Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Aug 22, 2017 09:38:25 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Aug 22, 2017 09:38:25 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ashutosh Singh
Page#    45 Blog Entries  next>>
  
General Travel
0 Followers
1711 views
Jul 29 2017 (11:07)   MLDT/Malda Town (7 PFs)

Rajasthan must gt 15000 crore for Railwy developmn^~   84552 blog posts   5303 correct pred (78% accurate)
Entry# 2365464            Tags   Past Edits
Katihar Malda electric line #CRS soon.
.
Confirmed by KIR DRM

18 posts are hidden.

  
1159 views
Jul 30 2017 (11:50)
Ashutosh Singh   61 blog posts
Re# 2365464-29            Tags   Past Edits
Here malda means old malda junction OMLF the area under NFR and it's true that all work related to electrification is complete according to press release between KIR-OMLF it's energization was to happen in April itself but was delayed due to non completion of substations & sadly it's Still not completed .
Even the section between old malda junction to singhabad is complete according to the press release by NFR.

  
1143 views
Jul 30 2017 (12:09)
Anupam Sarkar   6150 blog posts   42395 correct pred (87% accurate)
Re# 2365464-30            Tags   Past Edits
This PR was posted by me in March /blog/post/2202505
At that time there was no electrification happening even at Malda outer, even today I have clear idea of the fact that there is no wiring done at Malda station itself.
FYKI :
1. Malda station is not in the electrification project itself of NFR, it is under ER RE office Kolkata, it
...
more...
will be electrified around the end of PKR-MLDT electrification project, so those who are talking about this, they themself don't have any idea of that.
2. KIR-OMLF section CRS is still pending, untill it is completed, there is no possibility of energization with 25KV As per my knowledge, KDPR station is still under wiring, and sub stations are also not completed.
3. No electrification project is complete, unless CRS inspection PR arrives.

3 posts are hidden.
  
Pic Upload
0 Followers
1622 views
Jun 12 2017 (15:00)   BTI/Bathinda Junction (7 PFs)

rohitjoshi1289   18 blog posts
Entry# 2317370            Tags   Past Edits
Update station pic of bathinda junction bti NR Division ambala

1 posts are hidden.

  
1254 views
Jun 12 2017 (23:55)
Ashutosh Singh   61 blog posts
Re# 2317370-2            Tags   Past Edits
No sign of electrification at BTI stn.

  
1208 views
Jun 13 2017 (21:37)
SGNRTPJ Humsafar Express 14715   114 blog posts
Re# 2317370-3            Tags   Past Edits
Poles have been installed upto Rampuraphul station. And material (sleepers etc.) for doubling of RBR section has also reached at most of the intermediate stations. I saw it on Sunday.

  
487 views
Jul 22 2017 (16:52)
Ashutosh Singh   61 blog posts
Re# 2317370-4            Tags   Past Edits
From kot fateh to bathinda jn is single line?
  
General Travel
0 Followers
584 views
Jul 17 2017 (10:47)   FD/Faizabad Junction (5 PFs)

Ashutosh Singh   61 blog posts
Entry# 2354971            Tags   Past Edits
When will the electrification work start at #faizabad .
Still the old signalling system prevalent here.
This can be an alternative route to LKO.

  
487 views
Jul 17 2017 (14:34)
The Legendary Godan Express~   501 blog posts   40 correct pred (54% accurate)
Re# 2354971-2            Tags   Past Edits
Is route ka sudhar bhaut jaroori h alternative route nahi raha ab ye important trains chalti h aur vo bhi pack ho kar

  
492 views
Jul 17 2017 (14:34)
😍Second Journey In Mahamana😍~   3328 blog posts
Re# 2354971-3            Tags   Past Edits
NR focussing more on the LKO-SLN-BSB route as Wahi uska main route hai HWH wala....and also RBL-PBH route so as to get proper and fast connectivity to ALD..

  
489 views
Jul 17 2017 (14:39)
rdb*^   31718 blog posts   384900 correct pred (81% accurate)
Re# 2354971-4            Tags   Past Edits
AY-FD are on high priority of Govt..
RM coming on 28th to AY
  
General Travel
0 Followers
1562 views
Jun 23 2017 (12:33)   12391/Shramjeevi SF Express (PT) | RGD/Rajgir (3 PFs)

Rajasthan must gt 15000 crore for Railwy developmn^~   84552 blog posts   5303 correct pred (78% accurate)
Entry# 2330203            Tags   Past Edits
Rajgir to Bakhtyarpur is now ready for CRS

2 posts are hidden.

  
1360 views
Jun 23 2017 (21:54)
Ashutosh Singh   61 blog posts
Re# 2330203-3            Tags   Past Edits
Any official notification has arrived.

  
1346 views
Jun 23 2017 (21:56)
Ashutosh Singh   61 blog posts
Re# 2330203-4            Tags   Past Edits
Is there any progress between range to tilaiya?

  
1320 views
Jun 24 2017 (19:17)
Rajasthan must gt 15000 crore for Railwy developmn^~   84552 blog posts   5303 correct pred (78% accurate)
Re# 2330203-5            Tags   Past Edits
See proof of official .. trial run done.

  
1318 views
Jun 24 2017 (19:18)
Rajasthan must gt 15000 crore for Railwy developmn^~   84552 blog posts   5303 correct pred (78% accurate)
Re# 2330203-6            Tags   Past Edits
Iam not local member so I don't have idea about that...
  
★★★  Rail Fanning
0 Followers
9034 views
Mar 02 2017 (18:42)   NJP/New Jalpaiguri Junction (8 PFs)

Pran Pratim Ghosh   23613 blog posts   100323 correct pred (75% accurate)
Entry# 2183579            Tags   Past Edits
Electrification progress btwn NJP KNE.
Up line - poles erection, wiring done.
dn line poles erection going on.
.
26/2/17

25 posts - Mar 2017

47 posts are hidden.

  
473 views
Apr 23 2017 (21:41)
Ashutosh Singh   61 blog posts
Re# 2183579-52            Tags   Past Edits
What is the status of PKR-MLDT electrification anybody residing there pliz update with pictures. Is it possible to complete by 31st March 2018.

  
405 views
Apr 23 2017 (21:51)
Pran Pratim Ghosh   23613 blog posts   100323 correct pred (75% accurate)
Re# 2183579-53            Tags   Past Edits
as i crossed at night, could see or take pics of that sec.
as per info by some other members, it will take some time. not likely to complete by march '18.

1 posts are hidden.

  
442 views
Apr 23 2017 (23:30)
Baaz SGUJ WDP4~   1118 blog posts   43 correct pred (62% accurate)
Re# 2183579-55            Tags   Past Edits
Adding to that, some large scale redevelopment works are proposed for KNE and NJP. BOth these stations are supposed to have two new platforms and some changes along turn arounds.

19 posts are hidden.

  
825 views
Jun 23 2017 (21:42)
Ashutosh Singh   61 blog posts
Re# 2183579-75            Tags   Past Edits
If u take example of Bhramaputra mail then after KIUL it's unelectrified & carries diesel loco upto DBRG.
It's difficult to provide details as it will be very lenghty. KIUL-NJP is doubled with a tunnel work just after JMP & BGP-PPT single line but after that there is doubled line upto RQJ. After that there are patches of doubled line & work is going on upto LMG. After LMG no doubling work is sanctioned or going on.
As for electrification, work will only start after doubling is completed between KIUL-PPT. Electrification
...
more...
work is going on between barharwa-NJP to be completed first there after Upto GHY. After GHY no electrification work is sanctioned.

  
755 views
Jun 23 2017 (22:40)
highvoltageeee2k3~   293 blog posts
Re# 2183579-76            Tags   Past Edits
Awesome update thanks.
Page#    45 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Sep 1
Trains with ARP 15 Dep on: Wed Sep 6
Trains with ARP 30 Dep on: Thu Sep 21
Trains with ARP 120 Dep on: Wed Dec 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.