Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 17, 2017 23:36:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 17, 2017 23:36:03 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Arushsharma991~
Page#    96 Blog Entries  next>>
  
Poll
0 Followers
3870 views
21 votes
Jan 16 2017 (18:39)   KSJ/Kasganj Junction (6 PFs)

AkashNER~   641 blog posts   69 correct pred (64% accurate)
Entry# 2129430            Tags   Past Edits
How many of my dear friends agree with the fact that it's high time that measures must be taken to 'DE-CONGEST' the overloaded section of CNB-NDLS (via ALJN), by constructing an 'ALTERNATIVE ROUTE' via CNB-Farrukhabad-Kasganj-Atrauli-Khurja-NDLS.
Presently, Kanpur-Kasganj section is SINGLE DIESEL, and could be utilized in future to cater NDLS bound traffic from CNB and vice-versa. It was included in the rail budget of 2012-13 (if I am not wrong), but never acted upon.
KINDLY, support your answer with comments.
YES. this particular alternate route must be considered and would be be helpful90%19
NO. the situation will not change much0%0
Any other views (in comments)10%2

19 posts are hidden.

  
233 views
Jul 30 2017 (15:29)
Arushsharma991~   204 blog posts
Re# 2129430-20            Tags   Past Edits
Survey is underway to connect MAH with KNJ...If implemented along with the KSJ-ALJN link it will provide the shortest route(ALTERNATIVE) for both CNB-NDLS as well as LKO -NDLS ...

2 posts are hidden.

  
ohh. jst read /news/post/293342
.
if Dalmau - Fatehpur is talked about, it has been in news since over a decade of years. but due to high construction cost of bridge of ganga ji nothing materialized.
.
for
...
more...
d first time, i m hearing KJN* - MAH.
.
however neither of above routes sounds promising to me as they arent huge populous town. also, they dont have industrial belts along with them.
.
to me, extension of MAH to north an connecting it FBD line sounds attractive and promising which wud connet to /blog/post/912416
also same line sud hav a diversion connecting to SPN. map attached.
.
share ur views. :-)
moving to /blog/post/2366775

2 posts are hidden.

  
491 views
Jul 30 2017 (22:14)
Arushsharma991~   204 blog posts
Re# 2129430-27            Tags   Past Edits
I m not sure abt Fatehpur-Dalmau link but the second one has huge potential as it can provide an ALTERNATIVE for both CNB -NDLS nd LKO - NDLS provided that KSJ shud be connected with ALJN...
Secondly,the route u proposed appears to be more useful as it will provide the SPN link nd CNB bound trains can use the route for BE connectivity as well.
But I have always found IR smwht stingy😑 and the route u proposed requires more land acquisition and construction cost..

2 posts are hidden.
  
General Travel
0 Followers
1741 views
Jul 25 2017 (13:12)   NDLS/New Delhi (16 PFs)

Dream LHB Gomti Exp soon😎😍~   3158 blog posts
Entry# 2362270            Tags   Past Edits
Leaving Agartala Apart which will surely get a Rajdhani Express in quick time I think...
Comment which Indian States (Cities) should also have a Rajdhani Express..
PS- Please don't say PNBE needs one more..😂😂😂

9 posts are hidden.

  
304 views
Jul 25 2017 (16:06)
Arushsharma991~   204 blog posts
Re# 2362270-10            Tags   Past Edits
Itna kya rajdhani k piche rote ho😃😃...ek unofficial h to LKO k ps...seat km pd rhi h kya😝
Kaho to 2-3 bhej de wahan😎

4 posts are hidden.

  
339 views
Jul 25 2017 (16:31)
Dream LHB Gomti Exp soon😎😍~   3158 blog posts
Re# 2362270-15            Tags   Past Edits
Bhai mjhe nhi chahiye..😁😁✌ already LKO has one..haha..mein toh un bhai ka anshwr derha tha that agar UP rajdhani hui knhi toh atleast state capital Ko toh rkhlo usme..baki hmko nhi chahiye..😂😂
Yha toh jab station pahucho NDLS ki train mil hi jati hai..thdi dermein...

14 posts are hidden.
  
★  Info Update
0 Followers
2366 views
Jul 22 2017 (10:35)   05059/Lalkuan - Kanpur Anwarganj Intercity Special | CPA/Kanpur Anwarganj (3 PFs)

Prakhar*^~   4307 blog posts   414 correct pred (81% accurate)
Entry# 2359670            Tags   Past Edits
05059/60 Lal Kuan Junction - Kanpur Anwarganj - Lal Kuan Junction (Tri-weekly) Special
.
Dainik Jagran dated 22 July 17

3 posts - Sat Jul 22, 2017

  
732 views
Jul 22 2017 (23:45)
KK   43 blog posts
Re# 2359670-4            Tags   Past Edits
Agar ye route new train ke liye ok hai then what about Kanpur-Amritsar Exp. & Kanpur-Kathgodam Garibrath route diversion.....

  
617 views
Jul 23 2017 (11:11)
Arushsharma991~   204 blog posts
Re# 2359670-5            Tags   Past Edits
I don't think that diversion is going to hppn bcoz it will add another 70 kms to the route and a reversal at KSJ instead of BLM...

1 posts are hidden.

  
1753 views
Jul 24 2017 (12:24)
Prakhar*^~   4307 blog posts   414 correct pred (81% accurate)
Re# 2359670-7            Tags   Past Edits
there has been several news regarding doubling as well as electrification of CNB - FBD - KSJ but it didnt mention whether CPA - MDA can be doubled or not.
just by appearance, it seems doubling this 16km section parallel to GT road (N34, old no NH91) might be a challenge.
.
But i believe, if IR, PWD, #KPMRC and local authorities
...
more...
work hand in hand to remove encroachment and double the track simultaneously with 4 Lane of GT road and metro been planned, things might go well.
ofcourse, political willingness is required. :-)
.
22445 CNB-ASR (old14153/54) sud b rerouted as it was announced as 18153/54 CNB ASR via FBD KSJ BE only. it wil fetch good pax too.
.
12209/10 cnb kgm cnb garib rath is a NR train vich is running as per announced route. also it is fully AC train and running it fbd route wud loose revenue.

  
1614 views
Jul 24 2017 (17:49)
Arushsharma991~   204 blog posts
Re# 2359670-8            Tags   Past Edits
Definitely political willingness is required here along with the attention of NER.
I have read in a news article that an elevated section is being surveyed over the present tracks but the elevated metro planned over GT Road may turn down the plan of RLY's.

  
1561 views
Jul 24 2017 (22:10)
Prakhar*^~   4307 blog posts   414 correct pred (81% accurate)
Re# 2359670-9            Tags   Past Edits
Elevated tracks for this section, I heard in 2009. Hua kch nhi.
.
Actually, mda - pnk new line proposal has been surveyed but to IR, they didn't expect it to be fruitful. So more likely, dhande baste mei woh yojana.
Both NER n NCR have denied for it. They r also worried abt d expensive land cost...

1 posts are hidden.
  
General Travel
0 Followers
3505 views
Jul 20 2017 (21:35)   NDLS/New Delhi (16 PFs)

Dream LHB Gomti Exp soon😎😍~   3158 blog posts
Entry# 2358237            Tags   Past Edits
So here I am taking about two routes from the National Capital NEW DELHI (NDLS) to MUGHAL SARAI (MGS)
1st Route- NDLS-ALJN-CNB-ALD-MGS (NCR)
2nd Route- NDLS-BE-MB-LKO-SLN-BSB (NR)
Both have there on strategic importance and both cater huge amount of traffic loads in terms of freight and passengers.
So
...
more...
comment here for the trains you think jinhe galat route pe rkha gya hai..Means the trains u think jo Abhi Route 1st pe hai but use 2nd route pe hona chahiye cuz wo route use suit nhi krra hai....ya trains Jo abhi 2nd route pe run krri hai and use aapke hisab se 1st wale pe hona chahiye...
It's purely Ur views..

7 posts are hidden.

  
361 views
Jul 20 2017 (22:40)
Arushsharma991~   204 blog posts
Re# 2358237-8            Tags   Past Edits
Sapt kranti via old route

89 posts are hidden.
  
General Travel
0 Followers
336 views
Jul 15 2017 (12:23)  

Arushsharma991~   204 blog posts
Entry# 2353202            Tags   Past Edits
does anyone one know about the metre gauge trains from cpa to tanakpur and pilibhit...what was the route used by them??
Page#    96 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 27
Trains with ARP 15 Dep on: Fri Sep 1
Trains with ARP 30 Dep on: Sat Sep 16
Trains with ARP 120 Dep on: Fri Dec 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.