Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Aug 18, 2017 03:21:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Aug 18, 2017 03:21:26 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ranjeev Arun TVR~
Page#    130 Blog Entries  next>>
  
Timeline
0 Followers
12 views

IR no more Safe^~
Yesterday (15:05)
Yesterday (14:53)   Bhagat Ki Kothi - Mannargudi Weekly Express (PT)/16863   Train - Station Platform - TVR/Thiruvarur Junction (5 PFs)

Ranjeev Arun TVR~   49 Conf TLs   39 Void TLs
TVR/Thiruvarur Junction (5 PFs): 3

Jun 02 2016 (12:23)   (previous value)
Timeline Entry# 783493
by: Ranjeev Arun TVR~
TVR/Thiruvarur Junction (5 PFs): 2

  
64 views
Yesterday (15:00)
I M BACK^~   1343 blog posts   6426 correct pred (87% accurate)
Re# 2382711-1            Tags   Past Edits
2 june ko Platform no 02 in 2 months its change Plz provide Proof and Get Cnf
  
General Travel
0 Followers
728 views
Jun 30 2017 (17:30)   TVR/Thiruvarur Junction (5 PFs)

Ranjeev Arun TVR~   201 blog posts
Entry# 2337643            Tags   Past Edits
In Thiruvarur Jn

  
386 views
Aug 08 2017 (10:12)
waiting for PPI JBP elfication~   3549 blog posts   44 correct pred (50% accurate)
Re# 2337643-1            Tags   Past Edits
oh so we can expect elocos on TPJ-KIK and NGT-VLKN route by next year mid??

  
268 views
Aug 10 2017 (16:19)
Ranjeev Arun TVR~   201 blog posts
Re# 2337643-2            Tags   Past Edits
Hope !!!
  
General Travel
0 Followers
330 views
Aug 07 2017 (21:05)  

Ranjeev Arun TVR~   201 blog posts
Entry# 2373821            Tags   Past Edits
So here the proof for Electrification works going in full swing between TJ and TVR .
Dedicated to our onE of the forum member for asked me before to get some photos regarding this E Works.
Photo taken in Koyil venni Station.
Moderators try to indicate TJ to TVR in E Colour..

  
172 views
Aug 10 2017 (01:17)
rahultup380   160 blog posts   1 correct pred (100% accurate)
Re# 2373821-1            Tags   Past Edits
Post some videos and further more images of electrifcation of that section. I know that work is sanctioned and given to EVM Quattro Joint Venture. The work is also metioned to be completed within 2018 on Core website.
  
General Travel
1 Followers
2143 views
Jun 28 2017 (11:44)   TVR/Thiruvarur Junction (5 PFs)

Ranjeev Arun TVR~   201 blog posts
Entry# 2335092            Tags   Past Edits
Dear Moderators, In Atlas Map Y TJ-TVR line not mentioned Electrification line? Works based on Concrete Base for E Beams going on ,From TJ and Now the Process attain ahead of NMJ Towards TVR In.
But VM-TJ line is Just Sanctioned. and it shows E Blue .

14 posts - Thu Jun 29, 2017

  
584 views
Jun 29 2017 (13:12)
Ranjeev Arun TVR~   201 blog posts
Re# 2335092-16            Tags   Past Edits
Bro, Hope u knew MV-TVR line comes under VM-TJ Electrification Announcement..And site Mistakenly ignore MV-TVR line when VM-TJ Line was changed to ELine in Rail Atlas..Hope U GIve E line for MV-TVR also ..

  
663 views
Jun 29 2017 (13:51)
Science is better than Engineering and Technology*^~   14467 blog posts   2 correct pred (100% accurate)
Re# 2335092-17            Tags   Past Edits
dont worry bro. i will update when works starts progressing in good phase. as of now i seeing TPJ TJ doubling work happens. these r just ground works. when ever i come to NGT i am seeing lines in TVR NGT sides. so no problem. whenever u visit u just post photos.

  
288 views
Aug 08 2017 (09:07)
Ranjeev Arun TVR~   201 blog posts
Re# 2335092-18            Tags   Past Edits
I posted images yesTerday for Proof..So Try to Update

  
313 views
Aug 08 2017 (10:08)
waiting for PPI JBP elfication~   3549 blog posts   44 correct pred (50% accurate)
Re# 2335092-19            Tags   Past Edits
oh wow good news for TPJ-NGT-KIK AND NGT-VLKN route passengers as soon trains will run with elocos on these routes and may b by next year we can expect full elocos on this route and may be speeden up of trains also and what is the status of efication work b/w TPJ-KIK and NGT-VLKN??

1 posts are hidden.

  
241 views
Aug 08 2017 (11:06)
Science is better than Engineering and Technology*^~   14467 blog posts   2 correct pred (100% accurate)
Re# 2335092-21            Tags   Past Edits
ok sure will update in free time .
  
General Travel
0 Followers
940 views
Jul 04 2017 (14:50)   16231/Mayiladuthurai - Mysuru (Thanjavur) Express (PT)

Ranjeev Arun TVR~   201 blog posts
Entry# 2341875            Tags   Past Edits
In IRCTC rail app , MV-MYS train Shows 2A 3A CC SL..
CC coach in this tRain ? ☺

  
921 views
Jul 04 2017 (14:51)
IR no more Safe^~   23481 blog posts   100247 correct pred (75% accurate)
Re# 2341875-1            Tags   Past Edits
Coach B2 will bw treated as ACC coach between Mysore and Bangalore and can be booked through current booking counters
.
check latest box

  
916 views
Jul 04 2017 (14:56)
Pandian SF Express^~   313 blog posts   20726 correct pred (79% accurate)
Re# 2341875-2            Tags   Past Edits
they r mentioning 3A as CC here....from mysore to bengaluru city they fixed the fare as normal AC chair car fare and one can avail this instead of paying for 3A because just max 3 hrs of travel so they fixed the rate as AC CC rates....here B2 coach will be treated as CC coach from MYS to SBC and in return also SBC to MYS
Page#    130 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 28
Trains with ARP 15 Dep on: Sat Sep 2
Trains with ARP 30 Dep on: Sun Sep 17
Trains with ARP 120 Dep on: Sat Dec 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.