Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Jan 21 23:42:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6307094
Posted: Dec 03 2024 (21:17)

29 Responses
Last Response: Dec 06 2024 (15:44)
Travel Question
94373 views
9

Dec 03 2024 (21:17)  
Exynos9611^~
Exynos9611^~   36794 blog posts
Entry# 6307094               Past Edits
4 compliments
Great Great Useful Great
What will u do when u become railway minister for 1 day note this question is only for your opinion pls dont spread hate regarding ir and regarding railway minister just want to know what changes will you do in ir

what ill do
1 bring back all icf liverys
2
...
more...
save diesel locos
3 more focus on passenger services ammenities hospitality
4 more focus on all people
5 revival of antyodaya janshatabdi humsafar garib rath
6 increase rrb vacancies
7 will give more security and job safety for trackman gangman and others who are treated as hell in ir right now
8 try to eleminate corruption from ir
9 and try to take strict action against those zones who delay their ongoing rail projects


and the list goes on

Translate to English
Translate to Hindi

27 Posts

12651 views
2

Dec 06 2024 (09:30)
deepak.yerr~
deepak.yerr~   7029 blog posts
Re# 6307094-47              
IR has planned to make Economy AC coaches to replace Non AC coaches. 3ACE to replace SL but later priced it almost equal to 3AC which destroyed the purpose of design. The fare should be between present SL and 3AC so that people who can afford can upgrade to 3ACE. If 3ACE is priced lower then they can replace half of SL in first few years then half in another years which is a gradual phase may be in 5 yrs from 2024 to 2028 but they choose to completely ignore the ground facts.and went for 10 3AC coaches in place of SL and only 2GS. ACCE inplace of GS should have been designed and put in simultaneously is not rolled out. Now they have designed AC SLR coach which went for trails. According to Shubham Kumar youtuber who makes videos on Railways technically recently SL coaches...
more...
are tested for 160kmph and results and recommendations are to be submitted to RSDO. Earlier there was talk the present track cannot be upgraded to 130kmph as bridges won't support but the reality is in VSKP Vijayawada half of the minor bridges are still rock built with base foundation British era about 75-100 yrs old and 130kmph Vande Bharat is running and tested for 143kmph. For 160kmph they need to reduce the concrete sleeper gap and lay heavier density Rails.

Translate to English
Translate to Hindi

17108 views
5

Dec 06 2024 (15:44)
Shankar_Rail
Shankar_Rail   91 blog posts
Re# 6307094-49               Past Edits
Nine steps for Zero Wait List in IR


Step 1 - Rationalisation of passenger trains

Merge
...
more...
all the similar category trains into a generic name.

(i) Type of trains like Duronto, Humsafar, SK, Rajdhani, Tejas Rajdhani, Vande Bharat Sleeper, etc are one category - "Tejas Bharat" trains.

(ii) All long distance trains above 200 kms like Mail, Express, Antyodaya, Vivek, passenger, etc as "Express Bharat" Trains with commuting average speed of less than 60 kmph.

(iii) Trains in SuperFast and Garib rath category can continue as "SF Bharat" trains with minimum 60 kmph average speeds

(iv) Shatabdhi, Vande Bharat, Gatiman, Etc are in "Vande Bharat" trains.

(v) Jan shatabdhi, Intercity, Namo Bharat Rapid Rail, Double Decker, etc in the " Namo Bharat RR" Trains category.

(vi) All passenger trains, MEMU, DEMUs, etc can be combined into one category "Jan Bharat".

(vii) All local trains will continue as " Pranthiya Bharat" trains.

------

Step 2 - Rationalisation of number of intermediate stops, irrespective of travel distance.

(i) All AC SF trains with maximum 6 intermediate stops

(ii) All Super Fast Category trains with maximum 10 intermediate stops

(iii) All Express trains with maximum 15 intermediate stops

-------

Step 3 - Train rake lengths to 22

All long distance trains including AC SF trains, Super Fast trains and Express trains to have 22 rakes. Removal of luggage cars, pantry cars, Generator cars ( by making HOG engines) and operate separate parcel trains.

------

Step 4 - Dedicate two years of production to introduce new trains.

Around 6000 LHB SL, 3A and 2A coaches can be produced per year and for next two years around 12000 coaches, I e., 546 train rakes or 273 daily pairs of trains can be introduced in the system and thus the capacity of 8 lakhs reserved seats can be added to the system. This can be achieved by stalling LHB conversion for two years. There will be zero wait list after implementing this step. Additional revenue per annum would be 12000 coaches * 72 berths * 365 days * 1000 per ticket = Rs 31536 crores or at 80 percent occupancy at least 25000 crores.

------

Step 5 - 200 trains of 24 rake length of Vande Sleeper coaches to be introduced in all non-rajdhani routes.

-------

Step 6 - Namo Bharat Rapid Rail - 750 rakes

Produce only Namo Bharat Rapid Rail at Latur / Khazipet new coach factories at speed of 1800 coaches (or 150 rakes) per year, and in 5 years can reach a target of 9000 coaches or 750 rakes. IR has around 68,584 Route KM as of 2024 and may reach 75,000 Route KM in 5 years.

Let us say Namo Bharat RR will cover a distance of 200 km. For example between Mumbai to Chennai of approx 1280 km, we can split into 6 sections of 215 km each. Sections could be approx, Mumbai - Pune (190km), Pune - Solapur (264:km), Solapur - Raichur (257 km), Raichur - Gooty (150km), Gooty - Kadapa (156 km), Kadapa - MGR Chennai Central (266 km). Each section can be covered by two Namo Bharat RR trains in either direction, with three trips per day, I.e., total 6 trips * 3500 passengers per trip. So, each section of 200 kms can be covered with two Namo Bharat RR rakes and carry 21,000 passengers per day.

So 75,000 Route KM require around 375 * 2 = 750 Namo Bharat RR rakes. This would make the short distance unreserved passengers of around 750 * 10500 = 78.75 lakh passengers per day.

These trains would take away the load of unreserved passengers and over crowding long distance trains.

Also, the intermediate stops of Tejas Bharat, SuperFast and Express trains can be limited to 6, 10 and 15 respectively and improve average speeds of these trains to 75, 60 and 50 kmph respectively.

-------

Step 7 - Continue production of Vande Bharat trains at 50 rakes per year and of 16 coach length. Introduce them based on actual passenger load only.

------

Step 8 - Introduce passenger ticket vendors cum checkers

On all passenger, Memu, express train General coaches, etc on permanent basis. Say around 6,000 daily trains * 3 = 18000 Ticket checkers cum vendors and add revenue. Definitely, the additional revenue more than compensate the salaries. One ticket checker issuing 10 tickets per day is enough to recover the salary expenses, from ticket less passengers.

Step 9 - Removal of arbitrary blocking of reservation berths in all trains

There are numerous and undesirable blockage of berths for various categories of people including journalists, MLA, MP, Judiciary, State admin, central admin, etc etc in railway booking. One can remove or make these reservation limited to 3 percent of total berths in a train. In each long distance trains close to 50 berths are released if not taken, at the last minute. That's why people book wait listed tickets and keep waiting. Arbitrary and can be reviewed thoroughly before limiting to 2 or 3 percent for such emergency work of key departments and internal railway consumption.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy