Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jul 25, 2017 06:11:02 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jul 25, 2017 06:11:02 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by swamikanraja
Page#    5 Blog Entries  
TRIP HAS ENDED.
Blog  Time-Table

  
Dec 18 2016 (16:34)
swamikanraja   4 blog posts   1 correct pred (50% accurate)
Re# 2089940-1            Tags   Past Edits
at CSTM/Mumbai CSM Terminus: on time
Departs from platform number 16. New train fitted with bio toilets.

  
4419 views
Dec 19 2016 (11:21)
imaravIndian^~   798 blog posts   314 correct pred (78% accurate)
Re# 2089940-2            Tags   Past Edits
Is it LHB??

  
4004 views
Dec 19 2016 (19:52)
walnutzalmondz~   771 blog posts
Re# 2089940-3            Tags   Past Edits
Can you post pictures if possible
  
Predictions: 26
confirm: 26
rac: 0
wl: 0
Journey: Tue Dec 29, 2015 @ 08:35
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 21
Travel: TEN/Tirunelveli Junction   to   DR/Dadar Central   |   1789 km / 1871 km
16340/Nagercoil - Mumbai CST Express (PT)
Entry# 1631581

Posted by: swamikanraja   4 blog posts   1 correct pred (50% accurate)
PNR: 411-xxxxxxx   |   Similar PNRs
Posted Status as of: Oct 28 2015 (23:44)
Passenger 1: RAC 4 (Booking Status: W/L 2,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 3,GNWL)
Passenger 3: Waitlist# 2 (Booking Status: W/L 4,GNWL)
Passenger 4: Waitlist# 3 (Booking Status: W/L 5,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 28 2015 (18:52)
Passenger 1: A1,13 [LB] (Booking Status: W/L 2,GNWL)
Passenger 2: A1,15 [LB] (Booking Status: W/L 3,GNWL)
Passenger 3: A1,14 [UB] (Booking Status: W/L 4,GNWL)
Passenger 4: A1,16 [UB] (Booking Status: W/L 5,GNWL)
Chart PREPARED

Full PNR Status History (2 statuses)
Status as of: Dec 28 2015 (18:52)
Passenger 1: A1,13 [LB] (Booking Status: W/L 2,GNWL)
Passenger 2: A1,15 [LB] (Booking Status: W/L 3,GNWL)
Passenger 3: A1,14 [UB] (Booking Status: W/L 4,GNWL)
Passenger 4: A1,16 [UB] (Booking Status: W/L 5,GNWL)
Chart PREPARED

Status as of: Dec 25 2015 (10:36)
Passenger 1: RAC 3 (Booking Status: W/L 2,GNWL)
Passenger 2: RAC 4 (Booking Status: W/L 3,GNWL)
Passenger 3: Waitlist# 1 (Booking Status: W/L 4,GNWL)
Passenger 4: Waitlist# 2 (Booking Status: W/L 5,GNWL)
Chart NOT Prepared


  
2504 views
Nov 03 2015 (15:41)
Guest: 7119e766   show all posts
Re# 1631581-1            Tags   Past Edits
#racAllocation 4 in 2A from TEN/Tirunelveli Junction to DR/Dadar Central.
  
Predictions: 32
confirm: 22
rac: 9
wl: 1
Journey: Wed Nov 20, 2013 @ 07:20
Class: Sleeper - SL   |   Tot Seats: Avbl 241
Travel: TEN/Tirunelveli Junction   to   DR/Dadar Central   |   1752 km / 1752 km
22630/Tirunelveli - Mumbai Dadar Express (via Konkan) (PT)
Entry# 897037
 

Posted by: swamikanraja   4 blog posts   1 correct pred (50% accurate)
PNR: 471-xxxxxxx   |   Similar PNRs
Posted Status as of: Nov 05 2013 (14:10)
Passenger 1: Waitlist# 10 (Booking Status: W/L 28,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 20 2013 (14:14)
Passenger 1: RS1 55/Coach Position:7 (Booking Status: W/L 28,GNWL)
Chart PREPARED

  
1982 views
Nov 05 2013 (14:11)
▅ ▆ ▇ █★KR ♥ Lover ♥ Forever★█ ▇ ▆ ▅~   10322 blog posts   3405 correct pred (57% accurate)
Re# 897037-1            Tags   Past Edits
Sir i request you
During your trip, please see that the coaches are fitted with Bio-toilets. I have got a news about it
Thanks
Regards Yash

  
1872 views
Nov 06 2013 (09:37)
swamikanraja   4 blog posts   1 correct pred (50% accurate)
Re# 897037-2            Tags   Past Edits
Sure will do. What is the specialty about these toilets?

  
1594 views
Nov 19 2013 (17:59)
maheshsunda*^~   4344 blog posts   31422 correct pred (71% accurate)
Re# 897037-3            Tags   Past Edits
  
Predictions: 39
confirm: 7
rac: 32
wl: 0
Journey: Wed Jan 09, 2013 @ 12:10
Class: Sleeper - SL   |   Tot Seats: Avbl 308   |   Charting: < 08:15
Travel: CSTM/Mumbai CSM Terminus   to   TEN/Tirunelveli Junction   |   1792 km / 1866 km
16339/Mumbai CSMT - Nagercoil Express
Entry# 635742
 

Posted by: swamikanraja   4 blog posts   1 correct pred (50% accurate)
PNR: 856-xxxxxxx   |   Similar PNRs
Posted Status as of: Jan 09 2013 (00:33)
Passenger 1: RAC 77 (Booking Status: W/L 103,GNWL)
Passenger 2: RAC 78 (Booking Status: W/L 104,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 09 2013 (09:48)
Passenger 1: RS5 55/Coach Position:14 (Booking Status: W/L 103,GNWL)
Passenger 2: RS5 55/Coach Position:14 (Booking Status: W/L 104,GNWL)
Chart PREPARED

  
1181 views
Jan 09 2013 (08:58)
Namaste Sharada Devi Kashmir Pura Vasini Tvam ham*^~   900 blog posts   43331 correct pred (68% accurate)
Re# 635742-1            Tags   Past Edits
no chance bhai
  
General Travel
0 Followers
2892 views
Dec 15 2012 (15:15)   11021/Dadar - Tirunelveli Chalukya Express (PT)
 

swamikanraja   4 blog posts   1 correct pred (50% accurate)
Entry# 611898            Tags   Past Edits
Going to travel in this train for the first time tonight - all the way from Dadar to Tirunelveli.
Feeling excited!!

  
2804 views
Dec 15 2012 (15:17)
SRG*^~   35726 blog posts   174008 correct pred (76% accurate)
Re# 611898-1            Tags   Past Edits
Happy Journey!!

  
2711 views
Dec 15 2012 (17:36)
swamikanraja   4 blog posts   1 correct pred (50% accurate)
Re# 611898-2            Tags   Past Edits
Thanks SRG Sir!!
:-)

  
2729 views
Dec 15 2012 (17:39)
Success comes with love Thank you 12650*^~   15739 blog posts   4387 correct pred (85% accurate)
Re# 611898-3            Tags   Past Edits
Happy Journey....
Page#    5 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Aug 4
Trains with ARP 15 Dep on: Wed Aug 9
Trains with ARP 30 Dep on: Thu Aug 24
Trains with ARP 120 Dep on: Wed Nov 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.