Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 02:53:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 02:53:42 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by linu jacob
Page#    12 Blog Entries  next>>
  
1 Followers
3661 views
Feb 01 2011 (14:01)   12082/Thiruvananthapuram Central - Kannur Jan Shatabdi Express
 

Hadi*^~   2429 blog posts   51 correct pred (59% accurate)
Entry# 104323            Tags   Past Edits
I heard a news today, On friday onwards, this service is short terminated at Kottayam, Is this true? I heard this is because of commissioning of Mavelikkara - Kayamkulam 2 patch doubling?

  
2792 views
Feb 01 2011 (17:17)
linu jacob   18 blog posts
Re# 104323-1            Tags   Past Edits
May be, I have read the same in manorama, but not sure about the date.But then, where will the maintance happened?

2 posts are hidden.

  
2872 views
Feb 01 2011 (17:45)
linu jacob   18 blog posts
Re# 104323-4            Tags   Past Edits
its becose of its timing.It is very difficult to maintain its schedule while diverting via ALLP.Any way its temp arrangement and mvlk-kyj doubling may help its performance also

3 posts are hidden.
  
0 Followers
1731 views
Jan 18 2011 (11:50)   CLT/Kozhikode Main (Calicut) (4 PFs)
 

Manthal Krishnan*^~   2471 blog posts   312 correct pred (72% accurate)
Entry# 99903            Tags   Past Edits
*******Janasathabdi express via Kottayam from January 20 ********
.
Kozhikode: The Kozhikode -Thiruvananthapuram Janashatabdi Express via Kottayam will start service from January 20. The train which would begin its journey at 6.15 am from Kozhikode and reach Thiruvananthapuram by 1.45 pm. The train would start its return journey from Thiruvananthapuram at 2.20 p m and reach Kozhikode at 10 pm. The service would be for five days a week.

9 posts are hidden.

  
976 views
Jan 19 2011 (17:34)
linu jacob   18 blog posts
Re# 99903-10            Tags   Past Edits
May because of maintenance purpose .As of now there is not a maintenance felicity at CLT.So the routine maintenance will happen in TVC.

1 posts are hidden.
  
2 Followers
1585 views
Jan 12 2011 (15:21)  
 

linu jacob   18 blog posts
Entry# 98319            Tags   Past Edits
According to one of the daily 8 out of 11 Garib Rath are loss making Which are them?
LTT-KCVL is profit making and YPR-PDY is lossmaking..add more

1 posts - Wed Jan 12, 2011

5 posts - Thu Jan 13, 2011

  
926 views
Jan 13 2011 (09:04)
✔KALINGAS✔*^~   8218 blog posts   503 correct pred (72% accurate)
Re# 98319-7            Tags   Past Edits
It may be Didi in not putting much stress on GR as lalu ji's
Ministers should introduce new train but also look after the existing ones
I think not much importance is given on them

  
912 views
Jan 13 2011 (09:11)
Pp*^~   4190 blog posts   124 correct pred (79% accurate)
Re# 98319-8            Tags   Past Edits
Most of the old train are now just Shadow of their original reputation. may of them are running as Fast passenger(due to so many stoppages ).

  
932 views
Jan 14 2011 (05:02)
Vinay Kumar~   15591 blog posts   360 correct pred (78% accurate)
Re# 98319-9            Tags   Past Edits
12255 Exp
Avl: 238 (14 Jan)
HO: 24
CK: 118
Total Avl: 380
#
...
more...

Total Berth: 16*78=1248
Berth Utilized: 866
Capacity Utilization: 69.55%
#
Fare: 381
Revenue: 381*866= 3.3 Lakh (Approx)
Diesel (@10L/Km): 456*10*50=2.28 Lakh
Gross Revenue: 1.02 Lakh
Gross Revenue Monthly (8 Trips): 8.15 Lakh
#
PS:
1. WDG-4 Consumption: 4L/Km (10 is too high guess, still taken)
2. Date taken is the last possible
3. Budgeting trip Month over Month will lead monthly trip getting more than 8 to 8.5, hence more gross revenue.
#
To find NET, plz deduct Monthly Salary (8/30*Salary Share been utilized to run this train)-Gross
1. Main & Asst Driver
2. Guard
3. 2 TTE (GR runs with 2 TTE as running staff)
4. 5-6 Attendent
I dont think combine, this will come near to 1.5 to 2 Lakh (At Higest Scale)
Note: I havnt seen any GRP in GR ever.
Still this GR do have some 5-6 Lakh to spare before sanctioned as loss making!!!

  
916 views
Jan 14 2011 (07:54)
✔KALINGAS✔*^~   8218 blog posts   503 correct pred (72% accurate)
Re# 98319-10            Tags   Past Edits
Wah Wah

  
916 views
Jan 14 2011 (08:15)
Guest: 7db81053   show all posts
Re# 98319-11            Tags   Past Edits
What could be the loos sustained to railways for tain number 0869?
Availability is very high apart from tatkal
General Quota
Date AC 3-tier Rs. 691
2011-01-14 Avbl 460
2011-01-21
...
more...
Avbl 741
2011-01-28 Avbl 864
2011-02-04 Avbl 875
2011-02-11 Avbl 905
2011-02-18 Avbl 924
  
0 Followers
3944 views
Jan 01 2011 (10:35)   12076/Thiruvananthapuram - Kozhikode Jan Shatabdi Express
 

Guest: 47112a0b   show all posts
Entry# 95885            Tags   Past Edits
When will the reverse Jan car start operating ?
Is it the rake of the Current JAn car run through Kottayam 5 days a week or is it an entirely new train which will run along with the current one ?

  
3500 views
Jan 04 2011 (14:45)
linu jacob   18 blog posts
Re# 95885-1            Tags   Past Edits
Yes New rake is needed for this train. 5 days in a week is for the mainanence at TVC ,since there is no maintance unit at clt

4 posts are hidden.

  
3194 views
Jan 09 2011 (19:52)
linu jacob   18 blog posts
Re# 95885-6            Tags   Past Edits
Six coaches of new JS already sent to SR. The remaing is still under construction at ICF

1 posts are hidden.

  
3136 views
Jan 13 2011 (11:33)
linu jacob   18 blog posts
Re# 95885-8            Tags   Past Edits
Then what?
  
0 Followers
976 views
Jan 04 2011 (14:38)  
 

linu jacob   18 blog posts
Entry# 96523            Tags   Past Edits
anybody can tell me the full form of VPUHX coaches?
Page#    12 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.