Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

NTES is the salt of Railfanning. IRI is the sugar. - Kirti Solanki

Full Site Search
  Full Site Search  
 
Fri Jun 21 02:41:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4117687
Posted: Dec 18 2018 (01:14)

No Responses Yet
  
Rail News
0 Followers
2286 views
Dec 18 2018 (01:14)   Station development: Railways to consider ULCCS proposal

Jayashree ❖ Amita*^   44339 news posts
Entry# 4117687   News Entry# 371769         Tags   Past Edits
The ₹75-crore Kozhikode railway station development project will enter its second and final phase only after the standing financial committee of the Southern Railway approves the proposal of Uralungal Labour Contract Cooperative Society (ULCCS) to prepare a detailed project report (DPR) for the purpose.
A three-member panel convened by the Chief Planning and Development Engineer, Southern Railway, is considering the proposal. It had earlier approved a technical proposal of ULCCS. Incidentally, ULCCS is the lone bidder for the project, and Kozhikode railway station is among the 23 stations identified for the first phase of redevelopment across the country.
Four
...
more...
sites, measuring 4.40 acres, identified for the project will be leased to the successful bidder for 45 years.
In the second phase, the bids will be invited based on the DPR for lease premium, sources said.
ULCCS will also have the Right of First Refusal if other companies take part in the second stage of bidding after the preparation of DPR.
The proposal is to improve facilities at the station, including construction of separate arrival and departure terminals, passenger lounges, food courts, beverage outlets, and escalators.
The sources said the Palakkad station would also be developed at a cost of ₹24.25 crore.
The first phase of work includes the construction of a platform shelter, platform surface improvement with vacuum de-watered concrete, and granite flooring. The work is expected to be completed by January 31, 2019.
Besides, the sources said the Kottayam railway station was also being developed at a cost of ₹20.08 crore. Various development projects such as multi-level two-wheeler parking and improvement of facade, platform surface and circulating area will be completed by March 31, 2019.
The Ernakulam junction railway station along with Puducherry, two stations under the Southern Railway, are also being developed by the Railway Land Development Authority under the Ministry of Railways in association with National Building Construction Company, a public sector undertaking.
The scheme is in an advanced stage of approval of the Ministry, the sources added.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 1
Trains with ARP 15 Dep on: Sat Jul 6
Trains with ARP 30 Dep on: Sun Jul 21
Trains with ARP 120 Dep on: Sat Oct 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy