Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Aug 18, 2017 16:41:52 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Aug 18, 2017 16:41:52 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ashwin Kenkare
Page#    163 Blog Entries  next>>
  
Timeline
0 Followers
303 views

Railway privatisation is must^~
May 29 2017 (17:01)
Not needed
May 29 2017 (14:11)   New Delhi - Mumbai Central Rajdhani Express/12952   Train - Regular/Technical Halt - MTJ/Mathura Junction (10 PFs)

Ashwin Kenkare   3 Conf TLs   2 Void TLs
MTJ/Mathura Junction (10 PFs); Passes Thru; Arrival: 17:58; Departure: 17:58

Nov 12 2016 (20:14)   (previous value)
Timeline Entry# 1047403
by: Bengaluru Chennai Mail in MSTS coming soon^~
MTJ/Mathura Junction (10 PFs); Stop REMOVED
  
★  Info Update
0 Followers
5892 views
May 26 2017 (13:04)   22140/Solapur - Mumbai CST SF Express | SUR/Solapur (5 PFs)

Solapur Superfast~   1731 blog posts   66 correct pred (72% accurate)
Entry# 2293786            Tags   Past Edits
In yesterday's meeting with Solapur MP Mr. Sharad Bansode at DRM office, it is decided that SUR Division will be sending proposal of Solapur - Pune - Solapur new Intercity Express due to increased demand in this route.
It is brought to notice that rake of 22139/40 is idle at Solapur for whole day. So CR is decided to use that rake for running day time Intercity between Solapur and Pune with Kurduwadi, Jeur & Daund hault.
Timings of this train likely to be reverse of 12169/70 in both directions.
...
more...

6 posts are hidden.

  
587 views
May 27 2017 (22:21)
Ashwin Kenkare   384 blog posts   53 correct pred (62% accurate)
Re# 2293786-8            Tags   Past Edits
SWR is too smart. On one hand, it wants to cancel the service it is extending and on the other hand, it want CR to extend CR services into SWR. If SWR is serious about tain to MUmbai from Gadag, it should actually run LTT UBL via gadag on daily basis.

2 posts are hidden.

  
545 views
May 28 2017 (11:25)
Golgumbaz exp via Gadag Yalvigi new line~   4301 blog posts   325 correct pred (69% accurate)
Re# 2293786-11            Tags   Past Edits
Current Sur Ubl Sur ICE is also a CR train. Both ways it is profit to CR. Few years ago CR used to run rakes of Ypr Sur SF to pune. During summer, that train does not gained momentum. Best train between these two cities is always a ICE with a CC and 2S coaches

2 posts are hidden.

  
738 views
May 28 2017 (11:40)
WDP4   536 blog posts
Re# 2293786-14            Tags   Past Edits
"it wants to cancel the service it is extending " - What are you talking? That is a CR train not SWR. That is not getting extended nowhere. Its being cancelled.

14 posts are hidden.
  
Rail Fanning
0 Followers
5771 views
Nov 06 2016 (06:48)   11077/Jhelum Express (PT) | MRA/Morena (3 PFs) | GMO/WAG-9Hi/31574

Bareilly Ki Barfi^~   5307 blog posts   2776 correct pred (65% accurate)
Entry# 2049905            Tags   Past Edits
Electric Loco #mela
Rfing at Morena

  
5664 views
Nov 06 2016 (07:07)
Ashwin Kenkare   384 blog posts   53 correct pred (62% accurate)
Re# 2049905-1            Tags   Past Edits
Jhelum P7 kabhi ka hain? 11077/78 ?

  
5702 views
Nov 06 2016 (07:10)
Bareilly Ki Barfi^~   5307 blog posts   2776 correct pred (65% accurate)
Re# 2049905-2            Tags   Past Edits
11077 he
  
★  General Travel
0 Followers
4376 views
Jul 05 2016 (10:53)   GR/Gulbarga (4 PFs)
 

skumarvkulkarni~   1704 blog posts
Entry# 1918351            Tags   Past Edits
Sad Indian Railways planning to have safe burial for Budget announced Intercity Express between Hyderabad-Gulbarga as per RTI. Really When pit line is ready in gulbarga there is no issue of maintenance, plus Gulbarga-Hyderabad is fully doubled no line capacity constraint.

7 posts are hidden.

  
2391 views
Jul 06 2016 (21:31)
Ashwin Kenkare   384 blog posts   53 correct pred (62% accurate)
Re# 1918351-8            Tags   Past Edits
The article that you posted says SCR ran the train. Why drag CR unnecessarily in this?

  
2270 views
Jul 07 2016 (16:37)
Solapur Superfast~   1731 blog posts   66 correct pred (72% accurate)
Re# 1918351-9            Tags   Past Edits
Yes.. it was CR rake given to SCR.
That's why special by SCR.

2 posts are hidden.
  
★★★  Info Update
0 Followers
11373 views
Mar 23 2016 (19:53)   11309/Solapur - Miraj Express (UnReserved) | MO/Mohol (2 PFs)
 

Solapur Superfast~   1731 blog posts   66 correct pred (72% accurate)
Entry# 1777200            Tags   Past Edits
#Doubling Pune - Solapur
Mohol to Madha (3 stations) doubling work is almost done.. Signals are also installed.. Now only new lines need to connect to main lines..
Pic also shows 12115 Siddheshwar Express crossing Miraj Fast Passenger at Mohol

3 posts are hidden.

  
2097 views
May 03 2016 (11:43)
Ashwin Kenkare   384 blog posts   53 correct pred (62% accurate)
Re# 1777200-4            Tags   Past Edits
Doubling on Mohol-WaKav section completed. Should be expected to be commissioned next month.
Wakav to Madha outer also has been completed. Madha yard remodelling work pending.
All in all, good news for passengers travelling on this section.

  
7588 views
May 04 2016 (20:31)
Solapur Superfast~   1731 blog posts   66 correct pred (72% accurate)
Re# 1777200-5            Tags   Past Edits
Yes.. Soon Mohol - Madha strech will be open for traffic after commission

  
7510 views
May 06 2016 (15:28)
Solapur Superfast~   1731 blog posts   66 correct pred (72% accurate)
Re# 1777200-6            Tags   Past Edits
Yes.. Soon Mohol - Madha strech will be open for traffic after commission

3 posts are hidden.
Page#    163 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 28
Trains with ARP 15 Dep on: Sat Sep 2
Trains with ARP 30 Dep on: Sun Sep 17
Trains with ARP 120 Dep on: Sat Dec 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.