Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

मैं अकेला ही चला था जानिब-ए-मंज़िल मगर लोग साथ आते गए और कारवाँ बनता गया - Purnesh Upadhyay

Full Site Search
  Full Site Search  
 
Tue Oct 15 22:45:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4180288
Posted: Jan 02 (00:03)

No Responses Yet
  
Rail News
0 Followers
1051 views
Jan 02 (00:03)   Indian Railways upgrades Godavari Express under Project Utkrisht; check out the salient features

Jayashree ❖ Amita*^   46217 news posts
Entry# 4180288   News Entry# 372935         Tags   Past Edits
The national transporter under its ambitious Project Utkrisht is upgrading the rakes of as many as 640 Mail/Express trains from 2018-2019 onwards.
Project Utkrisht: Piyush Goyal-led Indian Railways upgrades another train under its Project Utkrisht! Recently, the Godavari Express train with all 24 coaches has been upgraded under Project Utkrisht. In a circular shared by Amit Varadan DRM (Divisional Railway Manager) of Secunderabad Division, the upgraded rake of Godavari Express train has been rolled out recently from Hyderabad railway station on its journey to Vishakhapatnam. The national transporter under its ambitious Project Utkrisht is upgrading the rakes of as many as 640 Mail/Express trains from 2018-2019 onwards. Here are some of the salient features of the upgraded coaches of Godavari Express train:
...
more...

1) The exterior of the coaches got PU painting as per the new color scheme
2) The coaches have been provided with GPS based LCD indication board, PA system
3) LED lighting has been provided as well
4) For clean interior and aesthetic appeal, provision of anti-graffiti vinyl wrapping in doorways, gangways, toilets has been done
5) Fire extinguisher as well as stainless steel washbasins have been equipped in all coaches
6) The toilets have been upgraded with polymerized flooring and duromat in order to keep them dry and clean
7) The berths have been made more comfortable
Out of 640 rakes of Mail/Express trains, 140 rakes are being upgraded in the first phase while 500 rakes are to be upgraded in the second phase. For this ambitious project, an amount of Rs 60 lakh has been sanctioned per rake by the government. The entire Project Utkrisht is expected to be completed by the month of March, this year. The project aims at upgrading ICF (Integral Coach Factory) design coaches and bring them at par with LHB (Linke Hofmann Busch) coaches in terms of passenger comforts. Several parameters such as enhancement to seats, berths, exteriors, flooring, toilets etc. have been identified under this project.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Oct 25
Trains with ARP 15 Dep on: Wed Oct 30
Trains with ARP 30 Dep on: Thu Nov 14
Trains with ARP 120 Dep on: Wed Feb 12

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy