Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Aug 18, 2017 20:31:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Aug 18, 2017 20:31:26 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by rohitgl
Page#    5 Blog Entries  
  
★  Site-Related
0 Followers
1882 views
Jul 22 2017 (13:09)   HSR/Hisar Junction (6 PFs)

nbirpali   34 blog posts
Entry# 2359826            Tags   Past Edits
Hisar Jn. will be surrounded by Electric wires till Dec 2017 as all of its routes are going to be electrified soon by OHE works.....

9 posts are hidden.

  
205 views
Aug 13 2017 (19:52)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 2359826-10            Tags   Past Edits
koi nai kabhar dost !!

  
166 views
Aug 13 2017 (21:27)
रोहित सिंह मुंदालिया   432 blog posts   433 correct pred (66% accurate)
Re# 2359826-11            Tags   Past Edits
Batao apko kya khabar dun bhai

8 posts are hidden.
  
★★★  General Travel
0 Followers
21660 views
Oct 27 2015 (19:01)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1129 blog posts   11 correct pred (58% accurate)
Entry# 1630444            Tags   Past Edits
Headlines from today's Function of Laying of Foundation Stone for #CoachCareComplex by #RM Mr Suresh Prabhu.
The CCC contains....
- A washing line (24+2 coaches but RM announced it will be of 28 coaches)
- A sik line/Shed for fully inspection of coaches
-
...
more...
An Office Complex which is environmently green
- A Depot for daily uses instruments & Spare Parts.
The representatives of Hisar (MP-Dhusyant Chautala , MLA- Kamal Gupta) demanded of-
1-Re develop of Hisar Junction (build 115 years ago and after that no such chnages is come here)
2-Make Hisar as Head Quartr as official have to travel 600km for work which is way lone and hisar is surrounded by three division (Delhi,Ambala,Bikaner) which means we have to talk three divisions for a project to took place.
More over that the farmers are ready to give there land at Nyoli Kalan (10RKM away from HSR on HSR-BTI line )
3-Senction work for Hansi-Jind (35km) & Uklana-Narwan (29km) whose survey report has been come to GM and found feasibily positive & work for HNSI-ROK rail line.
4-Senction work for ROB's at Surya nagar & Dabra Chawk (whose DPR is done) & RUB at patel nagar.
5-Allot fund for railway line as official only senction rs 10000 For the project.
#RM Mr Suresh Prabh replies,
1-Hisar is one of the 400 station whose development is done under PPP model.
2-Hansi-ROK rail line is having some issue about land acquisition , as soon it resolved we'll be on the ground.
3- The ROB at surya nagar will be soon on earth & i believe i'll get the chance for laying the foundation stone.
4- I have senction 60 lacs for the washing line project right now and remaining will be provided as it requires.
5-A DEMU train will be run after the complition of Washing Line.
Before leaving he said , i have all the demands from the representatives as my style of work is that " I do first then i speak, qouted about her grandmother " and i am not promising right now but you'll surely see better for your city.

43 posts are hidden.

  
2220 views
Mar 29 2017 (14:26)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 1630444-51            Tags   Past Edits
Thanks for sharing pictures... seems it will take time to complete.. let's pray that work should finish fast with good quality infrastructure which should stay for decades...

1 posts are hidden.

  
3790 views
Mar 30 2017 (10:16)
हिसार जंक्शन~   1129 blog posts   11 correct pred (58% accurate)
Re# 1630444-53            Tags   Past Edits
Thnku Bro ! Yes, i guess 2 months for Washing line and approx same for the Pit line !

4 posts are hidden.

  
1320 views
Jul 17 2017 (16:20)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 1630444-58            Tags   Past Edits
Thanks borther.. Feeling happy & proud to see these pics :)

  
1200 views
Jul 17 2017 (20:41)
रोहित सिंह मुंदालिया   432 blog posts   433 correct pred (66% accurate)
Re# 1630444-59            Tags   Past Edits
I CAN SHOW YOU MORE PICS
  
★★★  Info Update
Dec 03 2015 (21:50)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1129 blog posts   11 correct pred (58% accurate)
Entry# 1669885            Tags   Past Edits
Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling
...
more...

●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar

133 posts are hidden.

  
1904 views
Jun 14 2017 (16:37)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 1669885-139            Tags   Past Edits
seems It got delayed due to Electricity board DHBVN but good to see that it got started

7 posts are hidden.
  
General Travel
0 Followers
2207 views
Mar 07 2017 (12:35)  

rjkh49~   21 blog posts
Entry# 2188821            Tags   Past Edits
News abount yard (washing line) connected with Plate form in Hisar started

2 posts are hidden.

  
744 views
Apr 18 2017 (16:51)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 2188821-3            Tags   Past Edits
Rohit ji, whats the current status of washing yard?

  
726 views
Apr 18 2017 (17:11)
रोहित सिंह मुंदालिया   432 blog posts   433 correct pred (66% accurate)
Re# 2188821-4            Tags   Past Edits
ALMOST COMPLETE😂

  
619 views
Apr 20 2017 (15:08)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 2188821-5            Tags   Past Edits
Thats Good News .To Ekta or Kalindi ko kab laa rahey haun saab :)

  
588 views
Apr 20 2017 (16:52)
रोहित सिंह मुंदालिया   432 blog posts   433 correct pred (66% accurate)
Re# 2188821-6            Tags   Past Edits
Pata nahi
  
General Travel
0 Followers
2266 views
Nov 04 2016 (15:38)   HSR/Hisar Junction (6 PFs)

rohitgl   8 blog posts   1 correct pred (50% accurate)
Entry# 2048013            Tags   Past Edits
Please any one can let us know current status of Washing Line / Sick Line/ Coach Yard at Hisar. How much work is completed.
Thanking You in advance

  
331 views
Nov 04 2016 (23:45)
रोहित सिंह मुंदालिया   432 blog posts   433 correct pred (66% accurate)
Re# 2048013-1            Tags   Past Edits
/blog/post/1630444

1 posts are hidden.

  
1863 views
Nov 04 2016 (23:52)
रोहित सिंह मुंदालिया   432 blog posts   433 correct pred (66% accurate)
Re# 2048013-3            Tags   Past Edits

  
1557 views
Nov 04 2016 (23:56)
IR no more Safe^~   23510 blog posts   100256 correct pred (75% accurate)
Re# 2048013-4            Tags   Past Edits
simple bhasa me kahe to kafi kam rehta hai abhi bhi.

2 posts are hidden.

  
1683 views
Nov 07 2016 (12:05)
rohitgl   8 blog posts   1 correct pred (50% accurate)
Re# 2048013-7            Tags   Past Edits
Thanks Rohit Singh ji.. Really thanks for all your time. If this work gets complete by March 2017, it would be great achievement and hope more trains would visit Hisar Railway Station
Page#    5 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 28
Trains with ARP 15 Dep on: Sat Sep 2
Trains with ARP 30 Dep on: Sun Sep 17
Trains with ARP 120 Dep on: Sat Dec 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.