Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  

Bhrigu Express: बलिया की आन बान और शान , भृगु एक्सप्रेस है तुम्हारा नाम। हर रविवार तुमसे मिलना है मेरा काम। - Shanzil Kabir

Full Site Search
  Full Site Search  
 
Sat Aug 8 17:28:00 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search

Blog Entry# 4042866
Posted: Nov 26 2018 (10:16)

No Responses Yet
Rail News
2764 views
IR Affairs
Nov 26 2018 (10:16)   Indian Railways cost overruns at massive Rs 2.46 lakh cr; blame it all on this

Anupam Enosh Sarkar^~   11906 news posts
Entry# 4042866   News Entry# 369927         Tags   Past Edits
Indian Railway projects account for over 60 per cent of the 358 central sector projects that are facing cost overrun for various reasons, with their cost escalating by Rs 2.46 lakh crore.
Indian Railway projects account for over 60 per cent of the 358 central sector projects that are facing cost overrun for various reasons, with their cost escalating by Rs 2.46 lakh crore.
A total 216 projects of railways are facing total cost overrun of Rs 2.46 lakh crore, as per the flash report of the Ministry of Statistics and Programme Implementation
...
more...
for July 2018.
The statistics ministry monitors central sector projects envisaging an expenditure of Rs 150 crore and above each on regular basis.
According to the report, the total original cost of these 216 projects was Rs 1,65,343.22 crore. The total anticipated cost of these projects is estimated at Rs 4,12,160.04 crore, which indicates overall cost escalation by 149.28 per cent.
The ministry monitored 350 projects of Indian Railways in July this year. The study stated that as many as 65 projects of railways out of the monitored 350 projects reported time overrun or delay of 3 months to 374 months.
After railways, power sector reported the second highest incidence of overall cost overrun. Out of the 110 projects monitored by the ministry in the power sector, 45 reported cost overrun of Rs 63,973.82 crore.
The total original cost of these 45 projects was Rs 1,78,005.08 crore which escalated to total anticipated cost of Rs 2,41,978.90 crore. The report stated that out of the 110 power sector projects, 36 reported time overrun (delay) of 1 month to 135 months.

COVID-19

ONLY COVID-19 Specials are running.
As Corona cases are increasing rapidly, Members are advised to TAKE extra CARE these days.
1. AVOID going outdoors even if lockdown is easing.
2. ALWAYS wear a MASK when OUTDOORS.
3. Wash hands frequently. Do NOT touch your face.


REMEMBER: PREVENTION is the ONLY Option. There is NO CURE.

Rail News

New Trains

Site Announcements

  • Entry# 4680754
    Aug 03 (10:10PM)


    In the next few days, we shall introduce a "Personal Gallery". This will consist of your own personal pics - no restrictions. You can upload any number of pics to your personal gallery - with with or without trains. This personal gallery will be part of your Member Profile. Thanks.
  • Entry# 4671643
    Jul 18 (11:53PM)


    As our Topics & Quiz section gains popularity, the following change will be made to Quizzes. Starting tomorrow, we shall not reveal the names of people who answered correctly/incorrectly. You will still know how many answered the quiz and the percentage of wrong/right responses. But ONLY the person who answered will know...
  • Entry# 4669324
    Jul 15 (10:01AM)


    Today, we are introducing a new Topic called NEWS-CRITIC. These days, everyday, we are bombarded with spam news, exaggerated news, misleading news, fake news, useless celebrity news, click bait with misleading headlines, etc. Also, much of the news is copied and rewritten from other news outlets, instead of being written first-hand. Everyone...
  • Entry# 4665139
    Jul 09 (12:37AM)


    Over the last few days, there have been concerns expressed by many members that politics are being discussed. Well, with 90% of the trains NOT running over the last 3 months, there is not much rail-fanning happening!!! People have to discuss something. Mature political discussions are allowed in the Topics section,...
  • Entry# 4658593
    Jun 28 2020 (12:39PM)


    To help with the issue of mass tagging of members, we shall soon be expanding the RF Club feature to Pvt Clubs: . 1. Any member will be able to create a Pvt Club and invite other members to join. Joining of any Club is voluntary - members cannot be forced to join...
  • Entry# 4653181
    Jun 18 2020 (11:41PM)


    @all: For the last 2 days, I have been putting up some quizzes in the Topics section, with the following design: . 1. Each quiz starts with a statement. . 2. Then a question, followed by 4-6 choices. . 3. AFTER a member makes a choice, all the other choices are revealed, along with the creator's choice and...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy