Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Full Site Search
  Full Site Search  
 
Thu Apr 2 02:24:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4590011
Posted: Mar 11 (21:38)

No Responses Yet
  
Rail News
0 Followers
2112 views
IR Affairs
Mar 11 (21:38)   Get ready for 110 world-class stations! 10 interesting things to know about Indian Railways big infra project

kedarc68   22 news posts
Entry# 4590011   News Entry# 402705         Tags   Past Edits
The redevelopment of railway stations does not mean just improving its lighting and façade, but complete transformation of railway stations with well-planned entry/exit points, segregated passenger movement and improved road accessibility, similar to airports.
110 world-class Indian Railways stations! Indian Railways to get a massive infrastructure boost like never before! In the coming years, as many as 110 railway stations across the country will be turned into swanky airport-like hubs. In a recent interview with IE, Sanjeev Kumar Lohia, CEO and MD of the Indian Railway Station Development Corporation (IRSDC) talked about the plans to redevelop 110 stations. According to Lohia, the redevelopment of railway stations does not mean just improving its lighting and façade, but complete transformation of railway stations with
...
more...
well-planned entry/exit points, segregated passenger movement and improved road accessibility, similar to airports. Here are 10 interesting things to know about Indian Railways’ big station redevelopment plan:
1) The railway stations under this project will be transformed into seamlessly connected hubs. Also, adequate waiting rooms will be provided for all classes of passengers and thus, no one will have to sleep on platforms.
2) The waiting rooms at the redeveloped stations will be built at a concourse above the platform which will have retail outlets. Passengers can go to the platform only five to ten minutes prior to their journey.
3) With the redevelopment, the stations will become much safer. They will be fully equipped with CCTVs.
4) Out of the 110 railway stations, 60 stations are being transformed by IRSDC while the rest of the 50 stations are being redeveloped by the Railway Land Redevelopment Authority (RLDA).
5) Around 398 A and A1 category stations have been studied by the Boston Consulting Group – based on land availability, commercial potential, passenger footfall, and the company has prioritized a few stations. The IRSDC is currently working on those priorities.
6) At present, IRSDC had called for a Request for Quotation (RFQ) for Nagpur, Gwalior, Amritsar, and Sabarmati stations. The proposal for Chhatrapati Shivaji Maharaj Terminus has been sent to the ministry for approval, while Surat and Udhna stations are in quite advanced stages and IRSDC is hoping to call for their RFQ soon.
7) Redevelopment work at Habibganj station has been completed 80% and the station will be ready for operations by the month of April. The work at Gandhinagar station will end in the next few months.
8) The first 50 railway stations will be bid out on the PPP model for the redevelopment with funding through land monetization along with user charges, which will be a nominal fixed amount, part of the ticket price.
9) According to Lohia, the pre-bid meeting saw participation from 9 funds, at least 40 consultants and 17 developers. The lease period of land/area where residential development is being done has been increased to 99 years as against 15 years.
10) On the other hand, the lease for commercial development has increased from 45 years to 60 years. Moreover, a single-window clearance has been made available to further ease out the process.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 12
Trains with ARP 15 Dep on: Fri Apr 17
Trains with ARP 30 Dep on: Sat May 2
Trains with ARP 120 Dep on: Fri Jul 31

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy