Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

Train 18 - तेरी प्यारी प्यारी Livery को किसी की नज़र न लगे

Full Site Search
  Full Site Search  
 
Sun Oct 20 06:04:26 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4179881
Posted: Jan 01 (15:41)

No Responses Yet
  
Rail News
0 Followers
1537 views
IR Press Release
Jan 01 (15:40)   Construction of 4.88 Meter wide FOB on South-end of Masjid Station in a Record Time – This will be opened to commuters on 1.1.2019 as a “NEW YEAR GIFT” from Central Railway

pandeyjee   540 news posts
Entry# 4179881   News Entry# 372880         Tags   Past Edits
Press Release
Construction of 4.88 Meter wide FOB o­n South-end of Masjid Station in a Record Time – This will be opened to commuters o­n 1.1.2019 as a “NEW YEAR GIFT” from Central Railway
Central Railway has always been in forefront in upgrading facilities and considering the footfalls o­n Mumbai-end Foot Over Bridge at Masjid, it has undertaken construction of Masjid FOB from 26.11.2018. The construction was completed in record time of 33 days, a full 12 days before self imposed target, which is an all time record.
This
...
more...
included dismantling of old FOB and construction of new FOB at the same place.  The landing of this fob is widened from 2.44 m to 4.88 m. The width of the staircase of 2.44 m has also been widened to 3.66 m and o­n the other side, the width of the staircase of 1.80 m has been widened to 2.30 m. Length of the foot over bridge is 17 meter
·Old Bridge closed for commuters o­n 26.11.2018.
·Removal of electrical and S&T fittings started o­n 26.11.2018.
·Dismantling & removal of girders of old bridge commenced o­n 02.12.2018 (Sunday) during Mega Block and completed in record period of 6 hours.
·Despite space constraints Excavation & Foundation work carried out without disturbing traffic and o­nly during night corridor blocks. No special block was taken for the same.
·Stair case work was also completed o­nly during night corridor and no special blocks were taken.
·Girders were launched o­n 16.12.2018 during Sunday Mega Block of 6 hours.
·From 17.12.2018 to 30.12.2018 entire staircases, column erection, Stringers, fabrication, concreting o­n floor slab & steps carried out alongwith roof sheeting, painting, side railing & hand railings. Floor finishing with granite etc. was carried out by working round the clock.
·Electrical work was carried out o­n 29.12.2018 & 30.12.2018.   
·Cost of work: 1.25 Cr
RECORD: the earlier record of construction of FOB was of 72 days, wherein FOB at LTT was constructed. The record is broken with huge margin and the FOB at Masjid is completed within 33 days, i.e. 12 days prior to self targeted period. This included dismantling of old FOB also. This FOB is built in shortest duration with a new record of all times.
All necessary arrangements were made for smooth passenger flow through north end and middle FOBs. Notice Boards to this effect were displayed at conspicuous places.  Adequate RPF & Ticket Checking staff were deployed for guiding passengers during this period.
This is an excellent example of efficient planning, supervision and execution of work. Railways appreciate the cooperation given by all commuters during this period.
--- --- ---
Date: December 31, 2018
This press release is issued by Sunil Udasi, Chief Public Relations Officer, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Oct 30
Trains with ARP 15 Dep on: Mon Nov 4
Trains with ARP 30 Dep on: Tue Nov 19
Trains with ARP 120 Dep on: Mon Feb 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy