BB Div crew will work till IGP and will take LRD upto JL under supervision of BSL LI's. Eventually they will work till JL
Crew pattern
CST-JL-CST BB Crew
JL-BPL-JL BSL crew
BPL-JHS-NZM-JHS-BPL...
more... NCR crew
WAP5 twins reaching CSMT tomorrow. To ensure MPS in NE section, it is essential
105 in BB div, 110 in BSL Div
LP's will be doing up down in hired car from JL to BSL
Push pull need more trials and it will happen. After permission from RDSO/CRS WAP5 MU will be replaced by Push Pull arrangement with 1 P7 at either end of rake
Train will not halt at BSL
2000 new branded blankets and linen sets have been purchased for Rajdhani. 11 coaches in train are re-engineered and fitted hot cases and coolers in 24hrs
All TTE will carry HHT Tablets, first on CR