Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jul 25, 2017 18:31:24 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jul 25, 2017 18:31:24 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by deepakmk
Page#    7 Blog Entries  next>>
  
General Travel
0 Followers
425 views
Jul 08 2014 (22:54)   MYS/Mysuru Junction (Mysore) (6 PFs)
 

deepakmk   8 blog posts
Entry# 1158523            Tags   Past Edits
As per this news report click here it is mentioned "Utilising the latest technology, trains will be run on a single track for one and half kilometre stretch near the armoury". Could not understand what it means. Trains are already run on single track at present. Can anybody please enlighten?
  
Social
0 Followers
1945 views
Jul 08 2014 (15:42)   MYS/Mysuru Junction (Mysore) (6 PFs)
 

Vijeth Bharadwaj*^~   1538 blog posts   11224 correct pred (92% accurate)
Entry# 1158107            Tags   Past Edits
A big zero for Mysore Region

10 posts are hidden.

  
493 views
Jul 08 2014 (17:48)
deepakmk   8 blog posts
Re# 1158107-11            Tags   Past Edits
Doubling and Electrification are yet to be completed on SBC-MYS section and there was no mention of expediting it - so hsrcp is some way away from happening. 2 extended trains will only add to the congestion :(

10 posts are hidden.
  
★★  General Travel
0 Followers
3328 views
Jul 08 2014 (17:19)  
 

Stand Alone~   3010 blog posts   17711 correct pred (93% accurate)
Entry# 1158231            Tags   Past Edits
concept of bullet train will be a failure where as concept of high speed train is the one we should focus on

13 posts are hidden.

  
467 views
Jul 08 2014 (17:38)
deepakmk   8 blog posts
Re# 1158231-14            Tags   Past Edits
It is better to upgrade existing lines than go for white elephants like Bullet Train.

  
453 views
Jul 08 2014 (17:41)
Stand Alone~   3010 blog posts   17711 correct pred (93% accurate)
Re# 1158231-15            Tags   Past Edits
ya correctly said rather than going with false nationalism

  
443 views
Jul 08 2014 (17:42)
Stand Alone~   3010 blog posts   17711 correct pred (93% accurate)
Re# 1158231-16            Tags   Past Edits
when will we use the p5 n p7 upto there potential

24 posts are hidden.
  
General Travel
0 Followers
1451 views
Sep 13 2013 (17:45)   12008/Mysuru - Chennai Central Shatabdi Express
 

deepakmk   8 blog posts
Entry# 851055            Tags   Past Edits
Train delayed by 2 hrs. Regular occurrence on MYS SBC sector.

  
1127 views
Sep 13 2013 (18:34)
12658 Chennai Mail*^~   9259 blog posts   23380 correct pred (64% accurate)
Re# 851055-1            Tags   Past Edits
Y any probem ?

  
1261 views
Sep 14 2013 (17:06)
deepakmk   8 blog posts
Re# 851055-2            Tags   Past Edits
Could be various works going on for line doubling.

  
1262 views
Sep 14 2013 (17:10)
Kuppam KSR Bengaluru New Memu From January 16   2388 blog posts
Re# 851055-3            Tags   Past Edits
Ya its due to doubling works can be covered in SBC-MAS section
  
General Travel
0 Followers
351 views
Aug 27 2013 (23:45)  
 

deepakmk   8 blog posts
Entry# 837595            Tags   Past Edits
Screenshot from my Ipad GPS on 16557 Rajya Rani Express MYS SBC. Train exceeded 101 kmph on a couple of occasions.
Page#    7 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Aug 4
Trains with ARP 15 Dep on: Wed Aug 9
Trains with ARP 30 Dep on: Thu Aug 24
Trains with ARP 120 Dep on: Wed Nov 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.