Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jul 23, 2017 04:13:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jul 23, 2017 04:13:51 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Warrier is BACK*^~
Page#    3523 Blog Entries  next>>
  
Race Blog
0 Followers
5233 views
Feb 07 2017 (09:59)   22109/Mumbai LTT - Hazrat Nizamuddin AC SF Express | BRC/WAP-5/30088

Awes Khan*^~   45200 blog posts   2173 correct pred (78% accurate)
Entry# 2154379            Tags   Past Edits
● ☆ ● ☆ ● ☆ ● ☆ ● ☆ Race blog ☆ ● ☆ ● ☆ ● ☆ ● ☆ ● ☆ ●
::::::::::मध्य रेल्वे :******: मध्य रेल :******: Central Railway ::::::
:::::::::::::::::::::::::::::::: Run Date 7th February 2017 :::::::::::::::::::::::::::
२२१०९ डाऊन लो.टि.ट(मुंबई)-ह. निज़ामुद्दीन वातानुकुलित सुपरफास्ट एक्सप्रेस
२२१०९
...
more...
डाऊन लो.टि.ट(मुंबई)- ह. निज़ामुद्दीन वातानुकुलित सुपरफास्ट एक्सप्रेस
22109 Down : LTT(Mumbai) - H. Nizamuddin AC SF Express
©®~©®~©®~©®~©®~©®~©®~©®~©®~©®~©®~©®
©®~©®~©®~©®~©®~©®~©®~©®~©®~©®~©®~©®
Loco :-
☆ ☆ ☆☆ ☆ Zone wise performance ☆ ☆ ☆ ☆ ☆
CR -
WCR -
NCR -
NR -
☆ ☆ ☆ ☆ ☆ Division wise performance ☆ ☆ ☆ ☆ ☆
LTT -
IGP -
KNW -
BINA -
DHO -
PWL -
NZM -
☆ ☆ ☆ ☆ ☆ Overtake List ☆ ☆ ☆ ☆

73 posts are hidden.

  
473 views
Feb 07 2017 (21:10)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2154379-74            Tags   Past Edits
Now a long 400 Km non stop run till BPL.....AC needs to hit flat mps for atleast 2 hrs+ in its running time between BSL and BPL in order to reach BPL on time

  
576 views
Feb 07 2017 (21:12)
Awes Khan*^~   45200 blog posts   2173 correct pred (78% accurate)
Re# 2154379-75            Tags   Past Edits
AC Departed from BHUSAVAL JN (BSL) at 07-Feb 20:57 Delayed by 37 Min. (257 Kms. ahead of NASIK ROAD)
7min halt.
Overtook 12617 and 51157 at BHUSAVAL JN.

1 posts are hidden.

  
484 views
Feb 07 2017 (21:13)
Awes Khan*^~   45200 blog posts   2173 correct pred (78% accurate)
Re# 2154379-77            Tags   Past Edits
AC Departed from DUSKHEDA (DSK) at 07-Feb 21:07 (6 Kms. ahead of BHUSAVAL JN)
6km in 10min

3 posts are hidden.

  
472 views
Feb 07 2017 (21:37)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2154379-81            Tags   Past Edits
79 kmph avg

  
474 views
Feb 07 2017 (21:39)
❤️ ⚡ WAP5™ ⚡ ❤️   6738 blog posts   278 correct pred (91% accurate)
Re# 2154379-82            Tags   Past Edits
Departed from BURHANPUR (BAU) at 07-Feb 21:35 (54 Kms. ahead of BHUSAVAL JN).
54 km in 38 min = 85.26 km/h

89 posts are hidden.
  
★  Rail Fanning
0 Followers
2963 views
Feb 06 2017 (21:29)   JRC/Jalandhar Cantt. Junction (3 PFs)

give priority to sachkhand express~   1133 blog posts   1033 correct pred (66% accurate)
Entry# 2153834            Tags   Past Edits
jalandhar cantt

  
519 views
Feb 06 2017 (21:38)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2153834-1            Tags   Past Edits
Tundla Jn ?

  
529 views
Feb 06 2017 (21:40)
give priority to sachkhand express~   1133 blog posts   1033 correct pred (66% accurate)
Re# 2153834-2            Tags   Past Edits
no

11 posts are hidden.
  
Rail News
0 Followers
2049 views
IR Affairs
Jan 24 2017 (22:05)   Russia's 5 changes to increase Indian Railways' train speed to 200 kmph

🚆Bhartiya Rail🚆   66 news posts
Entry# 2139185   News Entry# 292164         Tags   Past Edits
Russia's 5 changes to increase Indian Railways' train speed to 200 kmph
Russian Railways is helping India's national transporter increase the speed of its passenger trains up to 200 km per hour. Russian Railways is at present collaborating with Indian Railways on a 575-km stretch between Nagpur and Secunderabad and submitted a preliminary report last week. Here are 5 changes that Russia has suggested to make trains run at 200/kmph in India.
1. New Rakes
Since
...
more...
Indian Railways doesn't have coaches that can move with a speed of 200 km per hour, a new type of passenger cars needs to be approved as well.
2. Infrastructural changes
It has, however, expressed concern over "a number of large bridges with speed limits" on this particular stretch and has recommended a detailed survey of all these structures on the basis of which measures for reconstruction/repair will be taken up. To reach the desired speed limit, Russian Railways has proposed several technical and technological solutions, including reconstruction of railway alignment as well as treating the earth bed where there are speed restrictions.
3. Change in railroad switches
It has also been pointed out that railroad switches, which enables trains to shift from one track to another, at stations on this stretch are not suitable for a speed of 200 km per hour and a different type of switch has been recommended.
4. Digital network
A digital technological communication network for the entire section, instead of the existing radio communication, was also proposed.
5. Safety measures
A high-speed rail network will also require safety measures for pedestrians and motor vehicles at rail crossings. Keeping this in mind, overpasses, anti-collision and anti-ram barriers, as well as automatic alarm systems have been suggested. A protective fencing along the length of the rail track was mooted in order to prevent accidents with people and animals on the track. The Russian Railways also suggested noise shields for tracks near residential areas.
A protocol for this project was signed between the railway ministries of the two countries in October last year.
The high-speed project will be jointly financed and the cost will be split equally between the two countries.
Currently, the fastest train in India is Gatimaan Express with top speed of 160 km per hour.

4 posts are hidden.

  
1734 views
Feb 04 2017 (18:32)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2139185-5            Tags   Past Edits
Yet another study and recommendation....that unfortunately is not going to serve any purpose
  
★★  General Travel
0 Followers
3755 views
Dec 28 2016 (09:54)   12953/August Kranti Rajdhani Express

Mani Vijay   601 blog posts
Entry# 2107832            Tags   Past Edits
BCT to NZM by August Kranti Rajdhani - Part 1 (Aug. 1995) : At that time, the train had just five commercial halts - Surat, Bharuch, Vadodara, Kota (technical), Sawai Madhopur, Mathura. On that particular day, the rake strength was below normal (13 coaches), hence, a single WDM2 was employed between Bombay and Vadodara. This video covers the journey till Vadodara. For a more detailed coverage through the Bombay suburbs, please see the following video: click here

  
3259 views
Dec 31 2016 (13:53)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2107832-1            Tags   Past Edits
Mumbai hasnt changed much in 21 years.......all the places more or less look the same.....especially the BCT station, Bandra Stn as well the gradient near Khar.
TRIP HAS ENDED.
Blog  Time-Table

1 posts are hidden. Click to open.

  
6671 views
Nov 08 2016 (05:49)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2037769-2            Tags   Past Edits
HJ Joshua.....with a DQ coach ...top speed will be 110 kmph instead of 120 kmph

1 posts are hidden. Click to open.

  
6685 views
Nov 08 2016 (05:59)
JOSH*^~   13785 blog posts   15265 correct pred (75% accurate)
Re# 2037769-4            Tags   Past Edits
Top speed is 110 only for JS nw Rahul bhai..

  
5994 views
Nov 12 2016 (06:58)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 2037769-5            Tags   Past Edits
so only TVC Raj goes at 120 KMPH now ??

  
5594 views
Nov 12 2016 (18:37)
JOSH*^~   13785 blog posts   15265 correct pred (75% accurate)
Re# 2037769-6            Tags   Past Edits
Yea.. Right bro.
Page#    3523 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Aug 2
Trains with ARP 15 Dep on: Mon Aug 7
Trains with ARP 30 Dep on: Tue Aug 22
Trains with ARP 120 Dep on: Mon Nov 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.