Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Apr 25, 2018 00:10:55 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3207556
Posted: Mar 16 2018 (00:55)

20 Responses
Last Response: Mar 19 2018 (15:26)
  
General Travel
0 Followers
2110 views
Mar 16 2018 (00:55)   16535/Gol Gumbaz Express | NGR/Annigeri (2 PFs)

16229🔹Mysuru↔️Varanasi Express🔹16230^~   3991 blog posts   17 correct pred (94% accurate)
Entry# 3207556            Tags   Past Edits
Regulation / Rescheduling of trains for line doubling works.
Source: click here

12 posts - Fri Mar 16, 2018

3 posts - Sat Mar 17, 2018

  
879 views
Mar 17 2018 (13:16)
Aarya❤Feel My Love❤DSP~   3385 blog posts   281 correct pred (53% accurate)
Re# 3207556-16            Tags   Past Edits
No they will decide target once after completing this 42km all Line joining,S & T works and etc but Other stretches between HG-GDG Earth works going in good way. Mainily the Bridge works which are delay factors for this doubling they constructing almost all small and big bridges here and their i think they divided sections for earth works so in full section thier are earth works going like bedding bridges construction RUB & ROB works etc.. Thier only first target is to Make Hotgi-Kudagi fully doubled as soon as possible for which NTPC pressuring SWR for that.. After that section between Kudagi-Gadag dont know what pace they carry out but from their immediate starting of bridge construction works between kudagi-Gadag Section showing tht they Want this section also to be doubled as soon as possible so that their empty coal freights can pass on to SCR via GDG-GTL route as...
more...
making hotgi-Kudagi as just incoming path for plant with loaded coal..

  
757 views
Mar 17 2018 (15:14)
Aarya❤Feel My Love❤DSP~   3385 blog posts   281 correct pred (53% accurate)
Re# 3207556-17            Tags   Past Edits
42.5km Maga.. 0.5km also useful ha ha.lol 0.5km line join not took place means it will uncomplete na..

  
723 views
Mar 17 2018 (15:29)
x-under SW-x   1901 blog posts
Re# 3207556-18            Tags   Past Edits
Let it be. I am just discussing with that member Chaitanya. This is not some official minutes of meeting, is it :P

  
716 views
Mar 17 2018 (15:34)
Aarya❤Feel My Love❤DSP~   3385 blog posts   281 correct pred (53% accurate)
Re# 3207556-19            Tags   Past Edits
ha ha.. Lol.. so do u saw Deepak message where he mentioned 500m left some where outer of Munirabad fr doubling so this is the case here if we omit 0.5km ha ha..

  
516 views
Mar 19 2018 (15:26)
abhi1000~   215 blog posts
Re# 3207556-20            Tags   Past Edits
At which station was this regulated on 16th March? This halted for about 80-85 mins at Nayandahalli station. Arrived at about 6:20 and departed at 7:45!!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat May 5
Trains with ARP 15 Dep on: Thu May 10
Trains with ARP 30 Dep on: Fri May 25
Trains with ARP 120 Dep on: Thu Aug 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.