Major repercussions w.r.t. line block and power block in Kochuveli yard due to yard remodelling
Yes, this was the long pending demand and already tvm DRM assured to complete all by end of this year
If new PF come up then more trains can be received and dispatched from KCVL which is good
Karnataka will get second VB, AP will also get one. Kerala and Telengana I think will be put in waiting list considering that they are not favorable to BJP.
Above Yard work is for 2-PF and 1-Stabling line commissioning.So after this work Total 6 PF and 4 Stabling Lines at KCVL
Regarding VB there are 3 pitlines at Kcvl.In that 2 pitline will be electrified for VB maintenance.Tender has been invited
Kochuveli Railway Station will get a major infrastructure upgrade with the commissioning of two new platforms and a new train stabling line, for which the final stage works are scheduled from 01st to 11th December, 2022.
The infrastructure works carried out at a cost of Rs 39.57 crores also includes;
a)...
more... Extension of two existing Platforms (PFs 2 & 3) 53 metres,
b) Additional Platform shelters for PFs 2 & 3 (32 metres) & PFs 4 & 5 (64 metres), and
c) new signal and telecommunication facility & OFC hut.