Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jul 24, 2017 06:15:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jul 24, 2017 06:15:12 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by அர்விந்த் aRvInD~
Page#    167 Blog Entries  next>>
  
General Travel
0 Followers
2149 views
Mar 06 2017 (00:21)   82842/Krishnarajapuram - Bhubaneshwar Suvidha Special

அர்விந்த் aRvInD~   282 blog posts   185 correct pred (73% accurate)
Entry# 2187400            Tags   Past Edits
Update #tb with From and To in English Pls update #admin

  
1942 views
Mar 06 2017 (08:09)
ಅರ್ಜುನ್ अजुॅन Arjun~   1118 blog posts   32 correct pred (85% accurate)
Re# 2187400-1            Tags   Past Edits
Any officals said asking borad tb...

  
394 views
Jun 27 2017 (00:16)
அர்விந்த் aRvInD~   282 blog posts   185 correct pred (73% accurate)
Re# 2187400-2            Tags   Past Edits
Sorry couldn't understood your reply...

  
Hi waiting at KJM. Is U/R there in Engine side or Back side?

1 posts are hidden. Click to open.

  
one is present at front and rear,but I suggest u to board at end,as it is a janshatabdhi U/R gaurd van...front you will have crowded less space SLR U/R coach

18 posts are hidden. Click to open.

  
Reached KPD 1hr late with drizzling climate welcoming at TN border. After crossing GYM was waiting again for 15 min. Deboarded there to continue to Ranipet hope the rain has crossed RU....

  
Yea same delay continued till RU,and we waited at KPD outer as TVC bound Kerala switching from loop to main line.reached RU around 1:50

1 posts are hidden. Click to open.
  
★★  Travelogue
0 Followers
4133 views
Jan 29 2017 (13:25)   12692/Sri Sathya Sai Prashanthi Nilayam - Chennai Central Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs) | RPM/WAP-7/30393

GZB WAP5 with Mysore Shatabdi^~   10558 blog posts   15672 correct pred (86% accurate)
Entry# 2144525            Tags   Past Edits
2 compliments
Great REPORT bro Finishing parallel entry looks nice
MAS-SBC-MAS TRIP (Continued...):
For PART-1:/blog/post/2144306.
--------------------------------------
PART-2(SBC-MAS):
Date:28.01.2017(Saturday)
Train:12692
...
more...
Satya Sai Prashanti Nilayam - Chennai Central SF Express
Loco: ET WAP4 22883/RPM WAP7 30393
--------------------------------------
I had taken this train instead of 8 Mail due to the foreseen delayed runs of KK. This is my first journey in this train. This is a relatively obscure choice,atleast as far as I am concerned, between SBC and MAS. I had reached the Majestic station by 21:45 hrs. The scheduled arrival at SBC is 22:13 hrs. But the display showed that the train was running with a delay of 23 mins. And there was no PF allotted yet. Meanwhile, the display boards showed that 8 Mail was scheduled to leave at 01:00 hrs(delay of 2hrs 20 mins, a considerable improvement). There were announcements being made on the rescheduling of Mail. Passengers who had much expectation on Mail, wore a sign of disappointment,drowsiness and anger on their faces. The MAS-SBC SF had arrived onto PF.No.2 led by WAP7 30411. It had Amazon advertisements all over its coaches. The Shatabdi from MAS was expected at 22:30 hrs while the Lalbagh Express was expected to arrive at 22:05 hrs. Hampi Express departed bang on time. UBL-SBC JS arrived on time. The entire station premises was resounding with EMD honking. At sharp 22:05 hrs, Lalbagh arrived with WAP7 honking madly delayed by half an hour.
For a change,Our train was given PF.No.1, the sole property of 8 Mail. Now Shatabdi's arrival time changed to 22:35 hrs. This clearly meant that our train would be delayed even more. 12027 arrived at PF.No.7 with its standard delay of 10 mins at 22:40 hrs. Then the announcement for our train was made as"Your kind attention please! Train No.12692 SSPN-Chennai Superfast Express coming from SSPN is expected to arrive on PF.No.1 at 10:50 PM.". Note that SSPN is announced as "S S P N" and not "Satya Sai Prashanti Nilayam". The clocked ticked by. It was at 23:00 hrs(scheduled departure of 12692 from SBC), that a bright beam shone on the rake of MAS-SBC SF. And there it was,our train hurried onto the PF hauled by WCR's red hunk ET WAP4 22883 with twin tone honking. The train was empty. Not a soul was seen inside the train including general coaches. The passengers who wanted to board general coaches of Mail scrambled into these empty coaches of 12692 without any second thought even as the train was pulling in. The train came to a stop with a jerk(CBC effect). My coach was S5 2009 made coach. It was evident that it had undergone POH. I was given a LB(non-track side). Charging points were present.
Now I was wondering which loco will take charge of our train for the SBC-MAS leg. There was 30393 waiting for its duty at PF.No.2 at the BNC end right behind MAS-SBC SF. Usually,as far as I know, 8 Mail's link takes this position. As soon as Mail gets shunted and the shunter decouples from the rake and moves to the siding, the loco will reverse onto PF.No.1 and coupling takes place. But its a fact that 30393 will not haul Mail as Mail has LSA with Lalbagh Express. As expected, 30393 coupled to our train without any movement, jerks or obstacles as it happens usually in CBC rakes. The crew at SBC must be lauded for the same. To put it in a nutshell, the loco which brought me was going to take me back. The Shatabdi was meanwhile shunted in order to receive BWT-SBC Express wjich will continue as MYS Passenger.
At 23:15 hrs, P7 gave a long whining toot and we were off. We clearly the points slowly and accelerated out of the limits of SBC. Led by a RPM WAP7, BWT Express was waiting at SBC outer for us to clear its way. The LPs were in a joyous mood which they expressed through honking. We halted at BNC for about 4 mins. Passengers were expecting LTT-CBE(Kurla) Express which too was delayed. We skipped BNCE and BYPL at MPS. We had a 2 min halt at KJM. There were WDG4 twins(one of them was GY's 12605) and KJM alco twins at KJM. Once again, we touched MPS and arrived at WFD. After a minute halt, we left WFD at 00:00 hrs. WFD-BWT was covered in flat 38 mins.One thing that proved to be a disturbance was the jerks and kicks as a consequence of CBC due to numerous slowdowns and powerful acceleration of P7. It was indeed a nightmare intervening a much required good night's sleep.
As a consequence of one such jolt, I woke up to find that we were accelerating out of AJJ. AJJ-PER was done non-stop without any clearance problem. After a quick halt at PER,P7 accelerated madly only to slow down for the PSR of 30 at VJM. We switched onto tracks towards MAS. We were stopped at BBQ for unknown reasons. As we were waiting for starter,a light TNP alco coming from BZA end went through PF.No.7 into BBQ end. Simultaneously, late running 22644 PNBE-ERS SF led by ED WAP4 22603 entered from the BZA side onto PF.No.6. The entire train had almost crossed the PF limits when we got proceed signal. We witnessed a parallel run or race rather till MAS. P7 quickly accelerated and overtook 22644. 22644 re-overtook us. This went on in an alternate manner. After a series of overtakes and re-overtakes, both the trains simultaneously pulled onto adjacent PFs(5-22644 and 6-12692) at 5:10 hrs. We were early by 5 mins. LGD WAP4s 22213 and 22264 were seen resting after their duties.
Overall, this train got best sectional clearance between SBC and MAS for this. But it can never equal Mail.
Overall rating:
Cleanliness- 10/10.
Comfort-5/10(Needless to say,P7+ CBC rake).
Speed & Punctuality-10/10.

1 posts are hidden.

  
2521 views
Mar 29 2017 (12:36)
அர்விந்த் aRvInD~   282 blog posts   185 correct pred (73% accurate)
Re# 2144525-2            Tags   Past Edits
Excellent balance b/w Geeky terms and Story-reading captivity. Semma write-up, Evalo naala IRI geek ah erukinga?..!

  
2479 views
Mar 29 2017 (13:32)
GZB WAP5 with Mysore Shatabdi^~   10558 blog posts   15672 correct pred (86% accurate)
Re# 2144525-3            Tags   Past Edits
Haha! Thanks bro for your compliment! :D Glad you liked it and thanks for your patient reading. Please do read this-/blog/post/2144306.
  
General Travel
0 Followers
3942 views
Jan 26 2017 (13:22)   12509/Bengaluru Cantt. - Guwahati (Kaziranga) Express (PT)

அர்விந்த் aRvInD~   282 blog posts   185 correct pred (73% accurate)
Entry# 2140941            Tags   Past Edits
Did a Jam packed journey on this yesterday. This is the longest train I've ever seen in KJM KPD section. What's the most longest train in IR?

  
3821 views
Jan 26 2017 (13:26)
IR no more Safe^~   23080 blog posts   99676 correct pred (75% accurate)
Re# 2140941-1            Tags   Past Edits
DBRG CAPE Vivek Exp is the longest.

  
3549 views
Jan 31 2017 (18:50)
அர்விந்த் aRvInD~   282 blog posts   185 correct pred (73% accurate)
Re# 2140941-2            Tags   Past Edits
I didn't ask about Long distance travelling train. I questioned train that has most no of Coaches except in goods train..

  
3567 views
Jan 31 2017 (18:53)
IR no more Safe^~   23080 blog posts   99676 correct pred (75% accurate)
Re# 2140941-3            Tags   Past Edits
Many have that.
24 coaches max permitted.
  
01
Station Tip
Auto/Taxi/Bus
0 Followers
2061 views
Jan 31 2017 (11:10)   KJM/Krishnarajapuram (4 PFs)

அர்விந்த் aRvInD~   282 blog posts   185 correct pred (73% accurate)
Entry# 2146548            Tags   Past Edits
People from Whitefield/ITPL/Hope farm instead of taking ITPL main road route which has Phoenix mall traffic, Choosing Old Madras road via Hoodi bridge which save you much time and frustration due to traffic. Before KR Puram bridge, take left and using the under bridge road, one can reach PF#1 ticket counter avoiding entire conjugation at KR Puram flyover/ Tin factory. This tip is useful only when traveling towards KJM. Pls refer the screenshot attached.
Page#    167 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 3
Trains with ARP 15 Dep on: Tue Aug 8
Trains with ARP 30 Dep on: Wed Aug 23
Trains with ARP 120 Dep on: Tue Nov 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.