Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Nov 16 13:39:16 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3561673
Posted: Jun 22 (16:47)

No Responses Yet
  
Rail News
0 Followers
2255 views
Other News
JMRC/Jaipur Metro
Jun 22 (16:47)   Jaipur Metro Phase 2 - revised plan being considered - to be increased by 8 kms upto VKI

Fox belly coffee roasters~   5 news posts
Entry# 3561673   News Entry# 342441         Tags   Past Edits
JAIPUR: As the city’s arterial route ‘Tonk Road’ continues to face unprecedented traffic chaos, French firm EGIS Rail SA that recently conducted a traffic study of the city has recommend to extend the proposed Jaipur Metro Phase- II corridor by nearly 8 kilometres.
As per the new proposal, the total length of the corridor will be 31km proposed from Sitapura to Vishwakarma Industrial Area, road number-14.
In the existing detailed project report (DPR), the corridor length is 23 km (Sitapura to Ambabari). However, after witnessing the increase in vehicular congestion on the route,
...
more...
the firm has proposed an increase in length of the corridor.
A senior official at UDH said, “We are working to draft a master plan of Jaipur Metro. Even if the construction work is taken up in phases, a systematic study would be beneficial for future planning of the project.”
Since conceptual stage, the Jaipur Metro Phase II has witnessed many alterations in its DPR. The JMRC prepared its first DPR in 2011 during the Congress government’s tenure. The then government intended to link phase-II with the Sanganer airport and other important government buildings on the route.
Following this, the Delhi Metro Rail Corporation (DMRC) submitted its revised DPR in 2014 and proposed an underground Metro station at airport near terminal-2.
In the proposal, it was mentioned that the train will run underground till Jawahar Circle after which elevated tracks will be constructed till Sindhi Camp bus stand. The elevated tracks will cross the bus stand and an underground corridor will be constructed after that till Panipech via Collectorate.
In the 2014 DPR, the DMRC had proposed 10-km underground and 14-km elevated corridor. This has increased the cost of the project as DMRC estimated nearly Rs 10,000 crore to construct nearly 24-kmlong corridor. If there is revision in plan in 2018, the number of stations on 31-km route would increase to 24 from 20.
Sources said, “The cost after three years is expected to increase by 40% due to rise in construction cost. However, the actual cost will be learnt from the DPR which is expected to be submitted by the firm on August 3. The traffic study and recommendations have also been forwarded to stakeholders for approval and comments.”

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Nov 26
Trains with ARP 15 Dep on: Sat Dec 1
Trains with ARP 30 Dep on: Sun Dec 16
Trains with ARP 120 Dep on: Sat Mar 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4003283
    Nov 14 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy