Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Aug 23, 2017 02:34:56 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Aug 23, 2017 02:34:56 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by balajisa
Page#    8 Blog Entries  next>>
  
General Travel
1 Followers
10313 views
May 26 2017 (15:38)   S/Shrirangapattana (1 PFs)

Prometh Suresh~   501 blog posts   658 correct pred (67% accurate)
Entry# 2294022            Tags   Past Edits
When will doubling work at Shrirangapattana and electrification work b/w Yeliyur and Mysore be completed?

61 posts are hidden.

  
316 views
Jun 30 2017 (17:10)
balajisa   12 blog posts
Re# 2294022-66            Tags   Past Edits
onboard 12008, noticed kaveri north & south interlinking started with the last few inches remaining. srirangapatna station is ready, fob done but rub can wait. wonder why they are dragging this project for so long even after all clearances. lethargy or plain disinterest. electrification is also limping with pandavapura getting done, but the up line at byadarahalli still poles not fixed. wiring not reached mysore yet. wonder if a wap7 shatabdi could make it to mysore by aug 15. fingers crossed.

1 posts are hidden.

  
471 views
Jul 01 2017 (09:49)
Waiting for UBL MAQ exp~   2271 blog posts   739 correct pred (70% accurate)
Re# 2294022-68            Tags   Past Edits
Is the new platform under construction at Shrirangapattana long enough for 24 coach trains ?? The present pf cannot handle 24 coaches.

3 posts are hidden.

  
622 views
Jul 03 2017 (10:24)
balajisa   12 blog posts
Re# 2294022-72            Tags   Past Edits
no, 20-21 max. in fact, the new platforms look even shorter owing to the extended curve of the existing line.

  
479 views
Jul 03 2017 (21:29)
balajisa   12 blog posts
Re# 2294022-73            Tags   Past Edits

  
459 views
Jul 04 2017 (15:43)
fayazdm   147 blog posts
Re# 2294022-74            Tags   Past Edits
I hope this news turns out to be true .bcoz in the month of April 20th same news came that Doubling was finished and inspection will be done on 30th of April on shrirangapatna.but after that there was no news opening the 1.5km remaining new line until and unless I got the info from our railfan swaroop Hegde that track linking work was to be done from existing line to newly laid line and FOB and RUB works were to be completed yet.

79 posts are hidden.
  
Imaginary
0 Followers
598 views
020
May 24 2017 (21:32)   IMG77586/♥♥Mysore-Chennai Tejas Express♥♥

Bengaluru Chennai Mail in MSTS coming soon^~   342 img trains   328 popular
4668 green flags   15 red flags   14 green per Train
Entry# 2291309            Tags   Past Edits
Presenting my dream Tejas TT from Mysore to Chennai via Bangalore. This TT will be feasible after MYS-SBC stretch is completely electrified and doubled and MYS-MAS section is upgraded for higher MPS.
Return-/train/62515.
Kindly flag and post your views. Thanks in advance.

3 posts are hidden.

  
273 views
May 25 2017 (13:27)
balajisa   12 blog posts
Re# 2291309-4            Tags   Past Edits
katpadi & mandya not feasible. MYS-SBC-BNC/KJM/BYPL-PER-MAS

  
238 views
May 25 2017 (15:35)
Bengaluru Chennai Mail in MSTS coming soon^~   10749 blog posts   16417 correct pred (86% accurate)
Re# 2291309-5            Tags   Past Edits
KPD can fetch lot of passengers. Even Shatabdis get good patronage from KPD. Not added KJM ,BYPL and PER due to their proximity to major terminals.
  
General Travel
0 Followers
1186 views
Aug 28 2016 (17:08)   12008/Mysuru - Chennai Central Shatabdi Express
 

balajisa   12 blog posts
Entry# 1974902            Tags   Past Edits
KPD halt removed for 12008

  
1183 views
Aug 28 2016 (17:10)
Pran Pratim Ghosh   23613 blog posts   100323 correct pred (75% accurate)
Re# 1974902-1            Tags   Past Edits
updated.
  
General Travel
0 Followers
1327 views
Aug 15 2016 (12:04)   12008/Mysuru - Chennai Central Shatabdi Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
 

12658 Chennai Mail*^~   9324 blog posts   23910 correct pred (65% accurate)
Entry# 1963267            Tags   Past Edits
Seems running with 2 extra CC, how long ?

  
1116 views
Aug 18 2016 (14:12)
balajisa   12 blog posts
Re# 1963267-1            Tags   Past Edits
now running late to mys by 1/2 hr almost daily becoz of 14 coaches to clear the curves & loops
  
General Travel
0 Followers
1698 views
Aug 09 2016 (18:13)   12007/Chennai Central - Mysuru Shatabdi Express
 

balajisa   12 blog posts
Entry# 1956689            Tags   Past Edits
solapur superfast's latest 12007/8 train board, admins pls update, looks good for a wall img.

  
1584 views
Aug 09 2016 (18:42)
sys tem~   8274 blog posts   76098 correct pred (76% accurate)
Re# 1956689-1            Tags   Past Edits
solapur nahi shatabdi !!

1 posts are hidden.
Page#    8 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 2
Trains with ARP 15 Dep on: Thu Sep 7
Trains with ARP 30 Dep on: Fri Sep 22
Trains with ARP 120 Dep on: Thu Dec 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.