Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sun Dec 16 11:19:47 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3270947
Posted: Apr 05 (04:49)

13 Responses
Last Response: Apr 09 (21:27)
  
General Travel
1 Followers
3653 views
★★
Apr 05 (04:49)   BGP/Bhagalpur Junction (6 PFs)

RFJayant~   1516 blog posts   24 correct pred (56% accurate)
Entry# 3270947            Tags   Past Edits
Good news for railfans of sahibganj loop:
1.)Electrification work just after passing of budget in feburary till pirpaithi,within few months the work has come till nathnager outer the work of digging holes and cementing has been completed till nathnager outer,so electrification dosen't seem too far from bhagalpur now,poles are not set,but there are no holes and poles from jmp outer to tunnel but just after tunnel till just before ratanpur station poles has been set.
by 2019 it is certain electrification will be completed till bhagalpur.
2.)The
...
more...
RObridge just outside jamalpur station going at very slow pace,what i saw back in January seems nothing changed till now.
3.)Within a few months between line to bhagalpur and y line the soil was level-led then 3 tracks were laid there were now goods trains unload.
4.)Tunnel approach road track has also been laid till very close to spot where the tunnel will be made tunnel is made on right side,when we go from jmp to bgp.
5.)Biggest development in respect of electrification between jamalpur and kiul is that poles has has been fixed now and substation are 75% ready with structure completed only transformer and wires are pending,ohe work has not begun at any place yet.
6.)One rack of 22 coaches 2017 made other than 8 lhb spare coaches is ready placed in bhagalpur yard,maybe soon 12335 may be lhbfied.
7.)For completing of doubling between bhagalpur and kahalgaon efforts are being made at bhagalpur station new sleepers has been laid after creating space and over bholanathpul small bridge is made between previous 2 bridge.

6 Public Posts - Thu Apr 05, 2018

2 Public Posts - Fri Apr 06, 2018

5 Public Posts - Mon Apr 09, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Dec 26
Trains with ARP 15 Dep on: Mon Dec 31
Trains with ARP 30 Dep on: Tue Jan 15
Trains with ARP 120 Dep on: Mon Apr 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4073462
    Dec 06 (12:50PM)


    There are some minor changes to the PNR Forum: 1. The main PNR feed will only show UN-predicted (by you) PNRs which are coming in. However, if there are replies, the PNR will show and will bubble to the top. Once you predict the PNR, it will go away from the main...
  • Entry# 4003283
    Nov 14 2018 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy