It's the Railway Board which takes decision of upgrade of Sections and what can SCR do when RB doesn't direct them. As per the original plan KGP Bhadrak to be upgraded by 2022, PSA by 2023 and Vskp by 2024. So the second section target is acheived 6-8 months before. Have to see when PSA Vskp will be ready for 130kmph.