Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Thu Jan 17 14:27:58 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3456367
Posted: May 27 2018 (02:17)

No Responses Yet
  
Rail News
0 Followers
830 views
SR/Southern
May 27 2018 (02:17)   Electronic parking at rly station soon

Jayashree ❖ Amita*^   42388 news posts
Entry# 3456367   News Entry# 338453         Tags   Past Edits
Coimbatore: In an effort to address the complaints from rail passengers about fleecing of parking lot contractors at the city railway station, authorities are planning to start work to set up an electronic parking system from today. Rs 4.75lakh has been allotted for the project, an official said.
The parking lot, that will accommodate 15 cars, will have the entrance near the post office. The entrance will split into two - one for parking cars and the other for vehicles that drop passengers and leave the station.
“Due to space constraints, we are
...
more...
coming up with a separate bay where taxis, auto rickshaws and cars can enter and drop passengers,” said a senior railway official. Another four bays will be set up exclusively for VIPs and differently-abled passengers, he added.
The entrance to the parking lot will be fitted with a ticket vending machine and an electronic boom barrier. Vehicles entering for parking will have to get tickets that will have bar code. Vehicles that enter for dropping passengers will not be charged or stopped.
The machine will be integrated with an application so that senior railway officials can monitor the contractors. At the exit gate, there will be a booth with an employee, who will scan the bar code and collect parking fee. “We decided to adopt the same system used in malls and airports,” said an official.
The entire installation cost is estimated at Rs 4.75 lakh and the work will be completed within a week. “Since the capacity is less, the parking fee will be higher. We are yet to fix the rates,” he said.
Vehicles can be parked only for 12 hours. Those who want to use it for more hours will be charged on an hourly basis.
Officials said that work on the multi-level parking system near the back entrance of the railway station will be completed within six months. “Once that is completed, the two-wheeler parking lot in the front entrance will be shifted there, making more space for cars,” said an official.
The multi-level parking system will have four floors - one underground for just cars, one ground floor for office space and two floors for two-wheeler parking. It will be fully automated and will accommodate at least 500 two-wheelers.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 27
Trains with ARP 15 Dep on: Fri Feb 1
Trains with ARP 30 Dep on: Sat Feb 16
Trains with ARP 120 Dep on: Fri May 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4188821
    Jan 06 (02:19AM)


    @all: At this time, the PNR Forum is functioning again, albeit at a greatly reduced volume and efficiency. Refreshing PNRs is a very cumbersome affair. We may expect this to end as well, eventually, as the Govt. tightens these controls further. At IRI, we CANNOT waste any more time on this fruitless...
  • Entry# 4187635
    Jan 05 (01:47AM)


    The following changes are being introduced to keep the PNR Forum functioning. . 1. A "bookmarklet" called "PNR Refresh" has been created. Just Copy/Paste a small piece of text into your browser bookmarks. The bookmarklet will be available by morning. . 2. When you click on Post/Update/Refresh PNR, you will be taken to the Official...
  • Entry# 4180488
    Jan 02 (11:57AM)


    @all: The PNR Forum as we know it is OVER. The official website has unilaterally decided to thoroughly block and shut down all access to PNR info. We had put in MANY, many years of PAINSTAKING effort to develop the PNR Prediction infrastructure, and our Sr. Legendary Members have helped countless people...
  • Entry# 4135478
    Dec 22 (12:58PM)


    Starting Monday, we shall be starting the slow Test rollout of our new app - called RailFan. . What is RailFan? It is expected that RailFan will be the future of the IRI site for mobile phones. A full dedicated offline-capable messaging/blogging app, encompassing all the features of the IRI site. The RailFan app...
  • Entry# 4073462
    Dec 06 2018 (12:50PM)


    There are some minor changes to the PNR Forum: 1. The main PNR feed will only show UN-predicted (by you) PNRs which are coming in. However, if there are replies, the PNR will show and will bubble to the top. Once you predict the PNR, it will go away from the main...
  • Entry# 4003283
    Nov 14 2018 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy