Double tracking from Vasco to Margao work not started yet. Throughout this video I have shown the other side of the railway tracks where new line will be laid (Double tracking) from Vasco da Gama to Madgaon Via Dabolim, Sankval, Velsao, Cansaulim, Majorda, Suravali. From Utorda to Margao there exist double lines already (also shown). Dabolim Airport, grade separator, Holant beach, Velsao dando beach, Rly gate Velsao, Cansaulim area, Railway Gate, Arossim Chapel, Majorda Rly gate, Seraulim Church, River Sal, Comba rly gate, Cine Lata area, Old Margao Rly gate, flyover, Old Station area etc