Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jul 23, 2017 08:31:32 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jul 23, 2017 08:31:32 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by venkyprivate1
Page#    65 Blog Entries  next>>
  
★★★  Info Update
0 Followers
12848 views
Feb 06 2017 (11:42)   SUR/Solapur (5 PFs)

Solapur Superfast~   1697 blog posts   66 correct pred (72% accurate)
Entry# 2153263            Tags   Past Edits
#PuneSolapurDoubling
Double line between Mohol and Vakav is operational from today.. :)
It will save 10-15 mins journey time as per railway officials..

48 posts are hidden.

  
655 views
Jul 08 2017 (15:53)
venkyprivate1   107 blog posts   7 correct pred (88% accurate)
Re# 2153263-49            Tags   Past Edits
Thanks Bro for the update.
I am eagerly waiting when the entire line of pune-wadi becomes double line.

7 posts are hidden.
  
★★★  General Travel
1 Followers
2011 views
Jul 03 2017 (00:11)  

Shivam~   4358 blog posts   1172 correct pred (87% accurate)
Entry# 2340382            Tags   Past Edits
5 compliments
RIP😥😥 May his soul rest in peace😢😢 May his soul rest in peace. 😢😢 परमात्मा उनकी आत्मा को शांति दे🙏😔 RIP 🙁🙁
Sad Demise of a previously active member from SCR and co-railfan, Sumanth Chowdary, RIP.
Monitors/Admins if I have tagged a wrong id please fix that.

17 posts are hidden.

  
375 views
Jul 03 2017 (12:14)
venkyprivate1   107 blog posts   7 correct pred (88% accurate)
Re# 2340382-20            Tags   Past Edits
RIP

14 posts are hidden.
  
Rail News
0 Followers
2055 views
New Facilities/TechnologySCR/South Central  -  IR Press Release 
May 17 2017 (19:53)   No.106/2017-18 17-05-2017 Secunderabad Commissioning of Electrification on Guntakal-Raichur-Wadi Section and Nallapadu-Cumbum Section of SCR; - Significant Milestone in the path of progress

knkprasad956*^~   533 news posts
Entry# 2280676   News Entry# 302693         Tags   Past Edits
No.106/2017-18 17-05-2017
Secunderabad
Commissioning of Electrification on Guntakal-Raichur-Wadi Section and Nallapadu-Cumbum Section of SCR; - Significant Milestone in the path of progress
South Central Railway achieved another significant milestone with the commissioning of Electrical Traction o­n Guntakal-Raichur-Wadi section and Nallapadu-Cumbum section of Guntur-Nandyal rail route. Commissioner of Railway Safety (CRS) issued authorisation for introduction of Electrical Traction o­n these two routes with a length a
...
more...
301 Route kilometres and 517 Track Kilometres in o­ne go. CRS authorization issued for electrical traction of Guntakal-Chiksugur section (136 Rkm) and Nallapadu-Cumbum section (165 Rkm).
Shri Vinod Kumar Yadav, General Manager, South Central Railway has been focussing o­n providing new impetus to the speedy completion of all infrastructural works o­n SCR. He conducted extensive works review meetings with Rail Viksas Nigam Limited (RVNL) and Centre for Railway Electrification Organisation (CORE) officials to facilitate timely execution of the projects. His initiatives facilitated timely approval of plans, budgetary sanctions and speedy execution of the works as well as prompt certification of Commissioner Railway Safety for the projects which helps in the Operational convenience and improving the mobility of Passenger and Freight Trains. It is a new record in the history of South Central Railway to get CRS authorisation for 517 kms length of Electric Traction in o­ne go
Guntakal-Raichur-Wadi Electrification project
The Guntakal-Raichur-Wadi section which provides a vital link towards Mumbai and North India from Chennai, Bengaluru and Southern parts. Guntakal-Wadi Electrification project was sanctioned in the year 2009-10. This section has 228 Route Kilometres and 547 Track Kilometres. The Guntakal-Chiksugur section comprising 136 route kilometre length was authorized for introduction of electrical traction by Commissioner of Railway Safety recently. The entire project was executed with an expenditure of 207.7 crores. The electrification works of this section were taken up in two parts i.e., Wadi-Raichur & Guntakal-Raichur sections. Wadi-Raichur section has a length of 107 route kilometres and a length of 260 track kilometres. Guntakal-Raichur section has a length of 121 route kilometres and a length of 287 track kilometres. This section is having a total of 26 stations Enroute, 49 Manned level crossings and 17 Un-manned level crossings.
The completion of electrification between Wadi and Guntakal will enable to run Trains with Electric engines between Mumbai, New Delhi and Bengaluru, Chennai. Commissioner of Railway Safety authorised for running of electrical locomotives o­n Chiksugur-Guntakal Sectionrecently.
Electrification of Nallapadu-Cumbum Section (165 Rkm)
The electrification of the Section Nallapadu-Cumbum-Diguvametta-Dhone-Guntakal, with a total 426 Route Kilometer was sanctioned at an estimated cost of Rs. 363.32 Cr. during the year 2012-13. So far an amount of Rs.261.46 was incurred for the Nallapadu-Diguvametta section.
As a part of the electrification project, the section between Nallapadu-Cumbum is completed o­n Guntur-Nandyal-Guntakal rail route. Nallapadu-Cumbum section comprises of 165 Route Kilometers and 200 Track Kilometers. Commissioner of Railway Safety, South Central Circle/Secunderabad has conducted statutory inspection and authorized for introduction of passenger train services o­n electric traction was issued.
The advantages of this Electric Traction in the section of Nallapadu-Cumbum
will be –
The passenger Trains between Tenali-Markapur can be converted from Diesel Loco hauling to Electric Loco hauling which will save diesel cost, avoid pollution with increased sectional speed for optimum utilization.
All Diesel hauled Trains (Passenger/Goods) will run o­n Electric Traction from Vijayawada to Guntur and can be extended up to Markapur covering also Narsaraopet and Vinukonda.
(M. Umashankar Kumar)
Chief Public Relations Officer
Back
Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy

1 posts are hidden.

  
1269 views
May 17 2017 (21:43)
venkyprivate1   107 blog posts   7 correct pred (88% accurate)
Re# 2280676-2            Tags   Past Edits
Wish Daund-Wadi-Gulbarga is also doubled and electrified, so that CSTM-Hyb-BZA/GNT-VSKP-BBS would run with e locos.

2 posts are hidden.

  
1048 views
May 17 2017 (23:12)
SRG*^~   35725 blog posts   173953 correct pred (76% accurate)
Re# 2280676-5            Tags   Past Edits
Thats next phase of the project it will be done...

3 posts are hidden.
  
Predictions: 4
confirm: 4
rac: 0
wl: 0
Journey: Sat Jun 03, 2017 @ 13:00
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 59
Travel: BZA/Vijayawada Junction   to   PUNE/Pune Junction   |   910 km / 1331 km
17221/Kakinada Port - Lokmanya Tilak Terminus Express (PT)
Entry# 2263933

Posted by: venkyprivate1   107 blog posts   7 correct pred (88% accurate)
PNR: 475-xxxxxxx   |   Similar PNRs
Posted Status as of: May 05 2017 (12:50)
Passenger 1: Waitlist# 29 (Booking Status: W/L 40,GNWL)
Passenger 2: Waitlist# 30 (Booking Status: W/L 41,GNWL)
Passenger 3: Waitlist# 31 (Booking Status: W/L 42,GNWL)
Total Fare:  3540
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 02 2017 (21:31)
Boarding Point: BZA/Vijayawada Junction
Resv To: PUNE/Pune Junction
Resv Quota: GN
Passenger 1: Confirmed: BE1/51 [UB]/UB (GN) (Booking Status: WL# 40)
Passenger 2: Confirmed: BE1/53 [MB]/MB (GN) (Booking Status: WL# 41)
Passenger 3: Confirmed: BE1/54 [UB]/UB (GN) (Booking Status: WL# 42)
Total Fare:  3540
Chart PREPARED

Full PNR Status History (7 statuses)
Status as of: Jun 02 2017 (21:31)
Boarding Point: BZA/Vijayawada Junction
Resv To: PUNE/Pune Junction
Resv Quota: GN
Passenger 1: Confirmed: BE1/51 [UB]/UB (GN) (Booking Status: WL# 40)
Passenger 2: Confirmed: BE1/53 [MB]/MB (GN) (Booking Status: WL# 41)
Passenger 3: Confirmed: BE1/54 [UB]/UB (GN) (Booking Status: WL# 42)
Total Fare:  3540
Chart PREPARED

Status as of: May 22 2017 (16:53)
Boarding Point: BZA/Vijayawada Junction
Resv To: PUNE/Pune Junction
Resv Quota: GN
Passenger 1: WL# 12 (Booking Status: WL# 40)
Passenger 2: WL# 13 (Booking Status: WL# 41)
Passenger 3: WL# 14 (Booking Status: WL# 42)
Total Fare:  3540
Chart NOT Prepared

Status as of: May 20 2017 (02:18)
Boarding Point: BZA/Vijayawada Junction
Resv To: PUNE/Pune Junction
Resv Quota: GN
Passenger 1: WL# 15 (Booking Status: WL# 40)
Passenger 2: WL# 16 (Booking Status: WL# 41)
Passenger 3: WL# 17 (Booking Status: WL# 42)
Total Fare:  3540
Chart NOT Prepared

Status as of: May 18 2017 (18:53)
Boarding Point: BZA/Vijayawada Junction
Resv To: PUNE/Pune Junction
Resv Quota: GN
Passenger 1: WL# 19 (Booking Status: WL# 40)
Passenger 2: WL# 20 (Booking Status: WL# 41)
Passenger 3: WL# 21 (Booking Status: WL# 42)
Total Fare:  3540
Chart NOT Prepared

Status as of: May 17 2017 (21:11)
Boarding Point: BZA/Vijayawada Junction
Resv To: PUNE/Pune Junction
Resv Quota: GN
Passenger 1: WL# 23 (Booking Status: WL# 40)
Passenger 2: WL# 24 (Booking Status: WL# 41)
Passenger 3: WL# 25 (Booking Status: WL# 42)
Total Fare:  3540
Chart NOT Prepared

Status as of: May 08 2017 (11:51)
Passenger 1: Waitlist# 26 (Booking Status: W/L 40,GNWL)
Passenger 2: Waitlist# 27 (Booking Status: W/L 41,GNWL)
Passenger 3: Waitlist# 28 (Booking Status: W/L 42,GNWL)
Total Fare:  3540
Chart NOT Prepared

Status as of: May 05 2017 (12:49)
Passenger 1: Waitlist# 29 (Booking Status: W/L 40,GNWL)
Passenger 2: Waitlist# 30 (Booking Status: W/L 41,GNWL)
Passenger 3: Waitlist# 31 (Booking Status: W/L 42,GNWL)
Total Fare:  3540
Chart NOT Prepared


  
1264 views
May 11 2017 (16:08)
venkyprivate1   107 blog posts   7 correct pred (88% accurate)
Re# 2263933-1            Tags   Past Edits
guys can you please predict this PNR?
  
General Travel
0 Followers
982 views
May 07 2017 (15:38)   12128/Pune - Mumbai CSMT Intercity SF Express

venkyprivate1   107 blog posts   7 correct pred (88% accurate)
Entry# 2266982            Tags   Past Edits
i was planning to board this train with family from pune to lonalava in general..should the general seats be available today?

  
976 views
May 07 2017 (15:39)
venkyprivate1   107 blog posts   7 correct pred (88% accurate)
Re# 2266982-1            Tags   Past Edits
please reply soon
Page#    65 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Aug 2
Trains with ARP 15 Dep on: Mon Aug 7
Trains with ARP 30 Dep on: Tue Aug 22
Trains with ARP 120 Dep on: Mon Nov 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.