Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Oct 10 13:21:40 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6166680
Posted: Aug 24 (11:32)

60 Responses
Last Response: Sep 01 (08:22)
1 Followers
General Travel
177102 views
32

★★★
Aug 24 (11:32)   19305/Dr. Ambedkar Nagar - Kamakhya Weekly Express (PT) | LKO/Lucknow Charbagh NR (9 PFs) | LDH/WAP-7/30626
thedemigod
thedemigod   375 blog posts
Entry# 6166680            Tags   Past Edits
20 compliments
Great Great Great Great Great Great:write-up. Great:Playing with saloon and alcos 😂 Great Great Great Great Great Great Great Great Great Great Great Great Great
DADN-KYQ Express, NR/LKO ka Aatank.

So, for some urgent work, I had to return home to Varanasi from Lucknow. The original plan was to return via Ekatmata Express, but due to some unforeseen circumstances with my Thar, I had to return back from midway to the station.

So,
...
more...
another hour, another plan. The 19305, DADN-KYQ Express suited me the best, so I booked the tickets in current availability. Hopped on an Uber and that was the fastest commute in my entire journey, reached Charbagh from Ekana in just over 20 minutes.

The train was on time till Kanpur, and as soon as it entered NR, it instantly got late. Still, I hoped the delay would not exceed 45 minutes. But the great NR/LKO. They were playing with a GM saloon and two ALCos on the PF-2 where the train was supposed to be received.

Shaheed Express was taken on the vacant PF-3 first, and when the ALCos finally got done with the parking simulator, Bagh Express was received on PF-2. And while it was a pleasant surprise to see coach display indicators on LKO, they were working with a mind of their own. Data of my still nowhere to be seen train was displayed while Bagh was on PF-2. And that of Shaheed started being displayed after it's departure.

Finally, after a delay of 1.5 hours, the train arrived on PF-3 and departed after accumulating a few more minutes of delay. But here comes something I hadn't expected from NR/LKO even in my dreams. The train reached SLN in around 1hr 20min, averaging more than 100kmph. And covered SLN-JOP in around 50 minutes, again an average of 100kmph. Now I was sure, we'd reach Varanasi before 11:30.

And then started typical NR behavior. The train was halted at every station to let the freights gain some progress, even though we were still late, officially. And finally the train was halted at Babatpur because operational block was taken. A totally avoidable situation, had they run the train on the schedule it was running.

The train halted there for almost an hour. Another block was scheduled if the previous one didn't work (they were welding the tracks), and exactly the same thing happened. But somehow we were allowed to proceed, supposedly because the train was full of people appearing for some exam, and they got agitated. The train was halted yet again at Shivpur and Varanasi outers.

At this point I was so annoyed, I deboarded and started walking towards the station. I boarded back when the train started crawling towards the station. Finally it reached BSB around 2 hours late. ½ hour of gained delay, even with a track-burning run, and a heavy slack in last 50km.

You can trust a wolf to guard the sheep, but can't trust NR to reach somewhere on time. Attached here are some pictures I took while waiting for my train. Well, except for the train I was traveling in.

P.S. Farakka is still displayed as MLDT-NDLS at BSB. And while the train boards are still printed and handwritten, CDO/KIR has taken extra steps to paint ER again wherever it had been peeled off. They're surely reading some blogs here.

Kumud.

Translate to English
Translate to Hindi

60 Posts

24249 views
4

Aug 31 (01:16)
thedemigod
thedemigod   375 blog posts
Re# 6166680-61              
2 compliments
Agree Agree
Ideally we need a pair of ICEs running on opposite TTs and in some cases multiple trains running with similar TTs like NR runs the Shuttle, ICE, MEMU and Special between BSB-LKO one after other. Yeah, NR/LKO is bad, but other zones should learn from NR in this aspect.

VB serves a different purpose. A person traveling regularly won't prefer a train with ₹1500 one-way fare when they can travel in ICEs in 1/10 of the same fare. It's not practical. They've got a concept that worked for the PR and are
...
more...
milking it beyond reasonability.

Vande Metro is a much better concept, and should be run at deserving routes with convenient timings apart from the reasonable pricings. Let's see what they come up with, you can't trust IR nowadays. They can mess up when you're least expecting them to.

Translate to English
Translate to Hindi

21429 views
1

Aug 31 (09:10)
kirk781^~   4454 blog posts
Re# 6166680-62              
1 compliments
Agree
The faster MEMU b/w Varanasi and Lucknow via Sultanpur doesn't start from either of the main stations now [ends at Shivpur and Utratia on other side], so that's a hamper for end to end travel.

Look at LKO-MTC VB time table. Instead of introducing a train in the opposite TT, it just overlaps with the existing Intercity time table with it being an hour faster.
Translate to English
Translate to Hindi

19256 views
0

Aug 31 (10:14)
Jogmani~
Jogmani~   28 blog posts
Re# 6166680-63              
Need a daily Lucknow Guwahati exp via Banaras Darbhanga SPJ KGG KIR NJP..
Translate to English
Translate to Hindi

20527 views
2

Aug 31 (14:43)
thedemigod
thedemigod   375 blog posts
Re# 6166680-64              
That's a negative point about the MEMU. Else timings and average delays are palatable. Reaching Shivpur is not an issue per se, it's just that it's two extra steps if you're taking the public transport. Don't know about Utraitia on the other end.

The Rajyarani itself runs comparatively empty and they're introducing a much pricier option on the same time, I've a bad feeling about this. They could've tried new routes or new TTs, but expecting that from the babus of IR is too much. Even the train is averaging 63kmph, some
...
more...
long distance trains with plenty of halts have much higher average than that.

That being said they're apparently introducing the Tatanagar-Brahmapur VB. A relatively exonomjcally backward area which needs ICEs and is struggling with the current trains doesn't need a VB. I don't know if people sitting in the IR offices even have common sense or not. And the less we talk about sense in our 'leaders', the better.

Translate to English
Translate to Hindi

19233 views
1

Sep 01 (08:22)
kirk781^~   4454 blog posts
Re# 6166680-65              
1 compliments
Agree:That's a must for good patronage!
The tracks for PBH and SLN diverge from Utratia. But it lies inside residential area, so public transport isn't always directly available. Plus since only couple of trains start/stop from here, there isn't much demand either.

TATA-Brahmapur has to be the stupidest VB ever. That route doesn't have an overnight option yet they want to run an 8 coacher VB for some reason. Neither the area nor the tracks are suited for such an operation. IR should put some basics in place like, if tracks are only suitable for 110 kph end
...
more...
to end, then VB shouldn't be introduced because there is no point for it.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3247625 ★★★ 136~
3270606 ★★★ 400TravelBahanaYou^~
5248097 ★★★ 92Jordan~
1959644 ★★★ 272Arpit~
5335816  13purubaba.ankit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy