Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 24, 2017 07:01:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 24, 2017 07:01:13 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Modi for PM in 2019
Page#    21 Blog Entries  next>>
  
General Travel
0 Followers
2169 views
Sep 13 2016 (23:13)   04425/Kochuveli - Hazrat Nizamuddin SpecialFare SF AC Special
 

Modi for PM in 2019   42 blog posts
Entry# 1990893            Tags   Past Edits
Why irctc not showing the availability of this train beyond 27/9/2016.
  
General Travel
0 Followers
1823 views
Sep 13 2016 (23:12)   04425/Kochuveli - Hazrat Nizamuddin SpecialFare SF AC Special
 

Modi for PM in 2019   42 blog posts
Entry# 1990891            Tags   Past Edits
Arrived 1hr 30 mins late on Monday at Tiruppur
  
General Travel
0 Followers
1922 views
Sep 05 2016 (14:58)   22402/Udhampur - Delhi Sarai Rohilla AC Express
 

Modi for PM in 2019   42 blog posts
Entry# 1981943            Tags   Past Edits
When the UHP-Katra railway line is Fully converted into 25KV, then why not the trains terminating at Katra get the end to end electric loco. Why there is so much delay in CRS Inspection. Have a look at this
click here

  
1802 views
Sep 08 2016 (09:31)
AS*^~   4658 blog posts   2661 correct pred (79% accurate)
Re# 1981943-1            Tags   Past Edits
crs inspection already done nd jat svdk line is not fully converted to 25kv
  
General Travel
0 Followers
5750 views
Sep 05 2016 (23:34)   16857/Puducherry - Mangaluru Central Express (Via Tiruchchirappalli)
 

Modi for PM in 2019   42 blog posts
Entry# 1982373            Tags   Past Edits
By the end of 2018, we could see this train and many other trains running with WAPPIES End to End. Because Mangalore is all set to be completely electrified by the 2016 end. The only section left will be Karur section which will be electrified by 2018 end.

  
5320 views
Sep 05 2016 (23:46)
JBP ET OHE OMG 😲~   13872 blog posts   22 correct pred (43% accurate)
Re# 1982373-1            Tags   Past Edits
2 saal tk crs h hota rhega kya

  
5244 views
Sep 06 2016 (20:26)
Modi for PM in 2019   42 blog posts
Re# 1982373-2            Tags   Past Edits
Bhai Karur is in Tamil Nadu and Mangalore is in Karnataka and Karur Electrification has just started between Erode-Karur-Tiruchirapalli but Shoranur-Charvttur CRS is over and by the end of 2016 Manglore CRS will get over. So the Puducherry to Mangalore train can get WAP only between Erode-Mangalore.

  
5306 views
Sep 06 2016 (20:38)
Modi for PM in 2019   42 blog posts
Re# 1982373-3            Tags   Past Edits
Yeh Tamil Nadu aur Kerala and Karnataka mein rehne wala hi samajh payega.
There are 2 routes

By the end of 2016 all train coming from Chennai via JTJ-ED-CBE-SRR-MAQ will get WAP.
Till
...
more...
No MAS-MAQ TRAIN GETS WAP till SRR AND WDM from there to MAQ.
BUT Any train going to Managalore via Karur can go only on Diesel Engine till Erode. From Erode it can get ED WAP 4.
FOR EG. Train No. 12687 Madurai-Dehradun
It uses WDM 3D Between MDU-DG-KRR AND Loco change happens at Erode to Electric Loco.
Now two route are in electrification
Erode-Karur-Trichy
Salem-Karur-Trichy and also upto Dindigul. Total 300 kms which will get end by 2018 end or 2019 March.
Then all trains going from Coimbatore -Madurai,Nagercoil,Tuticorin,Trichy,Villupuram, Melmaruvathur, Puducherry will get End to End E-Loco

  
5308 views
Sep 06 2016 (21:08)
JBP ET OHE OMG 😲~   13872 blog posts   22 correct pred (43% accurate)
Re# 1982373-4            Tags   Past Edits
Quite useful
  
★  Rail Fanning
0 Followers
2022 views
Sep 04 2016 (18:26)   MAQ/Mangaluru Central (Mangalore) (4 PFs)
 

Mohd Arif   15132 blog posts   1525 correct pred (80% accurate)
Entry# 1981218            Tags   Past Edits
Mangaluru Central Yard

2 posts are hidden.

  
1630 views
Sep 06 2016 (20:57)
Modi for PM in 2019   42 blog posts
Re# 1981218-3            Tags   Past Edits
According to CORE, line is expected for CRS inspection in October.
Page#    21 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Sep 3
Trains with ARP 15 Dep on: Fri Sep 8
Trains with ARP 30 Dep on: Sat Sep 23
Trains with ARP 120 Dep on: Fri Dec 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.