tags   Past Edits
Beautiful

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat May 5
Trains with ARP 15 Dep on: Thu May 10
Trains with ARP 30 Dep on: Fri May 25
Trains with ARP 120 Dep on: Thu Aug 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.