Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode

ಮೈಸೂರು - ವಾರಣಾಸಿ ಎಕ್ಸ್‌ಪ್ರೆಸ್: ಕಾವೇರಿ ಮತ್ತು ಗಂಗಾ ನದಿಗಳ ಸಂಪರ್ಕ ಸೇತುವೆ - Vishwanath Joshi

Full Site Search
  Full Site Search  
Just PNR - Post PNRs, Predict PNRs, Stats, ...
 
Sat Aug 13 12:25:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4514876
Posted: Dec 16 2019 (01:04)

No Responses Yet
Rail News
4166 views
Dec 16 2019 (01:04)   Officials sceptical of making 45 Vande Bharat rakes in 2 years

Jayashree^   50519 news posts
Entry# 4514876   News Entry# 396759         Tags   Past Edits
The Railway Ministry clearing the decks for the Integral Coach Factory (ICF) here to continue making Vande Bharat Express trains is seen as a welcome move though senior officials are sceptical of rolling out 45 rakes, 720 coaches, by 2021-22.
Even if tenders are floated immediately as per the revised specifications approved by the Research Designs and Standards Organisation (RDSO), it would take at least two years to roll out the first prototype for operation after the mandatory oscillation tests and safety approvals.
While it would take three months to open tenders for
...
more...
scrutiny, another two months would be needed to finalise and award work, a senior railway official told The Hindu on Sunday.
Considering that the manufacturing process is monitored on a day-to-day basis, the prototype electrics would be ready only by November 2021 and take at least three months for the mandatory inspection and type test process.
The complete manufacture of the train set along with oscillation assessment and certification for operation by the Commissioner of Railway Safety would be possible only by November 2022 and the first prototype can be put into service a month later.
“It’s a welcome announcement to restore the project to ICF... but making 45 rakes would not be possible in the next two years since the design specifications have been changed. In the event of Rail Coach Factory, Kapurthala, and Modern Coach Factory, Raebareli, joining the mission, then it would be possible to bring out a few rakes in two to three years,” another official, who also preferred not to be quoted, said.
The decision to continue manufacture of Vande Bharat Express rakes at ICF was a boost to the morale of the employees, particularly the team that was part of Team18 project, All India Railwaymen Federation (AIRF) working president N. Kanniah said on Sunday.
Thanking Railway Minister Piyush Goyal for restoring the project to ICF, he urged the Railway Board “to ensure that the 45 rakes are not only built in accordance with the Make in India initiative but manufactured indigenously by ICF in the same way the first two Train18 rakes were made.”
He said the objective and essence of ‘Make in India’ campaign was to identify and promote local talent which would generate local employment and boost economy. “I appeal to the Railway Minister to make sure that the design specification or other tender conditions are not tweaked to favour any global player in this project,” Mr. Kanniah said.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
  • Entry# 4785432
    Nov 21 2020 (02:51AM)


    We are unifying the Bookmark scheme for Blogs & PNRs. Previously, we had different systems of "Followed Blogs", "PNR History", "My PNR Posts", "My PNR Post Predictions", "Stamp Alerts", etc. which were somewhat confusing. Hereafter: For PNRs: 1. You may add ANY PNR to your bookmarks through the "Add Bookmark" link in the...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy