Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Sep 21 09:40:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3760597
Posted: Aug 29 (18:31)

No Responses Yet
  
Rail News
0 Followers
530 views
IR Affairs
MMOPL/Mumbai Metro
Aug 29 (18:30)   Monorail operations cost likely to increase by 130% in Mumbai

a2z~   11540 news posts
Entry# 3760597   News Entry# 353954         Tags   Past Edits
MMRDA panel suggested hiking the per-trip operational cost from ₹4,600 to ₹10,600
The operational cost of the country’s only monorail route in Mumbai may rise by more than double.
On August 15, Mumbai Metropolitan Region Development Authority (MMRDA) appointed a committee to end the deadlock between itself and the monorail operator over the per-trip cost.
The panel recently suggested hiking the per-trip operational
...
more...
cost from ₹4,600 to ₹10,600.
Operations on the 8.9-km section of the monorail between Chembur and Wadala (Phase-1) were already incurring losses for the MMRDA. But the 130% hike suggested by the panel will only add to the losses borne by the state agency.
The per-trip rate is a fee the operator is given to run (one way) and maintain the corridor by the MMRDA.
The operator — a consortium of Larsen & Toubro and Scomi Engineering (LTSE) — had sought revision in the per-trip rate and had demanded ₹18,000 per trip, according to MMRDA officials.
MMRDA plans to restart the Chembur-Wadala arm of the monorail, which was shut after a fire incident in November 2017, from September 1 and therefore had to resolve the issue before restarting operations.
“The committee has recommended a revision of ₹10,600 per trip. It has also recommended manpower management to make the operation viable for the MMRDA to run the corridor with the recommended rates,” said a senior MMRDA official requesting anonymity.
The MMRDA is incurring losses on the corridor as the route has poor ridership — ranging between 17,000 and 18,000 passengers per day. Apart from paying the operator, the MMRDA also bears the expenses for electricity and the salaries of security personnel at the stations and at Wadala depot. With the corridor catering to only a section of the city, the MMRDA is now pinning its hopes on Phase 2 — between Wadala and Jacob Circle — to make operations viable.
“Public transport is an obligation and is not operated for profits. However, we expect the ridership to go up to 1 lakh per day once the Phase 2 starts, and thus reducing the burden on the MMRDA,” said another MMRDA official.
The Wadala-Chembur arm, which is expected to be commissioned next year, will pass through densely populated areas and will have intersections with suburban railway stations.
Meanwhile, the MMRDA is also planning to install high-resolution CCTV cameras at the end of stations, at the level of tyres, along with smoke detectors near the tyres of the monorail, for real-time monitoring of the operations.
Officials said that the step was taken after it came to light that the fire in November started near the tyres. The monitoring will be done at the control room in Wadala, officials said.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Oct 1
Trains with ARP 15 Dep on: Sat Oct 6
Trains with ARP 30 Dep on: Sun Oct 21
Trains with ARP 120 Dep on: Sat Jan 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 2018 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy