Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jan 21, 2018 12:40:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jan 21, 2018 12:40:47 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Pamidi Anil Kumar
Page#    11 Blog Entries  next>>
  
General Travel
0 Followers
162 views
Jan 17 2018 (18:00)  

Pamidi Anil Kumar   13 blog posts
Entry# 3011440            Tags   Past Edits
finally gnt - gtl railway line is ready to run with e-locos from feb-18
  
Timeline
0 Followers
7 views

Ashu^~
Nov 15 2017 (12:36)
Wrong loco details
Nov 07 2017 (16:45)   ED/WAP-7(I)   Loco - Add

Pamidi Anil Kumar   6 Conf TLs   3 Void TLs
ED/WAP-7(I)

  
25 views
Nov 15 2017 (12:36)
Ashu^~   1216 blog posts   263 correct pred (72% accurate)
Re# 2766483-1            Tags   Past Edits
Wrong loco details
  
General Travel
0 Followers
218 views
Jun 22 2017 (09:53)  

Pamidi Anil Kumar   13 blog posts
Entry# 2328688            Tags   Past Edits
Train no57620/19 Delta fast passenger is converted to express and speeded upto above 1hour. New train no17625KCG RAL EXP / 17626 RAL SC EXP will w.e.f 19-10-2017
  
General Travel
0 Followers
344 views
Jun 02 2017 (00:01)  

Pamidi Anil Kumar   13 blog posts
Entry# 2303597            Tags   Past Edits
Electric loco's are run between Nallapadu - cumbum section with goods rakes
  
General Travel
0 Followers
789 views
May 20 2017 (09:51)  

Pamidi Anil Kumar   13 blog posts
Entry# 2284119            Tags   Past Edits
LPI - PTCR railway line is almost completed , in this route only one halt is there , this route is so useful to public and reduces the travel time from secbad to patancheru compare to road

  
740 views
May 20 2017 (09:59)
✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿2018~   4139 blog posts   154 correct pred (72% accurate)
Re# 2284119-1            Tags   Past Edits
this line is upto ramachandrapuram(bhel) not patancheru...they need to construct flyover bridge on hyd-pune hwy if the line is upto patancheru to re-construct the line

  
395 views
May 20 2017 (12:04)
Venkat వెంకట్   3380 blog posts   1 correct pred (100% accurate)
Re# 2284119-2            Tags   Past Edits
They should extend this till ORR.
Page#    11 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jan 31
Trains with ARP 15 Dep on: Mon Feb 5
Trains with ARP 30 Dep on: Tue Feb 20
Trains with ARP 120 Dep on: Mon May 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.