Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jan 20, 2018 01:40:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jan 20, 2018 01:40:33 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by kpraveen34
Page#    43 Blog Entries  next>>
  
★★★  Rail Fanning
0 Followers
4215 views
Feb 21 2016 (22:32)   BSB/Varanasi Junction (9 PFs) | BRC/WAP-5/30094
 

Mohd Arif*^~   15212 blog posts   1542 correct pred (80% accurate)
Entry# 1745670            Tags   Past Edits
Brand New WAP5 #30094 Loco without Shed Marking Standing Idle at Varanasi Junction Yard with Recently POH WAP1 Loco #22056

7 posts are hidden.

  
2192 views
Feb 22 2016 (10:10)
kpraveen34   44 blog posts
Re# 1745670-8            Tags   Past Edits
From the CLW website, they are manufacturing only WAP7 and WAG9 series locos. Any idea how did we get WAP5 loco now?

  
2081 views
Feb 22 2016 (17:25)
❤️ ⚡ WAP5™ ⚡ ❤️   7027 blog posts   278 correct pred (91% accurate)
Re# 1745670-9            Tags   Past Edits
... which is not true. WAP5, WAP7 and WAG9 all of them are being produced! Only WAP4's production was stopped.
  
General Travel
0 Followers
5193 views
Jan 11 2016 (21:25)   55615/Guwahati - Silchar BG Fast Passenger (PT) | NHGJ/New Harangajao (1 PFs)
 

Pained to know Boeing 777 landcrashed~   23281 blog posts   21101 correct pred (68% accurate)
Entry# 1708103            Tags   Past Edits
How can China run Bullet train in Tibetan Plateau if we can't run passenger trains at a speed higher than 20 kmph in difficult terrain of Lumding Silchar?

6 posts are hidden.

  
2140 views
Feb 14 2016 (22:04)
kpraveen34   44 blog posts
Re# 1708103-7            Tags   Past Edits
I feel that, we need to see one proper rainy season and then if there are any flaws, railways will correct it...slowly situation can improve... Also a new railway line between Chandranathpur and New Silchar would do a lots of difference even if train runs slow in Mountain region. And this is possible only with the demand, and demand would improve after the railway line reaches Imphal.

  
2162 views
Feb 14 2016 (22:10)
Diamond Jubliee for KOL Locals^~   28270 blog posts   104346 correct pred (76% accurate)
Re# 1708103-8            Tags   Past Edits
work SCL started long back...
still it took so many years to be just linked on BG map... still no sign of train to DLI or proper train to KOAA

  
2107 views
Feb 14 2016 (22:23)
kpraveen34   44 blog posts
Re# 1708103-9            Tags   Past Edits
It is still far better than Hassan Mangalore railway line in SWR, Operations on this railway line started almost 10 years ago and there is only one daily and one try weekly express running on this section. And I am confidant that, once there is a demand there will be a supply automatically :).
  
Rail News
0 Followers
2085 views
Rail BudgetNFR/Northeast Frontier  -  
Feb 13 2016 (13:36)   Gogoi for double tracking of Guwahati-Tinsukia line
 

Mazi IRI~   34 news posts
Entry# 1737803   News Entry# 257209         Tags   Past Edits
Chief Minister Tarun Gogoi has requested Railway Minister Suresh Prabhu to include double tracking of railway lines from Guwahati to Tinsukia for better, safer and faster links with the rest of the country in his forthcoming Railway Budget 2016-17.
In a letter to the Minister for Railways today, the Chief Minister said the double tracking of railway lines from Guwahati to Tinsukia and expediting the ongoing doubling of the railway line stretch between New Bongaigaon and Kamakhya are crucial for growth and development of Assam and the region as a whole.
“The railway
...
more...
track in the State also needs to be electrified,” he added. The Chief Minister underscored the need for introduction of superfast daily express trains with limited stops outside Assam “from Dibrugarh/Guwahati to Mumbai/Pune in the west, Vellore/Chennai/Bangalore/ Trivandrum/Kochi in the south and Amritsar/ Jammu in the north.”
“Moreover, a Shatabdi train from Silchar to Guwahati and a Rajdhani Express from Silchar to New Delhi are required to be introduced to cater to the needs of the people of Barak Valley. The North East Express, which originates from Guwahati, may be extended to Silchar,” he said in the letter.
Gogoi also requested Prabhu to expedite the construction work of the much-delayed Bogibeel Rail-cum-Road Bridge, and a parallel bridge augmenting the existing Saraighat Bridge.
Gogoi also pleaded for a railway line from Silghat to Balipara via Tezpur with a Railway bridge over the Brahmaputra. The Chief Minister called for a separate zone for the NF Railways.
The Chief Minister underscored the need to upgrade the New Bongaigaon Railway Workshop to an Integrated Coach Factory and Production Unit.

3 posts are hidden.

  
10658 views
Feb 13 2016 (21:33)
kpraveen34   44 blog posts
Re# 1737803-4            Tags   Past Edits
He is talking about, Alipurduar in WB and Katihar in Bihar, but I feel that if these divisions are moved out of NFR, ER will try to terminate trains in Siliguri and Alipurduar which are in WB and ECR railway will try to terminate trains in Bihar. And it will become very difficult to extend trains to DBRG and other remote places. And it will be closure of gateway to rest of India, as they need to take permission of Katihar and Alipurduar divisions for introduction of new trains. It is very important to have control over trade routes in any part of the world.
  
Rail News
0 Followers
3729 views
Other News
Jan 30 2016 (17:05)   More Stops for Express Trains Proposed to Reduce Traffic
 

Jayashree   38671 news posts
Entry# 1725061   News Entry# 255493         Tags   Past Edits
BENGALURU:  As part of its efforts to ease traffic congestion within the City, the Bengaluru Railway Division has proposed that 50 pairs of Express trains stop at railway stations on the outskirts of the city.
Stoppages have been sought for most Express trains entering the city mainly at Channasandra, Yelahanka, Whitefield or Krishnarajapuram railway stations, according to a proposal submitted to the Hubballi Railway Division recently, say reliable railway sources.
“The proposal has to be okayed by the headquarters (Hubballi), the Railway Board and the Railway Ministry,” sources added. 
The
...
more...
congestion witnessed at Cantonment, Ypr and Majestic railway stations when long distance trains arrive and the scramble for buses and other modes of transport to various destinations in the city can be reduced massively, said a top railway official. “It will help in reducing road traffic within the city if this proposal is okayed,” he added.
Chief Passenger Transportation Member at South Western Railway Zone, Hubballi, A K Singh, said the proposal was being examined very positively by them. “We are actively looking at it. We do understand the congestion problems faced by Bengaluru. We want to facilitate easing of it.”
Refusing to divulge further details, Singh said it would take some time for a decision to be taken. “All I can say is that the first move towards this process has just started. The next railway time table will be out by July. If a decision is made, it could be announced in it,” he said.
A few Express trains presently stop at the stations but the proposal aims to have a manifold increase in the number of trains that stop at these stations. Out of the 50 pairs (onward and return) of Express trains, 15 pairs would stop at Yelahanka, eight pairs at Whitefield, 10 pairs at Krishnarajapuram and eight pairs at Channasandra, said a top railway source. Plans to stop a few pairs at Karmelaram station and other minor stations have also been suggested.
Channasandra railway station has to be upgraded with numerous facilities on the lines of K R Puram railway station before the process comes through, an official added.
Requested Train Stoppages
Whitefield station: Yeshwantpur-Howrah Express, Sangamitra Express, Brindavan Express and Kochuveli Express
Yelahanka: Sampakranti Express, Garib Rath (Secunderabad), Korba Express, Jabalpur Express, Ajmer Express and Jodhpur Express
Channasandra station: Coimbatore-Lokmanya Tilak Express, Udyan Express, Kacheguda Express, Shirdi Express and Hampi Express
Krishnarajapuram: Ypr-Howrah Express, Yeshwantpur-Kamakhya, Yeshwantpur-Lucknow Express and Dibrugarh-Mysuru Express.

5 posts are hidden.

  
1470 views
Jan 30 2016 (21:47)
kpraveen34   44 blog posts
Re# 1725061-6            Tags   Past Edits
Very useful step. In Channasandra, there is a second platform being built and the first platform length has been increased. But access(Foot over bridge) to second platform has to be provided, also if SWR can provide one more entry point towards RamaMurthy Nagar, it will be more useful. Hope all these will come up, once the demand raises.
  
Predictions: 9
confirm: 5
rac: 4
wl: 0
Journey: Sun Dec 20, 2015
Departure: BAY/Ballari Junction (Bellary) @ 22:45 PF#: 2
Arrival: SBC/KSR Bengaluru City Junction (Bangalore) @ 06:05 +1 night PF#: 8,9
Distance: 333 km / 678 km
Travel Time: 7h 20m  10 halts
Class: Sleeper - SL   |   Tot Seats: Avbl 299
16591/Hampi Express
PNR: 441-xxxxxxx   |   Similar PNRs
Entry# 1674630
Posted Status as of: Dec 08 2015 (20:57)
Passenger 1: Waitlist# 66 (Booking Status: W/L 71,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 20 2015 (17:19)
Passenger 1: SX2,54 [UB] (Booking Status: W/L 71,GNWL)
Chart PREPARED

  
1893 views
Dec 20 2015 (17:20)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 1674630-1            Tags   Past Edits
Page#    43 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jan 30
Trains with ARP 15 Dep on: Sun Feb 4
Trains with ARP 30 Dep on: Mon Feb 19
Trains with ARP 120 Dep on: Sun May 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.