Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 22:08:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 22:08:14 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by mishra travels bhopal~
Page#    119 Blog Entries  next>>
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Tue Jun 14, 2016 @ 07:45
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 28
Travel: BBS/Bhubaneswar   to   BNC/Bengaluru Cantt. (Bangalore)   |   1581 km / 2991 km
12510/Guwahati - Bengaluru Cantt. (Kaziranga) SF Express (PT)
Entry# 1893440

PNR: 615-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 13 2016 (21:03)
Passenger 1: Waitlist# 2 (Booking Status: W/L 17,RLGN)
Total Fare:  1695
Chart PREPARED
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 14 2016 (14:52)
Passenger 1: Waitlist# 2 (Booking Status: W/L 17,RLGN)
Total Fare:  1695
Chart PREPARED

  
2511 views
Jun 13 2016 (21:14)
Jai Ho ™^~   12214 blog posts   121227 correct pred (75% accurate)
Re# 1893440-2            Tags   Past Edits
Is it any Railway helpline no?
If not, pls dont post publicly :)
Ty...
  
★★★  Rail Fanning
0 Followers
9811 views
Jun 08 2016 (20:09)   12331/Himgiri SF Express (PT) | SLN/Sultanpur Junction (3 PFs) | HWH/WAP-7/30457
 

Harsh*^~   28575 blog posts   75903 correct pred (77% accurate)
Entry# 1885937            Tags   Past Edits
👌💐 SURPRISE !!!💐👌
Here comes the brand new milky white HWH WAP 7 (HOG) Himgiri Express Scorches Sultanpur outer at Good Speed !!
HWH (HOWRAH) WAP 7 30457 First time with Legendry Himgiri Express Sizzles Sultanpur Outer in hazy sunshine bang on time with Howrah's HOG equipped Brand New Wap 7
You Tube Link click here
About
...
more...
HOG Technology:-
HOG means Head on Generator!!!
this is actually used in most emergency purposes!!! only a 3 phase loco can transfer the power from over head wires to the EOG's n to the coaches!!!
After extensive trials and improvements on the design, commercial service of HOG scheme involving one 3 phase electric loco and 12 passenger coaches & two power cars have been started from 21.02.2011 between New Delhi-Kalka & back in train no. 12005/’06 NDLS-KLK Shatabdi Express. In this scheme the power supply is received directly from locomotive through couplers and DG sets kept off to be used during emergency only. The supply from locomotive is 750V, 3 phase.
No noise (DG sets will not be used)
• Saving of HSD oil (about 700 Ltrs per round trip)
• Economical (saving of about 18,000.00 per round trip)
• Pollution free environment at Rly. station etc. (No smoke as DG sets will not be used)
this isnt introduced everywhere as of now!!! wil take sometime to hit the tracks!!!!
mostly few WAP-7's n WAP-5's have this 3 phase system as of now!!!!
Location:- Sultanpur
#HDP

6 posts are hidden.

  
2066 views
Jun 09 2016 (09:36)
आज़मगढ़ लखनऊ इण्टरसिटी एक्सप्रेस*^~   5561 blog posts   8049 correct pred (86% accurate)
Re# 1885937-8            Tags   Past Edits
Means?

5 posts are hidden.
  
Predictions: 47
confirm: 39
rac: 0
wl: 8
Journey: Sat Jun 04, 2016 @ 20:32
Class: Sleeper - SL
Travel: RKB/Raikabag Palace Junction   to   HWH/Howrah Junction   |   1814 km / 1816 km
12308/Jodhpur - Howrah SF Express (PT)
Entry# 1877902

Posted by: mafijul8873662476~   0 blog posts   3286 correct pred (64% accurate)
PNR: 264-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 03 2016 (11:10)

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 04 2016 (19:34)
Passenger 1: S1,8 [SU]/Coach Position:13 (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Full PNR Status History (20 statuses)
Status as of: Jun 04 2016 (16:31)
Passenger 1: S1,8 [SU]/Coach Position:13 (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (08:22)
Passenger 1: Waitlist# 5 (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (07:03)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (06:53)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (05:17)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (05:06)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (04:59)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (04:57)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (04:33)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (04:32)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (04:04)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (03:27)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (03:16)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (03:12)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (02:23)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (02:23)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (02:23)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 04 2016 (02:23)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart PREPARED

Status as of: Jun 04 2016 (01:27)
Passenger 1:  (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared

Status as of: Jun 03 2016 (12:08)
Passenger 1: Waitlist# 5 (Booking Status: W/L 8,CK)
Total Fare:  895
Chart NOT Prepared


  
5694 views
Jun 04 2016 (08:37)
mishra travels bhopal~   146 blog posts   313 correct pred (53% accurate)
Re# 1877902-1            Tags   Past Edits
jaldi se apni ticket cancil karo woh hi thik hai ...best of luck

  
5244 views
Jun 04 2016 (09:39)
FC Barcelona   225 blog posts   11706 correct pred (97% accurate)
Re# 1877902-2            Tags   Past Edits
Bhai cncl kyon krna? Abhi PT ki 29 seats bachi hui he

  
5078 views
Jun 04 2016 (12:43)
डस्टर द राॅयल^   850 blog posts   43370 correct pred (83% accurate)
Re# 1877902-3            Tags   Past Edits
Will Confirm

2 posts are hidden.
  
Predictions: 5
confirm: 0
rac: 0
wl: 5
Journey: Fri Jun 03, 2016 @ 01:07
Class: AC 2-tier - 2A
Travel: JMP/Jamalpur Junction   to   JAT/Jammu Tawi   |   1728 km / 1781 km
15097/Amarnath Express
Entry# 1874166

PNR: 635-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 01 2016 (06:52)
Passenger 1: Waitlist# 16 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 17 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 18 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 19 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.
Posted thru RailCal

Latest Status as of: Jun 03 2016 (14:19)
Passenger 1: A1,13 [LB]/Coach Position:21 (Booking Status: W/L 34,HO)
Passenger 2: A1,14 [UB]/Coach Position:21 (Booking Status: W/L 35,HO)
Passenger 3: Waitlist# 12 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 13 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart PREPARED

Full PNR Status History (7 statuses)
Status as of: Jun 02 2016 (19:59)
Passenger 1: A1,13 [LB]/Coach Position:21 (Booking Status: W/L 34,HO)
Passenger 2: A1,14 [UB]/Coach Position:21 (Booking Status: W/L 35,HO)
Passenger 3: Waitlist# 12 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 13 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart PREPARED

Status as of: Jun 02 2016 (09:46)
Passenger 1: Waitlist# 12 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 13 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 14 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 15 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jun 02 2016 (09:01)
Passenger 1: Waitlist# 14 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 15 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 16 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 17 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jun 02 2016 (01:37)
Passenger 1: Waitlist# 15 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 16 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 17 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 18 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jun 01 2016 (14:53)
Passenger 1: Waitlist# 16 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 17 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 18 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 19 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jun 01 2016 (13:32)
Passenger 1: Waitlist# 16 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 17 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 18 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 19 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jun 01 2016 (06:49)
Passenger 1: Waitlist# 16 (Booking Status: W/L 34,GNWL)
Passenger 2: Waitlist# 17 (Booking Status: W/L 35,GNWL)
Passenger 3: Waitlist# 18 (Booking Status: W/L 36,GNWL)
Passenger 4: Waitlist# 19 (Booking Status: W/L 37,GNWL)
Total Fare:  0
Chart NOT Prepared


  
2365 views
Jun 02 2016 (21:23)
mishra travels bhopal~   146 blog posts   313 correct pred (53% accurate)
Re# 1874166-2            Tags   Past Edits
dono ke baare mai kuch socha hai
TRIP HAS ENDED.
Blog  Time-Table

  
4322 views
Jun 02 2016 (21:21)
mishra travels bhopal~   146 blog posts   313 correct pred (53% accurate)
Re# 1796206-2            Tags   Past Edits
ha ha ha... funny
Page#    119 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.