Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Jan 16 14:20:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3558965
Posted: Jun 21 2018 (22:49)

1 Responses
Last Response: Jun 21 2018 (22:50)
  
Rail News
0 Followers
515 views
New Facilities/Technology
NR/Northern
Jun 21 2018 (22:49)   Delhi: New bridge proposed over the Yamuna to ease congestion, improve travel time

a2z~   12807 news posts
Entry# 3558965   News Entry# 342303         Tags   Past Edits
The Indian Railways is planning to introduce a third bridge along the Ghaziabad-New Delhi corridor. Meanwhile, construction for the new rail bridge replacing the old Lohe-ka-Pul over Yamuna river is expected to be completed by March 2019.
As part of its expansion plans for the Ghaziabad-New Delhi rail corridor, the Indian Railways has proposed building a third bridge over the river in the capital. The bridge is planned near the Nizamuddin rail bridge and is expected to help speed up the transit of trains in the highly congested rail corridor.
"The hydraulic study
...
more...
for the proposed new rail bridge is underway and we are expecting the construction to start by year-end," a senior Railway Ministry official told IANS.
So far, there has been no word on the fate of more than 2,000 kikar trees that might face the axe due to the new bridge.
The proposed bridge would be 600 meters long and comes at a cost of approximately Rs 425 crore. It will allow the transit of trains at over 100 km per hour, a drastic upgrade from the 20-30 km per hour that the old Yamuna rail bridge, Lohe-ka-Pul allows.
Lohe-ka-Pul dates back to the British Raj in India and is over 150 years old. It gets affected by floods which slows down the movement of trains. Moreover, if the Yamuna water level touches the danger mark, the traffic is barred on the bridge. But not for long.
Lohe-ka-Pul will give way to another new double-line rail bridge that will be weather-proof. In the project that is currently underway, the 800-meter long double bridge costs an estimated Rs 200 crore. With the current work on in full steam, it is due to become operational in March 2019.
With the upcoming new project, the all-weather bridge, "train movement would not be affected even in a flood situation", said the official.
While the rail bridge on Lohe-ka-Pul is being discarded, the road running along the 150-year-old bridge will remain operational. Its maintenance will be overseen by the Delhi government after Northern Railways hands it over when the double-line bridge opens.
Currently, the transit of trains between Ghaziabad and New Delhi station takes over an hour - sometimes even two hours - due to over-congestion on the route, causing much inconvenience to passengers. There has been a demand to ensure an additional path for Delhi-bound trains to improve the commute.

1 Public Posts - Thu Jun 21, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jan 26
Trains with ARP 15 Dep on: Thu Jan 31
Trains with ARP 30 Dep on: Fri Feb 15
Trains with ARP 120 Dep on: Thu May 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4188821
    Jan 06 (02:19AM)


    @all: At this time, the PNR Forum is functioning again, albeit at a greatly reduced volume and efficiency. Refreshing PNRs is a very cumbersome affair. We may expect this to end as well, eventually, as the Govt. tightens these controls further. At IRI, we CANNOT waste any more time on this fruitless...
  • Entry# 4187635
    Jan 05 (01:47AM)


    The following changes are being introduced to keep the PNR Forum functioning. . 1. A "bookmarklet" called "PNR Refresh" has been created. Just Copy/Paste a small piece of text into your browser bookmarks. The bookmarklet will be available by morning. . 2. When you click on Post/Update/Refresh PNR, you will be taken to the Official...
  • Entry# 4180488
    Jan 02 (11:57AM)


    @all: The PNR Forum as we know it is OVER. The official website has unilaterally decided to thoroughly block and shut down all access to PNR info. We had put in MANY, many years of PAINSTAKING effort to develop the PNR Prediction infrastructure, and our Sr. Legendary Members have helped countless people...
  • Entry# 4135478
    Dec 22 (12:58PM)


    Starting Monday, we shall be starting the slow Test rollout of our new app - called RailFan. . What is RailFan? It is expected that RailFan will be the future of the IRI site for mobile phones. A full dedicated offline-capable messaging/blogging app, encompassing all the features of the IRI site. The RailFan app...
  • Entry# 4073462
    Dec 06 2018 (12:50PM)


    There are some minor changes to the PNR Forum: 1. The main PNR feed will only show UN-predicted (by you) PNRs which are coming in. However, if there are replies, the PNR will show and will bubble to the top. Once you predict the PNR, it will go away from the main...
  • Entry# 4003283
    Nov 14 2018 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy