Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Aug 19, 2017 17:22:18 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Aug 19, 2017 17:22:18 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Varun Iyer
Page#    2 Blog Entries  
  
★  Rail News
0 Followers
1993 views
Commentary/Human InterestCR/Central  -  
Dec 22 2014 (08:59)   Thane-CST all set to run on alternating current
 

Addicted To IRI®♔®~   73 news posts
Entry# 1315958   News Entry# 205874         Tags   Past Edits
Central Railway on the night of Saturday and wee hours of Sunday gave finishing touches to one of its longest-running electrical engineering works as the entire section between Thane and CST was tested to run on 25,000 Volt Alternating Current (AC).
The slow lines between CST and Mumbra and the fast lines between CST and Thane currently run on 1500 Volt Direct Current, which is obsolete and also completely out of sync with the rest of the Indian Railways network which runs on 25,000 Volt AC traction.
When was work undertaken?
According
...
more...
to officials, the test-charging took place between 11pm on Saturday and 6am on Sunday and went off smoothly. They expect the Commissioner of Railway Safety to give the all-clear to the project very soon. The report has been sent to CRS Chetan Bakshi, said CR officials. If the go-ahead is obtained for the project, then all CR's lines except Harbour line will run AC traction. Harbour line would take at least another couple of years, said officials.
What was the scale of operation?
"It is a huge process and involved more than 600 people. All the electrical systems that run on DC are switched off and disconnected and then their AC counterparts are connected. The power is then charged and trains- 2 AC locals and AC engines in this case- were run to check if everything was in place. It turned out as expected," said the official.
How was the testing done?
The block started at around 11:45pm on Saturday as all local trains running on the circuit either had to be retired to the stabling lines in the carshed or had to cross the CST-Thane stretch. Once this was achieved the test runs began.
"The tests took place between 2:30am and 3:30am. Then all the AC equipment was switched off, disconnected and their DC counterparts re-attached to the system. By 5:55am, CR was back to the situation that prevailed before the test-charging began," said the official.
When will CR trains run on alternating current?
CR will require nine additional trains running on AC once the switch is made. Of this, CR officials said, five rakes are in place and another four should be handed over by WR in the next few days. "Then we are ready to begin the day we get permission from the CRS," said an official.
Mega savings
Officials believe the switch DC-AC switch between CST and Thane will save CR at least Rs 100 crore in power bills every year.
CR runs about 1,660 local services, 410 long-distance trains and 346 freight trains every day and the electricity bill for the year 2013-14 was Rs 1432 crore. The usage was 1,890 million units.
After conversion of Kalyan-Thane section, CR has saved Rs 112.74 crore (25.8 million units) for the financial year ending March 2014
Other benefits
With duality of AC and DC gone, a single system will reduce train failures
Long-distance trains will save on time as they don't have to change from DC to AC while exiting CR's Mumbai network
AC will integrate CR's Mumbai division with the rest of the Indian Railways network. Lower maintenance of overhead wires and other structures

11 posts are hidden.

  
1247 views
Jan 01 2015 (22:12)
Varun Iyer   3 blog posts
Re# 1315958-15            Tags   Past Edits
mrvc should have contued with siemens emu rakes instead of bombardier emu rake to avoid wastage of precious us dolar and purchase siemens emu rakes with darker shade of violet. 72 emu rake from siemens will solve the problem for dc to ac conversion on mumbai cst thane and harbour line.

  
1153 views
Jan 01 2015 (22:15)
Varun Iyer   3 blog posts
Re# 1315958-16            Tags   Past Edits
CR AND WR SHOULD PURCHASE SIEMENS EMU RAKES INSTATEAD OF BOMBARDIER EMU

  
1133 views
Jan 01 2015 (22:19)
Addicted To IRI®♔®~   16065 blog posts   632 correct pred (62% accurate)
Re# 1315958-17            Tags   Past Edits
Its Depend on MRVC
  
General Travel
0 Followers
395 views
Jan 01 2015 (22:03)   CSTM/Mumbai CSM Terminus (18 PFs)
 

Varun Iyer   3 blog posts
Entry# 1327401            Tags   Past Edits
cr and wr should continue buying siemen's mrvc emu rakes instead of bombardier emu rakes to avoid delay manufacturing for 72 new trains under mutp 2.
if siemen's rakes with ac traction operations only to delay in dc to acconversion on mumbai cst - thane section plus harbour line as well.
Page#    2 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Aug 29
Trains with ARP 15 Dep on: Sun Sep 3
Trains with ARP 30 Dep on: Mon Sep 18
Trains with ARP 120 Dep on: Sun Dec 17

  
  

Top Trending Posts

2379121  11VaRuन⛱
2384582  8See Yen Bee~
2384228 ★★ 15VaRuन⛱
2379187  11narendrasharma~
2384237  10জয়দীপ JOYDEEP जय़दी...
2232552 ★★★ 33Foamer~
2382935 ★★ 13©®™१२४३९ राँची राजधा...
2384672  102nd LHB journey^~
2171450 ★★ 14SPJ~
2383311 ★★★ 35VaRuन⛱
2383870  8★★20 Jun My joining ...
2380625 ★★★ 32©®™१२४३९ राँची राजधा...
2384230  7कर्नाटक सम्पर्क क्रा...
2384252 ★★★ 26The great shaktipunj...
2384156  7❤️Apna❤️Munger❤️~
2384539  8IR no more Safe^~
2384022 ★★ 14☆गोंडा इलेक्ट्रिक शे...
2384531  9जोहार झारखंड🙏😊^~
2301869  9WDP4
2383581 ★★ 1814715 Sri Ganganagar...
2382600 ★★ 14⭐ ⭐ ⭐ Telangana Expr...
2380106  8दानापुर वाले रेलफैन^...
2384540  6When will I get chan...
2380004 ★★ 16दानापुर वाले रेलफैन^...
2381677 ★★ 18दानापुर वाले रेलफैन^...
2381690  9दानापुर वाले रेलफैन^...
2381717 ★★ 15दानापुर वाले रेलफैन^...
2382479 ★★ 13दानापुर वाले रेलफैन^...
2382833  9दानापुर वाले रेलफैन^...
2382889 ★★ 14दानापुर वाले रेलफैन^...

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.