Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

Uttarbanga Exp: উত্তরের আত্মার আত্মীয় - Avinaba Bose

Full Site Search
  Full Site Search  
 
Thu Feb 21 00:52:35 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3708336
Posted: Aug 13 2018 (14:49)

No Responses Yet
  
Rail News
0 Followers
814 views
New Facilities/Technology
MMOPL/Mumbai Metro
Aug 13 2018 (14:49)   Work on Mumbai’s Metro-6 corridor to kick off by December

a2z~   12807 news posts
Entry# 3708336   News Entry# 350774         Tags   Past Edits
The construction of Metro-6 may result in the barricading of the Jogeshwari-Vikhroli Link Road, leading to more traffic jams.
The construction of the Lokhandwala-Jogeshwari-Kanjurmarg (Metro-6) corridor will start by the end of the year.
The 14.47-km corridor will be the city’s second east-west connecting Metroline after the Versova-Andheri-Ghatkopar Metro one corridor. The Delhi Metro Rail Corporation (DMRC), which is executing the project on behalf of the Mumbai Metropolitan Region Development Authority (MMRDA), awarded the civil construction contract to J Kumar Infra Projects Ltd for a section of the corridor between Samarth Nagar in
...
more...
Lokhandwala and Mahakali Caves in Andheri East.
“The contract for one of the three construction packages has been awarded; it entails construction of viaduct and five stations. The cost of the package is Rs 867 crore. The remaining civil contracts for two construction packages will be awarded by the end of the month,” said a senior DMRC official, requesting anonymity.
The corridor will have 13 stations and is expected to have a daily ridership of 6.5 lakh in 2021 and 7.69 lakh in 2031. The estimated cost for the corridor is Rs 6,672 crore.
With construction of Metro-6, the Jogeshwari-Vikhroli Link Road -- a major east-west connector -- would be barricaded leading to more traffic jams.
Currently, construction on three Metro lines is going on in the city, and motorists are facing snarls on the Western Express Highway and Link Road between Andheri and Borivli. However, MMRDA officials said that they expect to free up some of the barricaded portions on the two roads to ease traffic congestion.
Metro-6 will be integrated with Metro-2A (Dahisar-DN Nagar) corridor at Infinity Mall in Andheri, Metro-7 (Dahisar east-Andheri east) corridor at Jogeshwari Vikhroli Link Road (JVLR), Metro-3 (Colaba-Bandra-SEEPZ) corridor at SEEPZ area, Metro-4 (Wadala-Thane-Kasarvadavali) corridor at Kanjurmarg west and connectivity to suburban railway stations at Jogeshwari and Kanjurmarg.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 3
Trains with ARP 15 Dep on: Fri Mar 8
Trains with ARP 30 Dep on: Sat Mar 23
Trains with ARP 120 Dep on: Fri Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4214881
    Feb 01 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
  • Entry# 4188821
    Jan 06 2019 (02:19AM)


    @all: At this time, the PNR Forum is functioning again, albeit at a greatly reduced volume and efficiency. Refreshing PNRs is a very cumbersome affair. We may expect this to end as well, eventually, as the Govt. tightens these controls further. At IRI, we CANNOT waste any more time on this fruitless...
  • Entry# 4187635
    Jan 05 2019 (01:47AM)


    The following changes are being introduced to keep the PNR Forum functioning. . 1. A "bookmarklet" called "PNR Refresh" has been created. Just Copy/Paste a small piece of text into your browser bookmarks. The bookmarklet will be available by morning. . 2. When you click on Post/Update/Refresh PNR, you will be taken to the Official...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy