Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Aug 23, 2017 17:50:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Aug 23, 2017 17:50:13 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by N S Reddy
Page#    4 Blog Entries  
  
General Travel
0 Followers
620 views
Dec 29 2015 (23:42)  
 

N S Reddy   9 blog posts
Entry# 1695733            Tags   Past Edits
GNT should have a direct train(Day journey) towards NLR. Passengers in this area suffering a lot since the introduction rail services before independence( before 1947) as they are deprived of this small facility of direct day time train from GNT towards NLR/GDR.
Lot of developments in and around GUNTUR like BG conversation of all meter gauge lines,formation of GUNTUR DIVISION etc. But till date no direct train between GNT...GDR(day journey). I didn't this is an uphill task for Railway Authorities
...
more...
N S Reddy

  
580 views
Dec 29 2015 (23:54)
17255 NS HYB EXP with GYWDP4D   882 blog posts   180 correct pred (72% accurate)
Re# 1695733-1            Tags   Past Edits
I think sc tpty intercity via gnt gdr will be perfect
  
Dec 13 2015 (17:46)  
 

N S Reddy   9 blog posts
Entry# 1678725            Tags   Past Edits
Guntur is one of the main junction in SCR also Divisional HQ of GUNTUR DVN and Capital District. of Andhra Pradesh.
As on today this junction do not have a day journey connectivity(Direct train from GNT)towards Ongole/Nellore and beyond. There is not even a single passenger train during day time (0500 hrs - 1700 hrs) to cater the earnest need of passengers in and around Guntur . For short journey between Guntur..OGL ,GNT..NLR and enroute stations passengers are at mercy of Road journey only.
...
more...
KEEPING in view the major Daily traffic flow in this route,Railway Authorities will realize the earnest need of introducing a direct passenger train(Express/Pass) between GNT..NLR/TPTY during day time.
N S Reddy

  
Dec 19 2015 (17:26)
Guest: 7131ce16   show all posts
Re# 1678725-1            Tags   Past Edits
genuie demand one passenger and ICE should be there
gnt-nlr fast passenger and gnt-tpty ICE
  
Rail Budget
0 Followers
2882 views
Dec 08 2015 (18:27)  
 

N S Reddy   9 blog posts
Entry# 1674471            Tags   Past Edits
Restoration of 10 km lengthabondened BG line between Vejandla(in GNT..TEL SECTION). and Tsundur(TEL-BPP section) is very much need of the day as it opens the doors for putting GNT/NGNT station on the main line. More express trains can be diverted on this route via NGNT/GNT stations reducing traffic congestion on TEL junction for Goods trains also.
Keeping in view the growing importance of Guntur City(Capital District of Andra Pradesh) RESTORATION of this small stretch will be a vital in GNT Division of SCR.
...
more...
Hope our Political leaders and all concerned will put their BEST EFFORTS to restore VEJANDLA--TSUNDUR line.
N S Reddy

14 posts - Tue Dec 08, 2015

  
581 views
Dec 08 2015 (19:57)
The train not taken~   2650 blog posts
Re# 1674471-15            Tags   Past Edits
But there isn't any real benefit from this bypass. TEL is not a very busy junction and the distance saved is also barely 15 km. Besides, TEL is a good transfer point for passengers to get connections to BZA instead of waiting till the train reaches Guntur, so there is no advantage of skipping TEL to save such a short distance.
Trains going from Guntur towards south do not even need a reversal at TEL, so TEL is is no way causing inconvenience to trains towards GNT. GNT -TEL doubling and MPS increase is more than enough to improve run times of several trains and increase capacity.
...
more...
The original Tsunduru-Vejendla section was also abandoned for this reason only, as SCR found no use of continuing this line as there was no scope to increase any revenue nor was it helping in providing more coverage ( as it was skipping the only major station near it ), and the freight traffic on these routes was also not much. At this point, this does not give any benefit to GNT.

1 posts are hidden.

  
1058 views
Dec 09 2015 (00:04)
N S Reddy   9 blog posts
Re# 1674471-17            Tags   Past Edits
It is not Circles Express ,it is CIRCAR Express running between COA(Kakinada Port) and Madras Beach via TEL-GNT-BZA-GDV-BVRT.
Now this train runs between COA-MS(Chennai Egmore) in the same route via TEL-NGNT-BZA-GDV_BVRT.
Till 1977 CIRCAR Express was the only train running in GNT--GDR section.
Initially this train pass through
...
more...
GNT-TEL section.
. Later only to provide a short route for CIRCAR Express, this chord line between VEJANDLA..TSUNDUR was constructed bypassing TEL junction.
During 1976 due to political pressure from then MP of TENALI,this CIRCAR Express was rerouted to run via previous route. Because of this, this chord line between VEJANDLA and TSundur was used to run only Goods trains now and then. Later on because of no traffic this chord line was abondened due to maintenance constraints.
But now the total scenario changed . Now lot of traffic in GNT- GDR section section and increasing in Geometric Progression.
Hence the restoration of this small link(10km) between VEJANDLA- TSUNDUR is very .ugh need of the day

  
989 views
Dec 09 2015 (00:21)
N S Reddy   9 blog posts
Re# 1674471-18            Tags   Past Edits
Initially it used to run via BZA-GNT-TEL only. Later on after completion of NDKD-Bibinagar route+BG conversion of GNT-MCLA route, HYB-MAS express was diverted via GNT and CIRCAR Express was routed to run through BZA- TEL direct. And again recently to was routed back to run through NGNT-TEL section

  
1005 views
Dec 09 2015 (00:47)
The train not taken~   2650 blog posts
Re# 1674471-19            Tags   Past Edits
But what will be the benefit with this short line? Bypass lines are usually constructed to bypass busy, congested stations or to avoid reversals. TEL is neither congested, nor do trains from south towards GNT need a reversal at TEL. This line will not even help decrease congestion as instead of waiting at TEL for mainline clearance, now trains will have to wait in the outer of some small station for clearance. While it does save around 30 min journey time, it is also skipping a major junction where a lot of passengers get down to transfer to other trains. I feel there is no practical benefit of skipping TEL to save 15 km.
Currently, about 34 trains
...
more...
run daily in the TEL-GNT section ( including UP and DN trains and merging weekly trains running in the same slot into one train). While that is high for a single line, it's very less for a double section. Once this line is doubled, more trains can be run on GNT-TEL without fear of congestion and once the MPS on the BZA-GNT-TEL section is increased, then run time can also be reduced.

3 posts are hidden.

  
1029 views
Dec 09 2015 (10:18)
Where r d spcls dat wr ran by using bza snsi rake~   2098 blog posts   47 correct pred (69% accurate)
Re# 1674471-23            Tags   Past Edits
Thanks fr the clarification.
I can understand ur concern is to provide GNT with much better traffic of south bound trains by providing the 10kms abandoned linkage which reduces the little round about in TEL - GNT line therfore skipping TEL. But TEL connectivity is also equally imp as it serves whole Krishna Delta. Moreover doubling of TEL-GNT and MPS increasing in BZA-GNT is already in progress , the prime motive being improving and increasing connectivity to GNT (the new capital area).
  
1 Followers
3597 views
Apr 08 2012 (12:25)   12077/Chennai Central - Vijayawada Jan Shatabdi Express
 

N S Reddy   9 blog posts
Entry# 391670            Tags   Past Edits
Diverting MAS_BZA Janshatabdi Exp via NGNT is a much awaited demand. Some more exp. trains between GDR BZA can be diverted via NGNT so that NGNT stn will become a regular passenger station.
Diversion of One super fast train towards National Capital DELHI (NDLS) is very much essential. I request our hon'ble MPs will make this demand a reality

  
2516 views
Apr 08 2012 (12:30)
Guest: 74d049b9   show all posts
Re# 391670-1            Tags   Past Edits
Its a good thing for requesting a train from GNT to NZM...
But diverting present trains via NGT is not a good move.....

  
2347 views
Apr 08 2012 (12:30)
Guest: 6060e213   show all posts
Re# 391670-2            Tags   Past Edits
Add's 1 and half hour more for 1 meagre 30 mins journey.

  
2275 views
Apr 08 2012 (15:24)
N S Reddy   9 blog posts
Re# 391670-3            Tags   Past Edits
this diversion adds only 30 mts exrea time

  
2297 views
Apr 08 2012 (15:27)
Guest: 6060e213   show all posts
Re# 391670-4            Tags   Past Edits
30 mins for each leg. TEL to NGNT and then BZA sums up more than an hour

  
2469 views
Apr 08 2012 (15:36)
bhanu teja భాను తేజ   1829 blog posts   133 correct pred (57% accurate)
Re# 391670-5            Tags   Past Edits
Developing NGNT is not a great idea.
It is not convinient to even the localites. This terminal must be used for some other purposes only.
Following should be done to reduce burden on BZA.
BZ-GNT and GNT-NDL doubling(except caves part). Then divert all YPR trains via GNT-NDL. Also Some MAQ, kerala and TN trains(when distance increase is not much). USe GNT as new
...
more...
terminal. for loco change and staff change.
Use NGNT as frieght point.

4 posts are hidden.
Page#    4 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 2
Trains with ARP 15 Dep on: Thu Sep 7
Trains with ARP 30 Dep on: Fri Sep 22
Trains with ARP 120 Dep on: Thu Dec 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.