Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

Indian Railways: Divided By Zones, United By Railfans - Karthik

Full Site Search
  Full Site Search  
 
Fri Jan 24 15:51:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4346261
Posted: Jun 18 2019 (16:52)

No Responses Yet
  
Rail News
0 Followers
1191 views
Metro
MMOPL/Mumbai Metro
Jun 18 2019 (16:52)   Work on track: MMRDA starts laying rail lines for Metro 2A, 7

12649⭐️ KSK ⭐️12650^~   3946 news posts
Entry# 4346261   News Entry# 384533         Tags   Past Edits
While track-laying for Metro-7 started on Sunday, work on Metro-2A had begun earlier in the week.
The Mumbai Metropolitan Region Development Authority (MMRDA) on Monday said that track-laying for two Metro lines – Metro-2A (Dahisar-DN Nagar) and Metro-7 (Dahisar East-Andheri East) – has started on the Link Road and the Western Express Highway (WEH).
While track-laying for Metro-7 started on Sunday, work on Metro-2A had begun earlier in the week.
In
...
more...
a statement issued on Monday, MMRDA said, “In the wee hours of Sunday, we unloaded the first lot of Metro rails for the Dahisar East to Andheri East corridor near National Park station. The head-hardened HH1080 grade rails were imported from Japan. They were transported to the site from Wadala Yard using a 70-foot trailer. Thereafter, using a 50-tonne mobile crane, the rail bundles, each consisting three rails, were lifted and unloaded on the viaduct.”
Further explaining the process behind installation of Metro rail tracks, MMRDA officials said once placed on the viaduct, the rails will be welded a welding machine, which is also ready to be lifted on the viaduct for deployment.
The track-laying work is expected to be complete by March 2020, after which by mid-2020 trial runs are expected to start. The trial runs will take around six months to complete followed by which commercial operations on both corridors will start by end of 2020.
The two corridors, once operational, are expected to carry around 15 lakh passengers daily between Dahisar and Andheri

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Feb 3
Trains with ARP 15 Dep on: Sat Feb 8
Trains with ARP 30 Dep on: Sun Feb 23
Trains with ARP 120 Dep on: Sat May 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy