Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 12:39:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 12:39:28 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Increase SL fare Reduce AC fare
Page#    221 Blog Entries  next>>
  
Predictions: 6
confirm: 6
rac: 0
wl: 0
Journey: Tue Aug 08, 2017 @ 12:00
Class: Sleeper - SL
Travel: ANG/Ahmadnagar   to   JP/Jaipur Junction
12627/Karnataka Express (PT)
Entry# 2373541

PNR: 413-xxxxxxx   |   Similar PNRs
Posted Status as of: Aug 07 2017 (14:20)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: RLWL# 71 (GN) (Booking Status: RLWL# 118)
Passenger 2: RLWL# 72 (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 73 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 07 2017 (21:23)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/NC (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/NC (GN) (Booking Status: RLWL# 119)
Passenger 3: Confirmed: S6/52 [LB]/LB (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart PREPARED
Train Number: 12627 (TT of this Train needs to be fixed)

Full PNR Status History (5 statuses)
Status as of: Aug 07 2017 (21:23)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/NC (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/NC (GN) (Booking Status: RLWL# 119)
Passenger 3: Confirmed: S6/52 [LB]/LB (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart PREPARED
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 07 2017 (19:34)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/LB (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/SU (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 67 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 07 2017 (15:19)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/LB (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/SU (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 73 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 07 2017 (14:18)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: RLWL# 71 (GN) (Booking Status: RLWL# 118)
Passenger 2: RLWL# 72 (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 73 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 06 2017 (17:58)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: RLWL# 81 (GN) (Booking Status: RLWL# 118)
Passenger 2: RLWL# 82 (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 83 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)


1 posts are hidden.

  
504 views
Aug 13 2017 (02:03)
Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Re# 2373541-2            Tags   Past Edits
Yes.. At PRS counter, you can take blank paper tickets

  
290 views
Aug 17 2017 (10:29)
rshbaggarwal283   520 blog posts   167 correct pred (58% accurate)
Re# 2373541-3            Tags   Past Edits
Okay Thanks. I guess for AC class we cannot take, but we can only take for SL class.

  
212 views
Aug 19 2017 (11:37)
Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Re# 2373541-4            Tags   Past Edits
You did not guess right...... You can take for any class

  
136 views
Yesterday (19:43)
rshbaggarwal283   520 blog posts   167 correct pred (58% accurate)
Re# 2373541-5            Tags   Past Edits
But AC class blank paper tickets were discontinued from July 1st. Isn't it true?

1 posts are hidden.

  
106 views
Yesterday (19:54)
Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Re# 2373541-7            Tags   Past Edits
I didn't take after 1st July.. Any link for confirmation?
  
General Travel
0 Followers
475 views
Aug 14 2017 (23:13)   RE/Rewari Junction (8 PFs)

Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Entry# 2380506            Tags   Past Edits
DELHI-REWARI section will be electrified in just 9 MONTHS.. Means in June, 2018 Delhi-Alwar section or Delhi-Mathura via Alwar will be fully elctric

  
304 views
Aug 15 2017 (20:42)
Aditya*^~   4588 blog posts   2417 correct pred (69% accurate)
Re# 2380506-1            Tags   Past Edits
I think in this press release, IR is referring Gurgaon as "Gurugram". which is a mistake. haryana government has changed city name. Station name is still Gurgaon

  
240 views
Aug 16 2017 (01:38)
Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Re# 2380506-2            Tags   Past Edits
Yes

2 posts are hidden.
  
General Travel
0 Followers
536 views
Aug 14 2017 (23:22)   DEE/Delhi Sarai Rohilla (5 PFs)

Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Entry# 2380515            Tags   Past Edits
Details of Delhi Sarai Rohilla to Rewari electrification

  
303 views
Aug 15 2017 (12:47)
★★★BRC WAP 7😎 with BCT RAJDHANI~   1457 blog posts   1929 correct pred (90% accurate)
Re# 2380515-1            Tags   Past Edits
sp ssp tss... please explain me

  
343 views
Aug 15 2017 (16:09)
Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Re# 2380515-2            Tags   Past Edits
#ELECTRIFICATION DETAILS:------>
Sectioning and Paralleling Post (SP)
These posts are situated approximately midway between feeding posts marking the demarcating point of two zones fed from different phases from adjacent sub-stations. At these posts, a neutral section is provided to make it impossible for the pantograph of an electric locomotive or EMU train to bridge the different phases of 25 kV supply, while passing from the zone fed from one sub-station to the next one. Since the neutral section remains 'dead', warning boards are provided in advance to warn and remind the Driver
...
more...
of an approaching electric locomotive/EMU to open locomotive circuit breaker (DJ) before approaching the 'neutral section', to coast through it and then switch 'on' on the other side. Special care is taken in fixing the location of neutral sections, on level tangent tracks far away from signals, level crossing gates etc. to ensure that the train coasts through the neutral section at a sufficiently high speed, to obviate the possibility of its stopping and getting stuck within the neutral section.
A paralleling interruptor is provided at each 'SP' to parallel the OHE of the up and down tracks of a double track section, 'bridging interrupters' are also provided to permit one feeding post to feed beyond the sectioning post upto the next FP if its 25 kV supply is interrupted for some reasons. These bridging interruptors are normally kept open and should only be closed after taking special precautions as detailed in these rules.
Sub-Sectioning and Paralleling Post (SSP)
One or more SSPs are provided between each FP and adjacent SP depending upon the distance between them. In a double track section, normally three interruptors are provided at each SSP i.e. two connecting the adjacent sub-sectors of up and down tracks and one for paralleling the up and down tracks.
Source:
click here
  
General Travel
0 Followers
697 views
Aug 02 2017 (00:31)   SWD/Sanawad (1 PFs)

Rajasthan must gt 15000 crore for Railwy developmn^~   84508 blog posts   5303 correct pred (78% accurate)
Entry# 2368420            Tags   Past Edits
As per news sources Mhow Sanawad #MegaBlock from October
#GC

3 posts are hidden.

  
501 views
Aug 03 2017 (22:03)
Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Re# 2368420-5            Tags   Past Edits
What is about Sanawad to Khandwa line??

  
481 views
Aug 03 2017 (23:30)
Rajasthan must gt 15000 crore for Railwy developmn^~   84508 blog posts   5303 correct pred (78% accurate)
Re# 2368420-6            Tags   Past Edits
Already in Mega Block.
  
Jul 29 2017 (20:59)   MTJ/Mathura Junction (10 PFs)

Increase SL fare Reduce AC fare   428 blog posts   61 correct pred (70% accurate)
Entry# 2365953            Tags   Past Edits
Alwar-Mathura section speed 120KMPH
Page#    221 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.