Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Aug 20, 2017 22:57:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Aug 20, 2017 22:57:33 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Rail Premi
Page#    63 Blog Entries  next>>
  
General Travel
0 Followers
1298 views
Nov 29 2016 (11:09)  

Rail Premi   75 blog posts
Entry# 2074653            Tags   Past Edits
Londa - Miraj Doubling
  
Rail News
0 Followers
2455 views
Nov 24 2016 (09:51)   Kanpur tragedy: Lower Parel workshop under scanner over maintenance of rake

❤ WAP7 ❤~   1107 news posts
Entry# 2069610   News Entry# 286623         Tags   Past Edits
The train rake that derailed at Kanpur on Sunday , killing 148 passengers, had undergone intensive maintenance at Western Railway's Lower Parel workshop some 45 days before the accident.
Several officials involved in maintenance of the rake at the workshop fear that the adverse findings could lead to severe punishment.
A senior official said, “The rake belonged to Western Railway even though it plied between Indore and Patna. While 14 coaches got derailed, it is not clearly established whether the accident was a result of track failure. There is a possibility that a
...
more...
defect in a coach, axle or wheel set may have led to its derailment, or perhaps a combination of multiple factors.“
Officials associated with the Lower Parel workshop such as the chief rolling stock engineer, coaching, and others will depose before the commission of railway safety , which will pose questions about the maintenance practice. The workshop undertakes maintenance of around 1,500 ICF and LHB coaches every year. Safety of train operations is dependent on proper maintenance of tracks, rolling stock and railway assets. These are required to be maintained and replaced at regular intervals for smooth and safe running of trains. When a rolling stock is sent to the workshop, a pre-inspection is carried out by the inspection team. Based on this pre-inspection, all major and minor sub-assemblies of rolling stock are repaired or replaced. The inspection also includes an ultrasonic test to detect cracks and a wheel's profile.
A senior official said, “Even though the minister of state has blamed a rail fracture, other evidence will have to considered, including the statement given by passengers who travelled in the ill-fated rake.“
Sources said some passengers, especially those from the S-1 coach, had complained of an unusual sound emanating as soon as the train moved out of Indore. Some also complained at Jhansi but many thought it fit to tackle the problem at Kanpur.
The official said, “The coach should have been detached soon after the complaints came in. Perhaps a defect in the coach, wheel or axle could have led to the derailment.“
At the intermediate stations, the problem could not be tracked as the rake could not be inspected thoroughly in the absence of a pit line on a running track.
Senior divisional mechanical engineer (carriage and wagon) Navaid Talib, divisional engineer M K Mishra, senior section engineer Ambika Ojha, section engineer Iswar Das and senior section engineer Sushil Kumar Gupta were suspended for dereliction of duty while the DRM of Jhansi division S K Aggarwal was transferred.

1 posts are hidden.

  
1792 views
Nov 24 2016 (11:09)
Rail Premi   75 blog posts
Re# 2069610-2            Tags   Past Edits
Central railway zone is worst in all department....sab kaam chor hai....

  
2116 views
Nov 24 2016 (11:24)
❤ WAP7 ❤~   6665 blog posts   843 correct pred (67% accurate)
Re# 2069610-3            Tags   Past Edits
Hello... CR Kahan se aa gya bhai??? Gt ur information correct before commenting anythg... Lower Parel is WR not CR.. Parel is CR...

  
2061 views
Nov 24 2016 (11:26)
Rail Premi   75 blog posts
Re# 2069610-4            Tags   Past Edits
Yes..ur right...main samza mantunga

  
2287 views
Nov 24 2016 (11:33)
Golgumbaz exp via Gadag Yalvigi new line~   4307 blog posts   325 correct pred (69% accurate)
Re# 2069610-5            Tags   Past Edits
WR HQ should get shifted from Mumbai to Ahemdabad or Vadodara for better focus and maintenance of CR and WR at different locations.

2 posts are hidden.
  
Rail News
0 Followers
2189 views
Other News
Nov 20 2016 (12:20)   Sleeper & general coaches to have more mobile charging points

Southern Railway^~   197 news posts
Entry# 2065866   News Entry# 286155         Tags   Past Edits
Catering to the growing demand of mobile users, Railways has taken steps for providing more mobile charging points in sleeper and unreserved general class coaches to help passengers.
"Earlier, there were only eight mobile charging points in a coach. However, in keeping pace with the changing times, we have decided to increase the number of sockets to 18 as the use of mobile phone and laptop have gone up considerably," said a senior Railway Ministry official.
So far, 7977 Sleeper coaches and 4634 general coaches have been provided with 18 mobile charging
...
more...
points per coach. All AC coaches have already been equipped with sufficient mobile charging points
Enhancing passenger amenities, railways have equipped many major stations with WiFi facility. The facility is already operational at many stations including Bhubaneswar, New Delhi, Mumbai, Howrah, Bangalore, Chennai among others.

3 posts are hidden.

  
2904 views
Nov 20 2016 (12:45)
Rail Premi   75 blog posts
Re# 2065866-4            Tags   Past Edits
And make it properly workable too...!!

  
2998 views
Nov 20 2016 (12:56)
prashantg077~   2220 blog posts
Re# 2065866-5            Tags   Past Edits
Well I did tweet and made it workable !!! Tht too within minutes

1 posts are hidden.
  
★★  General Travel
0 Followers
16084 views
Nov 15 2016 (08:45)   17212/Kondaveedu Express | YPR/Yesvantpur Junction (6 PFs)

Jay   105 blog posts
Entry# 2060184            Tags   Past Edits
Friends will be traveling on this train today from YPR to NDL on my way to Ahobilam. This pilgrimage will also take me to Tirupati and if time permits to Sri Kalahasti too. Hope to bring some updates whenever possible. Thanks.

40 posts are hidden.

  
1378 views
Nov 15 2016 (16:31)
Rail Premi   75 blog posts
Re# 2060184-41            Tags   Past Edits
Which line?

  
1318 views
Nov 15 2016 (16:50)
Jay   105 blog posts
Re# 2060184-42            Tags   Past Edits
SBC Gooty

109 posts are hidden.
  
Rail News
0 Followers
3104 views
Commentary/Human InterestKR/Konkan  -  
Nov 14 2016 (10:14)   Konkan Railway invites Composite Open Tenders for Railway Electrification of its entire Route

rdb*^   131664 news posts
Entry# 2059256   News Entry# 285613         Tags   Past Edits
Konkan Railway invites Composite Open Tenders ( Electrical traction, S&T and civil works combined) for Railway Electrification of its entire Route ( 970 TKM).Work is divided in two section.
Section -1 is from Roha (excl.) to Verna(excl.) -582 TKM, estimated cost Rs.362.86 Cr. Click here for NIT of Section-1.
Section -2 is from Verna (incl.) to Thokur (incl.) -388 TKM, estimated cost Rs.249.65Cr. Click here for NIT of Section-2.
Pre-bid
...
more...
conference scheduled on 18th November 2016, Tenders due to open on 15th December 2016.
Last Updated - Nov 2016
Home| Screen Reader Ac
click here

1 posts are hidden.

  
1750 views
Nov 14 2016 (11:10)
Rail Premi   75 blog posts
Re# 2059256-2            Tags   Past Edits
This is great news.....

8 posts are hidden.
Page#    63 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Aug 30
Trains with ARP 15 Dep on: Mon Sep 4
Trains with ARP 30 Dep on: Tue Sep 19
Trains with ARP 120 Dep on: Mon Dec 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.