Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sat Nov 17 03:45:40 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3241217
Posted: Mar 27 (08:58)

1 Responses
Last Response: Mar 27 (08:58)
  
Rail News
0 Followers
305 views
Commentary/Human Interest
SWR/South Western
Mar 27 (03:45)   Ministry of Railways Sanctions Quadrupling Works in Bengaluru Area for enhancement of Suburban and other Railway Traffic to ease congestion

rdb*^   133339 news posts
Entry# 3241217   News Entry# 332671         Tags   Past Edits
Two additional lines between Bengaluru and Whitefield will benefit 62,000 daily commuters in the IT hub area Ministry of Railways has sanctioned works to the tune of nearly Rs.1500 crores for line capacity expansion works in and around Bengaluru area
Keeping in view the requirements of augmenting line capacity, specially to meet the requirements of suburban traffic, Ministry of Railways has sanctioned the Quadrupling Project, with a provision of 02 additional lines (one on either side of the existing 02 lines) from Bengaluru Cantt. to Whitefield at a cost of Rs.492.87 crores.
As
...
more...
a measure to ease the congestion, it has been decided to strengthen the busy section with two additional lines between Bengaluru and Whitefield. This stretch of 25 Km will involve 6 most important stations -Bengaluru Cantonment, Bengaluru East, Baiyyapannahalli, Krishnarajapuram, Hoodi and Whitefield. This will benefit 62,000 daily commuters in this section by making commuting within Bengaluru easy and faster.
The Project will be taken up immediately and planned to be completed within a period of 2 – 3 years. It will be a boon for the local public of Bengaluru, specially belonging to the IT hub of Whitefield area. Presently, 146 and 94 trains are running from Bengaluru and Yesvantpur stations respectively out of which 122 are of suburban nature catering to commuters.
A major portion of these suburban trains are running in Bengaluru-Whitefield section. In view of increasing commuter requirement, in last one and half year itself, 26 suburban services have been introduced along with 7 long distance trains in Bengaluru area. Recently also, 4 suburban services between KSR Bengaluru- Baiyyappanahalli and Baiyappanahalli- Bengaluru have been introduced. KSR Bengaluru- Whitefield railway line is now congested and it’s line capacity utilization has exceeded 100%.

The project of Quadrupling between Bengaluru – Whitefield had been sanctioned during 1997-98 but was pending due to issues of land cost / availability, etc. Though MoUD subsequently recommended for Transit Oriented Development (TOD) of Krishnarajapuram and Whitefield stations involving extension of Bengaluru Metro, it had been decided to drop the quadrupling project considering its non-viability.
OTHER WORKS :-

In addition to the above, Ministry of Railways have, in the Budget 2018-19, sanctioned the following Doubling works around Bengaluru area which will serve to augment the line capacity in the Sections for running additional train services including suburban trains :
Doubling of track between Yesvantpur – Baiyyappanahalli – Channasandra (21.70 km.) at a cost of Rs.169.64 crores.
Doubling of track between Baiyyappanahalli – Hosur (48 km.) at a cost of Rs.375.66 crores.
An amount of Rs.15 crores approx. has also been sanctioned for de-bottlenecking works in the highly congested Bengaluru station to facilitate introduction of more services.
The above are in addition to the recently completed works viz. Doubling with Electrification of Yesvantpur – Yelahanka and Yelahanka – Channasandra sections at a cost of Rs.250 crores approx. and the major on-going work for development of new Coaching Terminal at Baiyyappanahalli at a cost of Rs.152 crores to de-congest the existing Terminals at Bengaluru and Yesvantpur.
Thus, Ministry of Railways has sanctioned works to the tune of nearly Rs.1500 crores for line capacity expansion works in and around Bengaluru area over the last 2-3 years which will go a long way in enabling running of additional trains including suburban trains.
These works have been sanctioned by Ministry of Railways at its own cost without waiting for their proposal on cost sharing basis with the State Government. Moreover, these works are in addition to the proposed Project of Suburban Railway System (including elevated corridors) for Bengaluru area at a total cost of Rs.17,000 crores approx. on Joint Venture basis with Government of Karnataka (announced in Budget 2018-19) for which discussions are already in progress.
***
SBS/MKV/ENS
(Release ID :177794)

1 Public Posts - Tue Mar 27, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Nov 27
Trains with ARP 15 Dep on: Sun Dec 2
Trains with ARP 30 Dep on: Mon Dec 17
Trains with ARP 120 Dep on: Sun Mar 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4003283
    Nov 14 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy