Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 20:23:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 20:23:42 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by mallesh05
Page#    17 Blog Entries  next>>
  
General Travel
0 Followers
1843 views
Jan 26 2014 (10:23)   12761/Tirupati - Karimnagar SF Express | PDPL/Peddapalli Junction (2 PFs)
 

PDPL Junction   1810 blog posts   445 correct pred (68% accurate)
Entry# 975294            Tags   Past Edits
PDPL @ PF # 1.

1 posts are hidden.

  
1603 views
Feb 08 2014 (16:02)
mallesh05   29 blog posts
Re# 975294-2            Tags   Past Edits
This train should be extended to jagityal (LPJL).

  
1531 views
Feb 08 2014 (20:48)
PDPL Junction   1810 blog posts   445 correct pred (68% accurate)
Re# 975294-4            Tags   Past Edits
I think it will extand upto nzb after completion of pdpl-nzb line.......
  
General Travel
0 Followers
661 views
Feb 08 2014 (16:01)  
 

mallesh05   29 blog posts
Entry# 988662            Tags   Past Edits
There is a requirement for a new express train in the following route.
Sirpur kagaznagar-Majri Junction (MJRI)-Adilabad-Nanded (NED).
or at least from SKZR to ADB needed. Since east adilabad people suffering a lot to move their head quarter adilabad (specially in rainy season).
which connects the shiridi route/Mumbai route.
  
General Travel
0 Followers
897 views
Feb 05 2014 (13:11)  
 

mallesh05   29 blog posts
Entry# 985123            Tags   Past Edits
I propose a new DEMU train to utilize the PDPL-NZB track. Since the present train KRMR-SRUR-KRMR is not suitable for the passengers, everybody wants visit the headquarter, but this train is moving from KRMR to SRUR. or the present krmr passenger may diverted to kazipet and introduce a train from srur in this time table. The third line may be the advantage for the local trains when the goods are not coming in the line.
It is needed a train from sirpur kagaznagar to metpally or Jagityal in the following time table.
6.30 Sirpur
...
more...
Kagaznagar (SKZR) 20.15
7.45 Mancherial 19.00
9.00/9.15 Peddapalli 17.45
10.00 Karimnagar 17.00
11.45 Jagityal (LPJL) 15.15
13.00 Metpally 14.00
this train would be a great success to the karimnagar people and students.

  
750 views
Feb 08 2014 (15:56)
mallesh05   29 blog posts
Re# 985123-1            Tags   Past Edits
only views!?... comment please...
  
General Travel
0 Followers
1032 views
Feb 05 2014 (12:58)  
 

mallesh05   29 blog posts
Entry# 985105            Tags   Past Edits
since the track is fully constructed in between jagityal (LPJL) and metpally in PDPL-NZB route,
So IR should introduce a DEMU train in between Metpally and Kazipet (since there is no train in this route) in the following time table.
Metpally 7.00
Korutla 7.30
Jagityal
...
more...
(LPJL) 8.00
Karimnagar (KRMR) 9.40/9.45
*Peddapally (PDPL) 10.30/10.45
Jammikunta 11.45
Kazipet 13.00/14.00
Jammikunta 15.15
*Peddapally (PDPL) 16.15/16.30
Karimnagar (KRMR) 17.25/17.30
Jagityal (LPJL) 19.15
Metpally 20.15
*at peddapalli junction, thr passengers/commuters can catch Telangana (17035) and singareni (57123)towards to sirpur kagaznagar and the passengers from the telangana train (17036) and singareni (57124)can catch this train towards to karimnagar and metpally.
at kazipet station, the passengers from this train can catch the east-coast, shiridi express.
in later date, the same train may be extended to nizamabad (NZB) by reducing the slack time and increasing the speed.

  
788 views
Feb 05 2014 (13:00)
WAITING FOR UDAY~   6164 blog posts
Re# 985105-1            Tags   Past Edits
what is the status of line from Metpally to Armoor?

  
856 views
Feb 08 2014 (15:55)
mallesh05   29 blog posts
Re# 985105-2            Tags   Past Edits
Still it is under construction. but up to metpally the track is good and renovation of station buildings going on. platforms and tracks are very beautiful. I did not find any signals at stations, but trail run took the place in this route. A train towards kazipet will be useful to employees and students under the above time table (specially at krmr).
  
Greetings
0 Followers
4495 views
Nov 21 2013 (20:09)   07113/Karimnagar - Kollam Sabarimala Special Fare | KRMR/Karimnagar (2 PFs)
 

PDPL Junction   1810 blog posts   445 correct pred (68% accurate)
Entry# 912979            Tags   Past Edits
Train No.07113 Karimnagar-
Kollam Sabarimalai Special Train
(via. Warangal, Vijayawada,
Gudur, Renigunta, Tirupati,
Katpadi, Salem) ( 01 service):
Train
...
more...
No. 07113
Karimnagar - Kollam special
train will depart Karimnagar at
21.15 hrs on 30th Dec, 2013 and
arrive Kollam at 03 45 hrs on the
second day.
Enroute, this special train
will stop at Peddapalli, Jammikunta,
Warangal, Mahbubabad, Dornakal,
Khammam, Vijayawada, Tenali,
Nidubrolu, Bapatla, Chirala, ongole,
Kavali, Nellore, Gudur, Venkatagiri,
Sri Kalahasti, Renigunta, Tirupati,
Chittoor, Katpadi, Gudiyattam,
Vaniyambadi, Jolarpettai, Salem,
Erode, Tirupur, Coimbatore,
Palakkad, Thrisur, Aluva,
Ernakulam Town, Kottayam,
Tiruvalla, Chengannur, Mavelikara
and Kayankulam.
These special trains will
consist of II AC, III AC, Sleeper
Class, General Second Class.

5 posts are hidden.

  
4015 views
Nov 22 2013 (14:03)
mallesh05   29 blog posts
Re# 912979-6            Tags   Past Edits
This train should start from Jagityal instead Karimnagar.

  
4019 views
Nov 22 2013 (14:05)
PDPL Junction   1810 blog posts   445 correct pred (68% accurate)
Re# 912979-7            Tags   Past Edits
They r given one trip only.....it will possible when pdpl-krmr-nzb complete.
Page#    17 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Aug 5
Trains with ARP 15 Dep on: Thu Aug 10
Trains with ARP 30 Dep on: Fri Aug 25
Trains with ARP 120 Dep on: Thu Nov 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.