Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Thu Jan 24 03:59:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3560833
Posted: Jun 22 2018 (13:31)

No Responses Yet
  
Rail News
0 Followers
1357 views
New Facilities/Technology
ML/Mumbai Local
Jun 22 2018 (13:31)   5th, 6th lines between Thane-Diva: MRVC seeks forest department nod to construct flyover

a2z~   12807 news posts
Entry# 3560833   News Entry# 342398         Tags   Past Edits
Building the flyover will involve cutting mangroves near Mumbra station
Under pressure to complete the laying of fifth and sixth rail lines between Thane and Diva by the March 2019 deadline, the Mumbai Railway Vikas Corporation (MRVC) has undertaken fresh efforts to speed up the process for getting permission from the forest department for constructing a flyover, by cutting mangroves near Mumbra station.
Acting on the railway board chairman Ashwani Lohani’s directive to complete the project by the set deadline during his Mumbai visit earlier this week, the MRVC has written to the
...
more...
forest department for permission to build a flyover in the area under mangrove cover. “We have started perusing the issue with the forest department freshly,” said a senior MRVC official.
MRVC officials said they have written to the Nagpur-based office of state forest department for permission. On the basis of their reply, the high court will grant permission for cutting mangroves to pave way for the 400 metre-long flyover.
Originally, the MRVC had planned to construct tunnels cutting Parsik hill adjacent to the existing tunnels on slow corridors, but due to some technical reasons, the authorities were forced to replace it with a flyover, for which cutting of mangroves is necessary.
According to MRVC officials, it will take at least six months to build the new flyover after getting the permission.
The project for laying fifth and sixth rail lines between Thane and Diva, which was sanctioned in 2008, is a part of Mumbai Urban Transport Project (MUTP 2B). The project will help the railways segregate outstation and suburban train operation between Kurla and Kalyan stations, by removing the bottleneck. Six lines already exist between Kurla-Thane and Diva-Kalyan.
The new lines will be parallel to the slow line between Thane and Diva. Once completed, these lines will be used for fast locals, whereas existing lines passing through Parsik tunnel will be used exclusively for outstation trains, the late arrival of which often affect the punctuality of locals.
The lines between Thane and Diva are being constructed by the MRVC and have a deadline of March 2019. The initial cost of the project was stated to be at ₹130 crore. However, the present cost is nearly ₹420 crore.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Feb 3
Trains with ARP 15 Dep on: Fri Feb 8
Trains with ARP 30 Dep on: Sat Feb 23
Trains with ARP 120 Dep on: Fri May 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4205675
    Yesterday (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
  • Entry# 4188821
    Jan 06 (02:19AM)


    @all: At this time, the PNR Forum is functioning again, albeit at a greatly reduced volume and efficiency. Refreshing PNRs is a very cumbersome affair. We may expect this to end as well, eventually, as the Govt. tightens these controls further. At IRI, we CANNOT waste any more time on this fruitless...
  • Entry# 4187635
    Jan 05 (01:47AM)


    The following changes are being introduced to keep the PNR Forum functioning. . 1. A "bookmarklet" called "PNR Refresh" has been created. Just Copy/Paste a small piece of text into your browser bookmarks. The bookmarklet will be available by morning. . 2. When you click on Post/Update/Refresh PNR, you will be taken to the Official...
  • Entry# 4180488
    Jan 02 (11:57AM)


    @all: The PNR Forum as we know it is OVER. The official website has unilaterally decided to thoroughly block and shut down all access to PNR info. We had put in MANY, many years of PAINSTAKING effort to develop the PNR Prediction infrastructure, and our Sr. Legendary Members have helped countless people...
  • Entry# 4135478
    Dec 22 2018 (12:58PM)


    Starting Monday, we shall be starting the slow Test rollout of our new app - called RailFan. . What is RailFan? It is expected that RailFan will be the future of the IRI site for mobile phones. A full dedicated offline-capable messaging/blogging app, encompassing all the features of the IRI site. The RailFan app...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy