Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

यमला-पगला-ट्रेन का-दिवाना - कार्तिक

Full Site Search
  Full Site Search  
 
Fri Jan 24 22:11:31 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4486994
Posted: Nov 13 2019 (14:01)

7 Responses
Last Response: Nov 13 2019 (14:32)
  
Rail Fanning
0 Followers
2825 views
★★
Nov 13 2019 (14:01)   15026/Anand Vihar Terminal - Mau Express | MAU/Mau Junction (4 PFs)

Tourister^~   82629 blog posts   48992 correct pred (79% accurate)
Entry# 4486994            Tags   Past Edits
Electrification updates of Mau, newly built washing line (1 day temporary maintainance of ANVT-MAU etc)
Also electrification is in progress for phephna-indara line too which will be completed at same time of arj-mau-bhatni
.
Wiring is going on 2 weeks ago at full pace, expected kV charge by month end and CRS in December may be if substations finishing work will be done
...
more...
along with engine trial..
Elocos from new year is expected..
Dozens of trains will get eloco like Lichchavi, gorakpur intercity, chappra intercity, bapudham, purvanchal, many passengers, kashi express, durg nautanwa etc as katni-satna section will also electrified at same time so gkp bound trains going to that side will also run on elocos
.
Meanwhile Shahganj-amh-mau section not yet electrified and no work has been done so far, new tender proposed as earlier one have some design faults due to semaphore signalling at azamgarh and few other problems..
It take almost 9 months more to electrfiy that section.
As long as doubling, it will be completed by 2024 for ARJ-BHATNI exc. Mau-indara
2022 for Indara-Phephna
No idea about Azamgarh-shahganj..
Memus will replace passengers and demus for sure as the section stations height has been raised 2 years back and some work for station also going in indara-bhatni section..
Mps is 110 for ARJ-BTT but capacity is 130 as per trials..
They had plan to make fast section for BSB-GKP so that 1 can easily reached to GKP/BSB from BSB/GKP in time about 4 hours or less (future proposals)
.
Mau may get extension of bsb bound train or new train due to newly built washing line and to ease congestion at BSB
.
Thanks

7 Public Posts - Wed Nov 13, 2019

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Feb 3
Trains with ARP 15 Dep on: Sat Feb 8
Trains with ARP 30 Dep on: Sun Feb 23
Trains with ARP 120 Dep on: Sat May 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy