Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode

हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Full Site Search
  Full Site Search  
Just PNR - Post PNRs, Predict PNRs, Stats, ...
 
Wed Aug 10 08:36:43 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4514874
Posted: Dec 16 2019 (01:03)

No Responses Yet
Rail News
4638 views
Dec 16 2019 (01:03)   ICF gets nod to make Vande Bharat Express rakes

Jayashree^   50519 news posts
Entry# 4514874   News Entry# 396757         Tags   Past Edits
Fresh tenders will be floated to buy the propulsion system. 
Ending months of controversy over the move to import complete train sets by floating global tenders and the stiff resistance that followed from senior railway officials and political parties, the Ministry of Railways has finally accorded sanction to the Integral Coach Factory (ICF) here to roll out 45 rakes (720 coaches) of the Vande Bharat Express.
In a communication sent to the General Manager on Saturday, the Railway Board cleared the decks for the ICF to proceed with the procurement process immediately
...
more...
with the specifications issued by the Research Designs and Standards Organisation (RDSO). Fresh tenders will be floated to procure the propulsion system with revised guidelines on the design and eligibility criteria of suppliers. The ICF was told to ensure that there was no compromise on the Make in India policy.
Confirming this to The Hindu, a senior railway official said the decision to approve manufacture of the rakes by the ICF was taken at a high-level meeting in New Delhi. The opinion of the General Managers of the Rail Coach Factory, Kapurthala, and the Modern Coach Factory, Raebareli, was also sought on their capability to make the train sets so that they could be included in the programme to roll out the 45 rakes by 2021-22.

Probe sought into ‘sabotage’ of Vande Bharat Express
“This is a huge success for the ICF that manufactured Train18, India’s first semi-high speed train in a record 18-month time in 2018. The indigenously built self-propelled train, launched as Vande Bharat Express between New Delhi and Varanasi by Prime Minister Narendra Modi in February, has been acknowledged as one of the most successful products of the Make in India campaign. The second rake, flagged off a couple of months ago, is operating between New Delhi and Katra. The production was halted over the alleged procedural flaws in the making of the train,” a senior railway officer said.
The tenders to manufacture more Train18 rakes were withdrawn after the Vigilance Directorate launched an investigation into the allegations that included one company being favoured in the making of the first two rakes.
While then ICF General Manager S. Mani retired from service, then Principal Chief Mechanical Engineer Shubhranshu, who played a key role in the project, and a few others were not only transferred but served questionnaires by the vigilance officials to respond to the allegations. 
Even as the investigation was on, the Railway Board proposed to procure 60 rakes by floating global tenders. The reason why production was halted at the ICF was that the rakes were found to be heavier and also consuming more power compared to the Shatabdi Express. The move drew sharp criticism from railway officials including Mr. Shubhranshu who recorded his protest in writing to the Chairman Railway Board, the All India Railwaymen Federation and a couple of political parties that raised the issue in Parliament.

Weight issue halted Train18 construction: Railway Board
The 45 rakes, meaning 720 coaches, that the ICF has been mandated to make now will be on a revised design of the Train18 model approved by the RDSO. Parrying questions on whether the new specifications would weigh lesser to minimise electricity consumption, the official who preferred not to be quoted, said the new design would conform to world class standards of comfort and safety. 
Considering the fact that the earlier two rakes were made at a cost of ₹100 crore each, the 45 rakes for which tenders will be floated soon meant an order of at least ₹5,000 crore taking escalation in the cost of materials and other modifications into account, the official said. He said full credit to restore the project to the ICF went to Railway Minister Piyush Goyal who recently told Parliament that he was proud of the ICF which made the Vande Bharat Express, the first high-speed train made in the 168-year history of the Indian Railways.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
  • Entry# 4785432
    Nov 21 2020 (02:51AM)


    We are unifying the Bookmark scheme for Blogs & PNRs. Previously, we had different systems of "Followed Blogs", "PNR History", "My PNR Posts", "My PNR Post Predictions", "Stamp Alerts", etc. which were somewhat confusing. Hereafter: For PNRs: 1. You may add ANY PNR to your bookmarks through the "Add Bookmark" link in the...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy